Is there a departure notice for the architectural survey company?
1. After the issuance of the Construction Project Planning Permit, the construction unit shall submit the setting-out application, the Construction Land Planning Permit and its annexes, the construction project planning permit and its annexes, the approved construction project general plan, coordinate map and other technical data, and the original construction drawing approved for construction (stamped with the planning audit chapter) and other related materials to the planning sub-bureau.
Note: The electronic documents (drawings in DWG format) of the above application materials shall be submitted at the same time, and the submitted copy materials shall be checked with the original, and stamped with the official seal of the construction unit.
2. review. After being approved by the planning sub-bureau, the planning sub-bureau will issue the Notice on Positioning and Setting-out of Construction Projects.
3. Nailing piles and setting out. Surveying and mapping units entrusted by the Municipal Urban and Rural Planning and Construction Bureau with corresponding surveying and mapping qualification grades shall carry out construction lofting according to the attached drawings of the construction project planning permit.
Second, the planning inspection line
1. Planning preliminary inspection. (3-5 working days)
The construction unit shall submit the application for line inspection and the survey report issued by the surveying and mapping unit to the planning sub-bureau after setting out the construction according to the attached drawings of the construction project planning permit. The main contents of the initial inspection of the construction project include the land boundary, the building location, the distance between the red line of the building concession road and the land boundary, the building spacing, the axis size of the external wall of each building, and the setting of public signs for the planning of the construction project.
The main contents of the preliminary inspection of municipal pipeline engineering include the plane coordinates, pipe diameter or section size of the pipeline.
The main contents of the preliminary inspection of municipal road engineering: the coordinates of road center line and sideline, bridge plane, etc.
The planning sub-bureau shall go to the construction project site for preliminary inspection, and issue the Notice of Acceptance of Construction Project Start-up Inspection Line after passing the inspection. After the construction unit has obtained the Notice of Acceptance of Line Inspection of Construction Project, it can carry out excavation construction according to the gray line that has passed the preliminary inspection.
2. Re-inspection of project planning (5-7 working days)
When the construction project reaches the 0.00 foundation, the construction unit shall apply to the Planning Branch for re-inspection of the 0.00 foundation. The re-inspection includes the following main contents: all the contents of the initial inspection, the concession distance of underground space, the area of underground space, the entrance and exit position of underground space, etc.
Before the municipal pipeline project is covered with soil, the construction unit shall apply to the planning department for re-inspection. The reinspection includes the following main contents: all the contents of the initial inspection, pipe diameter, pipe bottom elevation, pipe top elevation, soil covering depth and the minimum distance from relevant pipelines.
Before the pavement construction of municipal road engineering, the construction unit shall apply to the planning branch for re-inspection. The reinspection includes the following main contents: all the contents of the initial inspection, the form and elevation of road section, etc.
Planning sub-bureau to the construction project site for re-inspection, and if the re-inspection of the construction project is qualified, the planning sub-bureau shall issue the Notice of Re-inspection of the Construction Project before the construction unit can enter the next stage of construction; If the reinspection is unqualified, the construction unit can enter the next stage of construction only after the rectification planning permission authority considers that it meets the requirements.
- Previous article:Dreaming of the omen of fire falling from the sky
- Next article:Is Jin Ailin's husband Xiaohu a doctor?
- Related articles
- How to deal with the conflict between the date and the zodiac, and how to deal with the conflict between the zodiac and the zodiac when moving?
- Shall we start decorating in rainy days? What are the signs of rain? Can the commencement ceremony of renovation be held in rainy days?
- What's the difference between the vernal equinox and the Spring Club? What are the taboos?
- Is 2022 a dry or rainy year?
- What is the best day to live in a new house in 2022, 1 month?
- Cancel the fortune-telling almanac
- issuing date
- What are the reasons why children talk big?
- When were you born?
- My husband did a sperm analysis, and the doctor said that sperm liquefaction was not good.