Traditional Culture Encyclopedia - Almanac inquiry - Want to know about Pingdingshan Pingmei Group in Henan Province
Want to know about Pingdingshan Pingmei Group in Henan Province
With the start of construction of No.2 Mine in September, 1955 as the symbol, Pingdingshan Mining Area entered a period of comprehensive development and construction. By the end of 1958, construction had started 1 1 on the mine. By the end of 1960, the raw coal output of Pingdingshan Mining Bureau exceeded 5 million tons, which played a very important role in alleviating the shortage of coal supply in China. 1975 achieved "double ten million", that is, the annual output exceeded100000 tons, the profit exceeded100000 yuan, and it entered the national overall situation of ten million tons. 1996 coal output exceeded 20 million tons, making it a very large coal enterprise with important influence in China.
In 2003, the output of raw coal reached 26.69 million tons. At present, there are 0/4 production mines/kloc-; There are three coal preparation plants, and the output of clean coal reaches 5 million tons per year. Total assets are 65.438+0.65438+0.47 billion yuan, annual sales income is 7.6 billion yuan, and employees are 65.438+0.27 million. It has successively won honors such as the national contract-abiding and trustworthy enterprise, the quality trustworthy unit of the coal industry, and the national "May 1" labor award. Ranked 222nd among the top 500 Chinese enterprises in 2003. The enterprise has set up a national technical center, a national mine rescue center and a national A-level labor safety and health evaluation and consultation center.
Pingmei Group adopts the development strategy of "focusing on coal and diversified development" and takes the road of new industrialization, and will build a super-large energy enterprise with prominent main coal industry, strong core competitiveness, strong sustainable development ability and coal-electricity integration, become an important thermal power base, coal chemical base and metallurgical coal base in China, and step into the ranks of the top 100 enterprises in China.
The three-step development strategic objectives put forward by Pingdingshan Coal Group are as follows: the first step is to achieve 30 million tons of raw coal, 6 million tons of clean coal and 9 billion yuan of sales income by 2005; The second step is to produce more than 50 million tons of raw coal, 6.5438+0.5 million tons of clean coal and sales income of 65.438+0.5 billion yuan by 2065.438+00. The third step is to produce 654.38 billion tons of raw coal by 2020.
Pingdingshan Coal Group has a vast development space and great potential. Through the signed cooperation agreement, the coalfield covers an area of 3,000 square kilometers and the coal reserves are 65.438+0.5 billion tons, which provides sufficient strategic resources for the rapid development of enterprises. There are many kinds of coal, such as coking coal, electric coal, lean coal and anthracite, especially the scarce coking coal in China, which is an important coking coal base in China. With superior economic and geographical location, it is one of the 13 large-scale coal bases planned and constructed by the state and one of the top ten coal transportation channels proposed by the Ministry of Railways.
Now it is renamed as Zhong Ping Nenghua Group.
- Previous article:Old almanac query 1972
- Next article:When is Laba Festival in 24 years?
- Related articles
- Textual research on auspicious days in Lao Huang Li
- What's the point of moving into a new kitchen?
- A circle of friends who express everything that goes wrong.
- Brief introduction of child detention
- Gregorian calendar auspicious day inquiry
- 2065438+2008 Lunar February 21st is good, is it suitable for sacrifice?
- What year is the lunar calendar in 2023?
- What's the difference between a sheep farmer who doesn't listen to his neighbor's advice and a sheep farmer who listens to his neighbor's advice?
- Born on1995165438+10/4. What is a birthday?
- Festivals in September