Traditional Culture Encyclopedia - Lucky day inquiry - What are the renovation steps of the new house?

What are the renovation steps of the new house?

Decoration flow chart:

Save the map quickly!

A. Demolition, renovation and construction

In the demolition and renovation stage, the overall structure is completed. First of all, you need to prepare the deposit, ID card and house qualification certificate, and lead the construction personnel to the property for construction procedures.

Tips for saving construction period:

At this stage, you can contact some equipment manufacturers, such as windows, heating, fresh air, central air conditioning, including water and electricity, cabinets and so on. In this way, the manufacturer and the construction team can make a good handover and reserve the water level in advance.

B. Hydropower generation

Hydropower construction:

Come to the scene to see more, record more and take more pictures. Hydropower is a concealed project, and the hydropower made by a good builder must be very neat. If you want to change furniture after a few years, you can know whether it can be nailed under the wall by comparing photos.

Hydropower acceptance:

● Inlet water is divided into outlet water and outlet water. The outlet water depends on whether the cold and hot water are out of the water and whether the water quantity meets the requirements. Go into the water to see if the floor drain is blocked and the toilet is blocked.

● Power-on can test whether the socket panel is powered on and whether all electrical appliances in the home will trip when turned on.

Tips for saving construction period:

At this stage, you can find the manufacturers of wooden doors and wardrobes to measure the size. Buy bricks in advance, leaving enough margin for the next stage of construction.

C. Woodworking skills

What happened on the construction site are: ceiling, modeling wall, platform, woodworking cabinet.

Woodworking involves environmental protection issues that everyone is concerned about. At the scene, look at the materials to see if there is rotten wood and whether the glue used is environmentally friendly; Second, whether the drawings are consistent with the actual situation; Third, shake it to see if there are any security risks.

D. bricklayer

Masonry includes: building walls, leveling the ground, sticking bricks and jointing.

The bricklayer's craft involves aesthetic issues and needs the guidance of the owner and designer. Generally speaking, the first angle of view is to use complete bricks. The whole brick is used to enter the door on the ground, and broken bricks can be used under the cabinet.

There are also popular cultural bricks. You must draw lines in advance to stick them neatly.

In addition, at this stage, you can look at the furniture and soft clothes in advance to prepare for the future.

E. oilman

Oil workers include putty, paint and on-site wall painting. It is suggested that wood wax oil should be brushed on the cabinets on the spot to preserve the texture of wood itself. It is not recommended to paint on site, which is very environmentally unfriendly.

F. Installation of wood products

After the completion of the oilman, the construction came to an end. Some previously customized products can be installed on site, such as wardrobes, doors and cabinets.

● Note:

There must be an estimate when communicating with the manufacturer. In order to win customers, manufacturers will quote lower prices in the range when quoting. You need to know which items the manufacturer will raise the price. If you can accept the follow-up fee, it will not delay the time of both parties.

For example, the manufacturer may say that the toilet is free in the early stage, but the door-to-door fee and installation fee are collected on site, including the promotion of accessories (angle valves, hoses) and so on.