Are you still confused about the renovation process?
Update process strategy
① Preparation for commencement
Decoration preparation (1-3 weeks): Before preparing for decoration, it is necessary to make clear the decoration demand and budget, so as to give a perfect design plan, such as whether it is necessary to have a second child, a third child and so on in the future planning. When these have a preliminary idea, we can think about whether the decoration method is all-inclusive, half-inclusive or open-package.
All-inclusive: design, hard installation of main materials, auxiliary materials and construction are all handed over to the decoration company, which saves time and effort and is suitable for Xiaobai, but there are not many design highlights. When you meet an informal decoration company, it is easy to meet the situation of shoddy and Jerry-building.
Half-package: Leave the design, hard fittings and construction to the decoration company, and the main materials can be purchased by themselves, which is more secure in terms of safety, environmental protection, cost and quality, but it takes time and energy to select. When signing the contract, you must make it clear to the decoration company that those materials were purchased by yourself.
Cleaning bag: the decoration company or construction team is only responsible for the construction, and the owner completes the design and materials himself, which is more suitable for owners who have plenty of time, understand the decoration process and construction, and have strong initiative. When the above is ready, you can make a budget table according to the demand, so that you can make a choice according to the budget after the official start of construction.
Decoration design (1-2 months): Design is planning. Our home should be not only beautiful, but also practical. Designers are generally divided into two categories, independent designers or designers of decoration companies. The former has high cost, but the design drawings are comprehensive, and it can track the whole decoration process and assist in purchasing decoration materials and accessories. The design fee of the latter is usually included in the quotation, and there are also low-price traps under the guise of "free design"
Decoration and house measurement: When designers and builders complete their choices, they need to actually measure the house. At this time, they can provide design drawings or conceptual schemes, give quotations, and finally sign contracts. The design drawings to be confirmed here should include the original structure drawing, demolition drawing, new building drawing, floor plan, ceiling plan, floor plan, hydropower point map, elevation drawing, etc. After these confirmations, the construction quotation will not easily produce additional or reduced items, thus making a better budget.
Construction quotation: decoration materials, technology, unit, quantity, labor and other items need to be clearly stated.
Construction preparation (one week): Everything is ready, you need to find a property to apply for a decoration permit, turn over the calendar and choose a good day to start construction. If it is a hardcover room, the installed part needs to be protected before construction.
② Decoration construction
Demolition and modification (1-3 days): In short, the structure is demolished and modified according to the design scheme, and the partition wall is rebuilt. Of course, walls that cannot be knocked, such as load-bearing walls, structural beams and counterweight walls, are not allowed to move. At this time, you can contact window merchants, central air conditioners, fresh air systems, heating equipment, and cabinet manufacturers to make a good handover with the construction team and reserve the hydropower level in advance.
Water and electricity (5- 10 days): Water and electricity are very important concealed works. You can often come to the site after you start to do water and electricity, and you can find out what needs to be adjusted or done wrong in time. When the water and electricity are completed, it must be checked and accepted, and photos should be taken for the bottom. At this stage, you can connect the door of the room with the merchant of the wardrobe and measure it at home to determine the model and color of the tiles.
Woodworking (about 10 day): Woodworking mainly includes ceiling, wooden cabinet, modeling wall, plastering line, riser, etc. , which will collaborate with other processes. For example, it is also common to stick bricks earlier than the ceiling, but the ground must be protected after sticking.
Mud tile (about 10 day): the work of mud tile includes wall laying, wall leveling, brick laying, jointing and waterproofing, so the work of mud tile runs through the early stage of construction, which requires high skills and experience of the master. At this stage, you can look at the soft clothes such as furniture, home appliances, curtains and carpets in advance.
Paint (10 day or so): mainly the decoration of walls and floors, not only the painting and wallpaper paving in wall covering, but also the basic treatment of the top surface of walls, batch of putty and so on. At this point, the whole home has been presented, and the installation stage is about to begin.
Installation (about 10 day): mainly reserved are integrated ceiling installation, floors, doors and windows, cabinets, lamps, sanitary wares, curtain racks, clothes hangers, water heaters, range hoods, switch sockets, etc. Some embedded microwave ovens, ovens, water purifiers, dishwashers and other equipment can also enter the market at this time.
Closing (1-3 months): Land reclamation, cleaning, goods sorting and painting are all carried out at this time. After everything is ready, you can enter the sofa, bed, coffee table, dining chair, TV, hanging or vertical air conditioner, curtains and other soft clothes. The finishing process is relatively long. After the hard suit is over, the soft suit is not in a hurry to enter the market. You can open the window to ventilate and disperse the smell.
Are you clear about these procedures?
- Previous article:How to check the game record of boyfriend eating chicken?
- Next article:More authoritative yellow calendar
- Related articles
- What are the specific steps to choose a date for marriage? How do individuals view the Gregorian calendar?
- What's the date today? Is the lunar calendar 1 1 month 13 suitable for construction?
- What is the date of slight cold in 2020?
- Gregorian calendar auspicious day March 2 1
- In the wedding: cut Geely, dress Geely, hire Geely, and use colored seals. How to explain it?
- On the 28th day of the first month of 2023, where was XiShen? Day 28, XiShen bearing?
- Look at the zodiac to tell fortune.
- A famous figure in the yellow history
- 199965438+ 10/0/6 Gregorian calendar
- 202 17 19 named after the yellow calendar.