Traditional Culture Encyclopedia - Lucky day inquiry - Hangjinqi 12th Five-Year Power Planning

Hangjinqi 12th Five-Year Power Planning

During the Twelfth Five-Year Plan period, The power grid plans to complete the power transmission and transformation project from Xiangsha 500 kV to Guosanliang Industrial Park, Daqi Xiangsha 500 kV to Guosanliang 500 kV, Guosanliang 220 kV capacity expansion project, Jin Hang capacity expansion and Buridu-Jinhang Second Circuit 220 kV power transmission and transformation project, Kubuqi capacity expansion project, Buridu 500 kV to Sini 500 kV power transmission line project to Guosanliang Park. Kloc-0/0kv power transmission and transformation project, Sini 1 10kv power transmission and transformation project (relocation and new construction), Shengli10 kV power transmission and transformation project and barragon Industrial Park 168.

Jin Hang 220kV to Aolengbula 1 10 kV power transmission and transformation project, Kubuqi 220kV to Huhe Mudu 10 kV, Guo Sanliang 220kV to Daotu 10 kV, Guo Sanliang Industrial Park 220kV to Dugui New Town/KLOC-0.

Modification of reactive power devices in unattended substations (7 substations) in rural power grid (7 substations, namely lakeside, Ba Chuangye District, Ji, alkali cabinet, ancient substation, Baiyinqinggeli substation and one substation); Replace 7 main transformers/106300kva (capacity increase: Baiyin Qinggeli Substation, Hohhot Substation, Bazhong Chuangye Substation, Kyrgyzstan Substation, Bian Tao Substation, Industrial Substation and One Substation); The image and video security monitoring system (with five remote functions) includes 7 substations in Jilin, Hohhot, Iraq, Taohua, Gongbian, Baibian and Aban, 35KV power transmission and transformation project of T-line of Duji Line connecting Qixing Lake, 35kV power transmission and transformation project of changing Jin Hang 220kV to Amun Banner, and 35kV power transmission and transformation project of wind farm connecting Iraq and Wusibayinmeng.

Rural power grid 10 kV and below projects plan to build and transform 10 kV lines of 399 kilometers; New construction and renovation of 0.4 kV low-voltage 579 kilometers; Add and transform 9 12 distribution transformer and 27213 kva; Reactive power compensation 40620kV (10kV and 0.4kV); 207 intelligent vacuum switch (branch); Newly built optical fiber downlink channel of 477 kilometers; 168 sets of energy saving and loss reduction projects. Hangjinqi will be built into a pilot county of "20 10-20 12" rural power grid upgrading in the autonomous region.