Traditional Culture Encyclopedia - Almanac inquiry - Is it necessary to look at the date before disassembling the scrapped boiler?

Is it necessary to look at the date before disassembling the scrapped boiler?

This usually depends on the date, because this has some taboos.

Precautions for dismantling the boiler are as follows:

1, the whole demolition work must be supervised and guided by professional safety personnel and professional technicians, and unified command is required, and it is not allowed to be blindly reckless.

2, must be involved in the demolition of personnel safety technical disclosure and safety training, coordinate with each other.

3. Safety warning lines and warning signs should be erected at the demolition site to guide passing pedestrians and vehicles.

4. When removing the roof panel, fasten the safety rope first, and the operator shall fasten the safety belt and hang it on the safety rope.