Traditional Culture Encyclopedia - Lucky day inquiry - Matters needing attention and steps of blank room acceptance
Matters needing attention and steps of blank room acceptance
Matters needing attention in embryo room inspection-What is an embryo room?
The embryo room is also called "newly renovated room". Most houses only have door frames but no doors, and the walls are only made of foundation without surface treatment.
Matters needing attention in the inspection of embryo room-what is the inspection process of embryo room?
Check the missing process 1: read three books and one certificate.
Blank book reference: building engineering quality certificate, residential user manual, residential quality guarantee; Two certificates: certificate of completion and acceptance of real estate development and construction projects; The form refers to the "Construction Completion Acceptance Record Form", and the areas in the procurement contract are compared according to the data of the regional measurement report (sealed by the investigation team).
Vacancy Check Process 2: Payment Signature Priority Room
You should check the house in advance, at the same time, get evidence and lay a solid foundation, and keep your own house inspection report. Usually verify the total area of the house.
House inspection process 3: Is the house in good condition?
When signing the owners' meeting and the preliminary property management contract, we should be optimistic about the terms and don't give up our rights.
Vacancy inspection process 4: Is the cost reasonable?
Check whether the fee includes property management fee, decoration deposit and garbage removal freight.
Precautions for embryo room inspection-Precautions for embryo room acceptance
1 First, check the flatness of the wall, see the water surface, and see if there are cracks.
2. Check whether the doors and windows on the balcony of the house are cracked.
3. The water and electricity in the embryo room are unobstructed.
4. Accept whether the embryo shell is broken or empty.
5. The acceptance of the hair salon is unimpeded.
6, acceptance of the total floor height, water meter quantity, records, shower room size, etc.
Matters needing attention in embryo room acceptance-experience in embryo room acceptance
First, prepare rough room decoration tools.
Prepare tape measure, calculator and big board clamp before decoration;
Second, check
Check the waterproofing of the embryo house and observe whether there is water seepage in the corner of the house. This is very important. If you have any questions, you should find the property in time.
Third, choose an auspicious day to start work
Choose a good starter before decoration, and then it is best to measure the original corner before construction and make records. Determine the area, tile area, painting area and calculate the wallpaper. If you have custom-made furniture, you should also calculate the height and width.
Fourth, remove the main body to make the space more practical.
The main decoration is an important decoration, mainly including building walls, building walls, shoveling wall skins, removing heating and so on. The demolished garbage should be cleaned up in time to ensure the cleanliness of the room and facilitate future construction. In addition, completed doors can be set, preferably through cabinets, range hoods, cookers and water heaters, and can be determined.
Five, package hanging plate, tile.
The bathroom is a very humid place. The riser shall not be made of wooden keel. Even if the wooden keel is painted. It is best to use light steel keel or red brick. Light steel keel saves, but the most sturdy and easy to use is red brick.
Sixth, make up
Some defective places need to be reinstalled.
Seven, pay attention to the transformation of water and electricity, and arrange the use of each space.
The installation position of water and electricity must be determined. You need to see the owner on the spot and then accept the inspection in person, otherwise it will be very troublesome. Before carrying out hydropower, it is necessary to measure and determine the power supply scheme of the waterway.
These are some things that Bian Xiao has compiled for you today about the matters needing attention in embryo room examination. Closing the house is a very important step, and everyone must not be carried away by joy when closing the house. I hope the above content can bring some help to friends in need. Thank you for reading.
- Related articles
- Gregorian calendar 20 15 Both of them are horses. When is the best date for their wedding?
- How about getting married on July 26, 20 18?
201Thursday, July 26th, 8 201June 8th14th, Lunar New Year, Niuchong West. The west god is northeast, the god of wealth is due north, and the god of w
- What is a good gift for the company to move, and what is a good gift for the client company to move?
- April 12 is it ok to worship Guanyin in Nanhai?
- March 2022 is a good day to move _ March 2022 is a good day to move.
- 65438+February, 2023, a good day to move.
- I dreamed that I found a bunk bed.
- Who can give me the details of this flower? Function: product introduction: cultivation points, etc. The more the better! ! And the price. . .
- What are the customs and habits of Dulong people in China and their origins?
- Hate Sagittarius