Traditional Culture Encyclopedia - Almanac inquiry - What is the meaning of in-situ tamping in construction engineering, and under what circumstances can this subtitle be applied?
What is the meaning of in-situ tamping in construction engineering, and under what circumstances can this subtitle be applied?
"Original soil rammer" refers to the tamping of soil surface (such as the bottom of dug trench) in natural state. Work content: loosening soil, leveling, watering and tamping. Compaction of original soil is calculated in square meters according to the compacted area. It is a working procedure and a unique subtitle existing in manual excavation, and there is no need to calculate the actual volume of soil separately.
For comparison:
"Backfilling and tamping" refers to earth moving, backfilling, leveling and tamping. There are many items in the budget. There are core backfill, outdoor backfill, backfill outside the leveling site and so on. Compaction is calculated in cubic meters according to the compacted area.
Attached drawing: diagram of quota subtitle and quota set.
Honey, is that clear? I don't know. You can ask again.
- Previous article:Gregorian calendar1May 984
- Next article:Is February 13, 2022 an auspicious day for business opening? What time does it open?
- Related articles
- What's Yang Wenhao's name?
- Ten feng shui taboos for sleeping in the bedroom
- Current price of Huangli rice in Jilin Province
- Zodiac in Gregorian calendar
- Is the ink calendar easy to use? How does it compare with other similar software?
- What is the lucky number of people born on June 6th? 1977?
- Is it a lunar calendar or a solar calendar? The lunar calendar is a combination of yin and yang.
- Huang Li computer edition
- What are the zodiac signs?
- Xiayi Gregorian calendar