Traditional Culture Encyclopedia - Almanac inquiry - Female 73 years Niu Nan 74 years tiger symbol 200 1 snake ornaments from August to auspicious day of the ecliptic.

Female 73 years Niu Nan 74 years tiger symbol 200 1 snake ornaments from August to auspicious day of the ecliptic.

August, 2065438+2004, I am waiting for you. This is a good day to decorate the ugly wooden cow Jiayin Water Margin:

20 14-08-04 lunar new year's day -07-09- Monday: rushing cattle (ugly) and insulting the west.

20 14 August 9th Lunar July (small) Saturday, 14 Ma Chong (Bingwu) Shanan.

On Monday, 23rd July of the lunar calendar, Dongsha (Mao Yi) was rushed.

On Tuesday, the 24th day of the seventh lunar month, we rushed to Shabei, Chen Bing.

Ma Chong (Wuwu) Shanan on Thursday, July 26th of the lunar calendar.

Monday, August 25th of the lunar calendar, Chonggou (Shu Ren) Shanan.

China Lunar New Year on August 26th, 2004 (August 2nd) Dongsha Zhu Chong.

On Thursday, August 4th, 2006, it was the year of the China Lunar New Year.

2065438+Saturday, August 30th, 2004, the sixth day of the eighth lunar month (big) Chongtu (Dingmao) Dongsha.

Matters needing attention in decoration

1 ? Early design?

? Mainly according to their own living habits, and detailed measurement of their own rooms, we should not be lazy, it is best to personally measure it again, the measurement content mainly includes: clear the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area; ? Determine the main wall size. In particular, it is necessary to design the wall size of furniture in the future. ?

2? Demolition and transformation of main body

? When entering the construction stage, the main body removal is the first project, which mainly includes wall removal, wall building, wall skin removal, heating removal, plastic steel window replacement and so on. To put it bluntly, the main body demolition is to set up the framework of the construction site first.

3? Hydropower transformation

? Before the water circuit reform, the main structure should be basically completed. Some students may know that the cabinet should be measured for the first time between hydropower transformation and main body demolition. In fact, the so-called first measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. It mainly includes: whether the position of the lampblack machine socket affects the installation of the lampblack machine in the future. See if the water meter is in the right position. See if the location of the water inlet is convenient for installing the sink in the future. For the first measurement of cabinets, students with a little experience can do it by themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately. The kitchen generally doesn't need to be waterproof.

? 4? Woodworking craft

? Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty will go first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement, which I will mention later. In fact, carpentry, such as vertical pipe, decorative ceiling and plastering lines, can also be considered as the fine links of the main body demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs certain cooperation. ?

5? Tiles?

? In the process of "bricklayer's second child" operation, it also involves the installation of the following three links: the installation of threshold stones and the installation of marble windowsills. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue. Install the floor drain. Floor drain is the first hardware in home improvement, because it should be installed with floor tiles. Therefore, students should buy floor drains as soon as possible when they start buying building materials. Install the range hood. Range hood is the earliest household appliance. After the kitchen walls and tiles are laid, you can consider installing a range hood. ?

Step 6 paint the walls

? Mainly finish the basic treatment of the wall, paint the top coat and paint the furniture played by the "carpenter boss". Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my decoration experience, it is not meaningful to leave the top coat, because the operation behind is no dirtier than the paint. ?

7 kitchen & bathroom hung ceiling

? As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best for students to install ceiling lamps and exhaust fans (Yuba) in the kitchen and bathroom at the same time, otherwise thread ends and holes will be left.

8? Cabinet installation

? After the ceiling is completed, you can make an appointment to install cabinets at home. If it goes well, it can be finished in one day. At the same time, there is also a sink (excluding water fittings) and a gas stove. Before the cabinet is installed, it is best to coordinate the property to turn on the gas, because the gas stove needs to be tested after installation.

? 9? Wooden door installation

? The second day after the cabinet was installed, as early as more than a month ago, after the wooden door measurement was completed, it can be installed now. If all goes well, it will be a day. At the same time, hinges, door locks and floor traps should be installed. Students should prepare related hardware in advance. Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, wooden door manufacturers should go to the door to measure the size of the door opening as soon as possible after the main body is removed and transformed.

10? Floor installation

? The floor can be installed the day after the wooden door is installed. If all goes well, it will take a day. Pay attention to the following problems when installing the floor: 1. Before installing the floor, it is best to ask the manufacturer to investigate whether the floor needs leveling or partial leveling. Some decoration companies or teams will advise students to level the ground or partially level it, depending on the actual survey of the floor manufacturer; 2. Before the floor is installed, the floor of the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process. 3. When installing the floor, if possible, the floor must be cut in the corridor. This issue has been discussed before in the forum. Some students think that cutting the floor in the corridor will pollute public areas, which is immoral. My idea is to clean it after completion. It doesn't matter. Cutting the floor indoors has serious pollution to the walls, and cutting the artificial stone countertops of cabinets. I believe all the decorated students have some experience.

1 1? Paving wallpaper

? The day after the floor was installed, the house was cleaned and you can make an appointment to paste wallpaper. If all goes well, it will take the same day. If possible, the floor should be protected on the day when wallpaper is laid; It doesn't matter if there are no conditions, and it's no problem to leave the wallpaper glue left on the floor to Pioneer for cleaning. Before the wallpaper is laid, try to "nothing" on the wall. ?

? 12? Switch socket installation

? Students should know or record in detail the number and location of switch sockets in various natural rooms at home, especially those who paste wallpaper. Sometimes the wallpaper pasting workers are irresponsible, and the wallpaper is laid at once, and you don't need a wallpaper knife to mark the position of your switch socket. Therefore, students still need to know for themselves.

13? lighting equipment

? 14? Hardware sanitary ware installation

? 15? Installation of curtain rod

16? Xianfeng clean

17? Furniture method

18? Electrical installation

19? Home accessories

Congratulations on the completion of the renovation!