Work summary of vice president of engineering 20 17

The year is approaching, and it's time to sum up all the projects. The following is for everyone to sort out: 20 17 summary of the work of vice president of engineering, for reference only, welcome to read! I hope it helps you. Please stay tuned for more details.

20 17 Work Summary of Vice President of Engineering-Dear Chairman and colleagues in the hotel, good evening. 20 17 is coming to an end, and we will usher in the new year of 20 18. I am the vice president of the hotel, in charge of the engineering department and marketing department of the hotel. Let me summarize the work for the whole year of 20 17 as follows:

1, hotel room renovation

In the first half of the year, the engineering department cooperated with the external decoration team to completely renovate the rooms on floors 5 to 10 of the hotel, replacing wallpaper, floor, bedstead, bedside lamp and installing doorbell. In cooperation with the telecommunications department, the original broadband network cable was rectified, and five switches were provided by telecommunications, which improved the internet access speed and reduced the failure.

2. A new laundry room was built.

Because washing linen outside the hotel can't guarantee the washing quality, the hotel decided to build a new laundry room with an area of 100 square meter in the basement. The engineering department cooperates with manufacturers to install washing equipment and water and electricity supporting projects, and assigns special personnel to inspect and maintain laundry equipment every day. At present, the laundry room is running well and the washing effect is very satisfactory.

3, facilities and equipment maintenance and maintenance

The hotel's main equipment includes: air conditioning equipment, water pump motor, generator set, elevator room, washing machine room, power distribution room, monitoring equipment, wine tube equipment, cable TV and so on. These maintenance work are basically done by the electrician on duty. They have to solve the maintenance work of guest rooms every day and carry out daily maintenance of these equipment. The electrician on duty does not rest in three shifts, and everyone has to follow the class for more than 40 hours every month. In case the equipment breaks down, they have to work overtime to repair it.

There were six electricians on duty at the beginning of the business, but now there are only three. Nevertheless, they are still diligent and responsible in their work. I am very grateful for their support, and I hope they can continue to maintain this spirit of struggle. In view of the situation that there were many equipment failures in the elevator machine room in previous years, this year, the engineering department added refrigeration air conditioning and bridge box air conditioning in the machine room, which significantly reduced the elevator failure rate.

4, energy saving and consumption reduction

The biggest expenditure of hotel operating cost is energy consumption, and the operating cost of air conditioning alone is close to 654.38+0 million a year. In 2006-2007, the expenses were 6.5438+0.49 million yuan/year, 900,000 yuan/year in 2008-09 and 788,000 yuan/year in 2065.438+07. Saving energy and reducing consumption plays a vital role in the development of enterprises. At present, the prices of energy products are rising rapidly. Last year, the price of standard anthracite was 1 100 yuan/ton, but this year's coal price is 1300 yuan/ton, and our hotel will consume more than 200 tons a year. In view of this situation, the engineering department has formulated relevant energy-saving schemes. In winter, the heating pipes of boilers are easy to block ash, so it is necessary to clean the boiler pipes and flue every week to maximize the boiler energy efficiency, and adjust the air conditioning temperature reasonably according to different temperatures to ensure the air conditioning effect.

Use peak-valley electricity price to reasonably arrange laundry and drying time to reduce electricity consumption, and add floating ball valves to the basement pool to prevent water leakage. At the same time, we should also do a good job in air conditioning pipeline insulation and try to use energy-saving products.

5, safe work

In this year's work, the engineering department attaches great importance to safety in production. Usually, the hotel's facilities and equipment are maintained in a planned and step-by-step manner in strict accordance with the operating rules, so as to prevent barbaric operation, avoid the occurrence of major equipment safety accidents in the 20 17 hotel and ensure the normal operation of the hotel.

6. Marketing work

Follow up the team check-in and meeting follow-up, keep abreast of the opinions and suggestions put forward by the sales market and guests on the hotel, and solve and improve them. Summarize weekly marketing work and plan next week's work. We added short message service and holiday wishes to the agreed customers, visited and telephoned the customers, and developed new customers.

