Traditional Culture Encyclopedia - Lucky day inquiry - What is the process of the first day of renovation?

What is the process of the first day of renovation?

1, choose the right time to start work

The first thing to do when you start decorating is to choose a sunny day. Good weather can help the house decoration go smoothly. At the same time, choosing a good day means choosing a good color.

2. Choose a suitable time point

On the day of construction, choosing the right time for the groundbreaking ceremony indicates the smooth progress of the renovation in the future.

3. Graduation ceremony

Generally, firecrackers should be set off first, and then some ethnic activities such as burning incense and paper can be carried out. This is based on different regions, different folk customs, and some decoration feng shui is exquisite.

Extended data

Decoration construction can be roughly divided into the following stages:

1. Civil construction stage: entering the site, tearing down the wall and building the wall; Trenching, hydropower transformation and acceptance; Buried trunking concealed hydropower renovation project, waterproof project, 24-hour closed water test of toilet and kitchen floor; Toilet and kitchen wall tiles.

2. Foundation treatment stage: carpentry enters the site, suspended ceiling and plastering corner lines; Wrap the door cover and window cover to make a wooden cabinet frame; At the same time, make all kinds of wooden doors, modeling doors and flat pressing doors; Brush the wooden panel with dust-proof paint (clear oil); Leveling and laying marble countertops on the windowsill; Veneer, thread, hardcover; Treatment, grinding and leveling of grassroots walls; Glue the joints of furniture and doors and windows (protective edges).

3. Detail processing stage: brush the wall at least three times; Furniture paint comes into play, fills holes and paints; Treat the corner, lay floor tiles, solid wood or composite wood floors, waterproof marble strips and skirting lines; Installation and debugging of lamps, switches, sockets, sanitary ware, handles and door locks; Cleaning, floor tile joint repair, exit; Internal preliminary acceptance of decoration company; Three parties make an appointment for formal acceptance and deliver it to the owner.