Manage the process! Easily repair decoration

Trouble with decoration? Many people are at a loss before decoration, because they know nothing about decoration. I don't know which step to start with, bricklaying or painting first. Today, Bian Xiao will tell you the process of decoration, so that you can get the basic order of home improvement in ten minutes!

First, start work on an auspicious day.

Feng shui is a key point in family decoration. Whether it is construction or new house occupancy, we must choose auspicious days.

Second, the main body of demolition and transformation

In order to make the space more practical, the first step in the renovation of new houses is the main body removal, which mainly includes wall removal, wall building, wall lifting, heating removal, plastic steel window replacement and so on.

Third, hydropower transformation.

Water and electricity decoration is the most important step in decoration. Before decoration, the exact location of switches, lamps, basins, bathtubs, washing machines, etc. We should be sure. At the same time, the cabinet designer should also make corresponding measurements to determine the transformation scheme of power supply and waterway. All water heaters, power supplies, etc. Should be arranged in a good model.

Fourth, guarantee.

Clean up the ugly pipes. Considering the humid environment of kitchen and bathroom, wooden keel must not be used as guarantee material. Light steel keel or red brick is recommended.

Fifth, tile.

Waterproof and galling should be done well before tiling, and the gap between tiles is also very demanding, so the process of tiling can be observed and tested from the joints.

Sixth, paint.

Brushing putty is also a technical activity, and the texture and technique are very particular.

Seventh, wallpaper.

After the wall paint has been painted, the oil trade union will brush nitrocellulose paint where wallpaper needs to be pasted. You can dry the paint thoroughly the next day and then paste the wallpaper.

Eighth, install the socket panel

It's best to buy sockets with switch function, especially in the kitchen, so that rice cookers and microwave ovens can be controlled by switches without plugging and unplugging the power supply.

Ninth, the kitchen and bathroom ceiling

Seal the last ugly part and install the water heater and yuba. After installation, the ceiling can be sealed to better half-wrap the water heater.

Tenth, install cabinets.

The cabinet is a supporting project, which should be installed together with the range hood, cooker and sink.

Eleventh, install the finished door

The finished door should be installed before the floor, mainly because the installation steps of the door are complicated, such as hinge, door lock, door suction, door frame and so on.

Twelfth, install hardware.

It is suggested that clothes hangers, curtain rods, lamps, sanitary wares, toilets, etc. scattered with a large amount of ash should be installed one by one before installing the floor. If the program is reversed, it is likely to damage the floor.

Thirteenth, install the floor.

The floor must be leveled before installation, and workers must be asked not to cut the floor in the house, but in the corridor, so that the corridor can be cleaned at last.

There are many accessories in the later period, such as curtain decoration, which can be slowly matched according to space and design style. Reminder of calf decoration: it is very important to make rational use of the main materials to order and determine the delivery time, which is directly related to the decoration progress.