Traditional Culture Encyclopedia - Lucky day inquiry - Owners must see: the best time for fine decoration acceptance?

Owners must see: the best time for fine decoration acceptance?

Although buying a decorated house is not so tiring to find and bargain in the building materials market, disputes caused by the quality problems of decorated houses also occur from time to time. Especially when you choose an auspicious day and move to a new home after repossession, you are faced with a series of decoration quality problems when repossession, and the rework and rectification of the project is far away, and the distress and troubles will follow. Therefore, learning some decoration knowledge and intervening in project acceptance in the construction stage before repossession can prevent problems before they happen.

Decoration acceptance

1, waterway acceptance

The owner can check whether all the reconstructed lines are smooth, reasonable in layout and standardized in operation under the operation of professional water conservancy engineers or electricians, and reconfirm the actual dimensions of the line reconstruction. Only after changing the line can the ash embedder seal the wall and scrape putty.

2, acceptance of woodworking size

After the woodworking foundation is completed, the ceiling and plastering line of the room should also be completed, the wall tiles of the kitchen and bathroom have also been pasted, and the walls that need to be painted should be scraped twice. The acceptance work at this stage is very important. The owner shall carefully check the drawings and confirm the dimensions of each part. If there is any discrepancy, the construction team should be promptly reminded to modify it.

3, woodworking quality acceptance

When the veneer of all wood products is pasted and the wood lines are glued, the owner can carry out the woodworking quality acceptance. This time is basically the middle stage of construction, and the inspection at this stage should focus on the color difference and texture of wood products, as well as the flatness and uniformity of a large area.

Acceptance after completion

After the carpentry is finished, the painter can start the priming treatment. At this stage, all the floor tiles have to be pasted, which is the fifth stage of phased acceptance. The acceptance content at this stage is the most comprehensive and thorough.

According to the construction drawing signed by renovation contract and the owner and the relevant documents of the relevant state departments on the quality inspection of the decoration project, the owner carries out the acceptance mainly from the following aspects:

Power cord: The wiring conforms to the construction specifications and safety standards, the socket is not less than 30cm from the ground, the grounding wire of the third socket, the kitchen and the air conditioning line are laid with special wires, the main brake is equipped with an anti-leakage switch, and the lamps are firmly installed.

Doors and Windows: Open and close freely, and the perimeter of door frame, window frame and glass is well sealed.

Floor: Floor tiles should be flat, clear in texture, even in color, with horizontal and vertical crosshairs. The floor should be laid flat and even, with uniform paint color and no scratches.

Wall surface: the wallpaper is firmly pasted, the seams are tight, the patterns are complete, the patterns are consistent, the side seams are neat without burrs, and the coating is even and flat, without unevenness, color difference and ash falling.

Water supply and drainage facilities: the water supply pipe has no leakage and the on-off valve works well; Smooth drainage, no leakage, water phenomenon.

Paint: the paint surface is smooth, feels good, has sufficient oil, and has no nail holes, scanning marks, burrs and color difference.

The acceptance stage is not absolute in actual construction. Different families have different requirements for decoration content, and the construction progress will naturally be adjusted accordingly. The owner can master flexibly according to the progress of the project.

Special acceptance of "concealed works"

In the process of construction process sequence, the work of the previous process has been completed, and the part that can not be inspected because of the coverage of the next process is called "concealed work". At present, a large part of the quality problems in home decoration are caused by improper construction of "concealed works".

1. Due to the whole or partial collapse of the ceiling, the ceiling has become a "roof collapse". This is mainly because the ceiling and floor, as well as the keel and decorative board are not well combined, or the load is too large. According to the regulations, the ceiling keel shall not be distorted, and the installed keel shall be solid and reliable, and the horizontal deviation around it shall not exceed 5 mm. A chandelier or ceiling fan weighing more than 3 kg cannot be hung on the ceiling keel, and a hook should be set separately. If the ceiling is decorated with gypsum board, its thickness should be about 9 mm

2. The balcony package is not firmly fixed, resulting in collapse. Because there is no "foothold" of packaging materials reserved on the balcony in the current housing design, it is difficult to package the balcony. Therefore, when the balcony is packaged, the doors and windows must be horizontal and vertical, with the same height, and the appearance is free from deformation, welding and fracture. The gap between the frame and the wall should be full and dense.

3. The ceiling is damaged due to pipeline leakage. The pipes in the kitchen and bathroom are prone to problems. Because the plumbing installation is not easy to check, after the completion of all plumbing construction, it must pass the water injection and pressure inspection, and it will be qualified if it does not run, run, drip or leak.

4. You can't bury the thread. Nowadays, many bedrooms are buried with wires, so it is difficult for owners to check the construction quality. According to the regulations, buried lines cannot be directly buried in the plastering layer, but should be set outside the wires. The wires in the sleeve shall not be twisted or jointed. In addition, when installing the line, we must strictly abide by the provisions of "live wire into the switch, zero wire into the lamp holder" and "left zero right fire, grounding above". After the construction is completed, in addition to the power-on inspection, the construction team will also provide the owner with a detailed circuit configuration diagram.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd