How many days is the validity of the ground-breaking work permit?
When building a villa, according to the selected date, the first time to hoe the soil in Kyrgyzstan with a hoe is called "breaking the ground". Ji's choice is to break the ground according to the geomantic omen of Bawu, and choose to extend the position as the first hoe. If the building is to be built after the ground is broken, a "thank you meeting" will be held after the completion. If you want to build a haunted house after breaking ground, please ask for the corpse salt to be scattered around the cemetery when you finish. Architecture refers to the construction and repair of houses, that is, decoration. Breaking ground: during construction, hoes were first used for digging. Therefore, when you look at the auspicious day decorated by the Gregorian calendar, you only need to look at what has been repaired.
Which departments need to be approved for ground breaking:
1. Ground-breaking operation refers to excavation, piling and ground anchor penetration depth exceeding 0.5m; The ground stacking load is above 50kg/_; Use bulldozers, road rollers and other construction machinery to fill or level the site.
2. Before the ground-breaking operation, the project leader shall conduct safety education for the construction personnel; The person in charge of construction shall make on-site disclosure of safety measures and supervise their implementation.
3. Ground-breaking construction site shall be provided with guardrails, cover plates and warning signs as required, and red light warning shall be hung at night; After the construction, backfill soil and restore ground facilities in time.
4. Ground-breaking operations must be carried out in accordance with the contents of the ground-breaking safety operation certificate. If the examination and approval procedures are incomplete and the safety measures are not implemented, the construction personnel have the right to refuse the operation.
5. If the contents of ground breaking operations are changed, the scope of operations is expanded or the operation site is transferred, a new license is required.
6. If cables, pipelines and unrecognizable items are exposed during the ground-breaking operation, the operation should be stopped immediately and protected, and the ground-breaking operation can be continued only after being reported to the ground-breaking examination and approval unit for handling and taking measures.
Legal basis:
On-site fire work approval system
Article 1 Smoking is strictly prohibited on the construction site, and operations with fire must be approved.
Article 2 If hot work is needed in the production and life on site, it shall be approved by the competent fire leader, otherwise no one may use open fire without authorization. Keep away from flammable materials when using naked flame, and have fire extinguishing equipment.
Article 3 The personnel engaged in electric welding and gas welding on site shall hold relevant certificates and go through the formalities of using fire before they can operate. They shall not leave their posts without leave, and have guardians and sufficient fire-fighting equipment.
- Previous article:Gregorian calendar 300 years
- Next article:Wechat weekend greetings
- Related articles
- Eight-character almanac app Taiwan Province Province
- What is the custom of Koreans?
- Wannian yellow pear melon
- On the same day, the Gregorian calendar asks about daily taboos.
- Contemporary Young Inspirational Figures Material High School Students
- 19922 lunar calendar
- How to set up an electronic calendar?
- How about getting married on June 23, 20 19?
- Gregorian calendar query 65438+ February 0976
- What does it mean to drive the dragon (Chen Bing) to the north?