20 17 summary of the work of the vice president of engineering is coming, and the new year is coming. Standing at the end of the year and beginning of the year, looking back on the work of this year, I feel a lot. I report the work summary of 20 17 to the company leaders and colleagues.

I. Review of Work in 20 17 Years

(1) Main work contents:

1. Coordinate the work contact of various functional departments of the company in construction management, such as the related work between design, bidding, business, scheme, materials, property and administration departments;

2. Organize and coordinate the contractor's construction tasks and management processes, such as the contractor's management process, work content and technical disclosure;

3. Coordinate the construction management relationship between disciplines, such as organizing and coordinating professional construction process disclosure, site working face handover, technical disclosure, etc.

4. Assist in solving the mediation work of industry requirements and interference with engineering construction, such as contacting the government industry authorities, dealing with villagers' interference with engineering construction, and dealing with construction personnel's troubles.

5. Implement the work responsibilities and working relationships of professional engineers in the engineering department and supervision unit, such as: defining the work content of each department, defining the work responsibilities of professional engineers, organizing the task and process disclosure of professional engineers, establishing the working relationship between professional engineers, and coordinating the construction relationship between professional engineers.

6. Be responsible for arranging and implementing all municipal and house construction electromechanical projects, such as electromechanical installation of contractors such as water supply and drainage, electricity, heating and ventilation, gas, etc.

7. Be responsible for arranging and implementing all civil and hydropower projects in the villa area, such as masonry, waterproofing, water and electricity, doors and windows, etc.

8. Responsible for the arrangement and implementation of fine decoration of model houses and public houses, such as the early decoration of high-rise model houses, villa model houses, sales departments, corporate clubs and golf clubs;

9. Assist in the implementation of various construction links of municipal roads and water systems, greening, fences and other projects, such as water and electricity consumption, site and related water and electricity construction;

10, to assist the daily maintenance and rectification of buildings in use;

1 1, responsible for the use and charge management of hydropower;

12. Participate in making progress plan, quality control, safety management, technical scheme review, bidding cooperation, contract review, project payment review, etc.

(II) Summary of the above work.

Over the past year, in terms of project schedule, quality, cost control, coordination and cooperation, Jiji has responded to the instructions of the company's leaders, earnestly implemented all the work, and devoted itself to the work, but at the same time changed the conventional management mode, greatly improved the emergency work ability, and accumulated some experience in dealing with construction measures.

Second, experience

(a) Impact of design and construction on the project

Tianlong 3,000 Sea Project has high positioning and quick start, aiming at building the best real estate at home and abroad and seizing the market. In this case, the 3000-sea project entered the construction stage too hastily, and every item of the actual construction industry's planning stage, preliminary design stage, design stage, construction stage and completion acceptance stage is very important, especially the engineering design is the most important engineering document to guide the project implementation. However, the 3000-sea project started hastily under the condition that the design review was not rigorous enough, and the phenomenon of designing and constructing at the same time also resulted. For example, from the early piling to the later design drawings of curtain wall, hydropower, water system, gardens, decoration, etc., many projects have been deepened again and again, and even many of them are carried out according to the imaginary on-site disclosure, so the important guiding role of engineering drawings has lost a great role, and many projects have happened sporadically. As a result, design and construction are often out of line, many construction tasks are carried out in a hurry, and there are also many mistakes, which have a great impact on the whole project and also cause great difficulty to construction management.

(B) the impact of insufficient budget forms on construction management (quota labor)

(3) Planning objectives

(4) Materials

Three. Constructive opinions

(1) Establishment of management framework system

(2) Management personnel configuration, tasks and responsibilities

(3) Enterprise Management Measures (Manual)

(4) Management of supervision unit

(5) Management of the construction unit

I recommend it carefully.