Warranty period of foundation and main structure
Construction project quality warranty system refers to the quality defects caused by survey, design, construction, materials and other reasons within the specified warranty period after the completion acceptance procedures. The construction contractor is responsible for maintenance, rework or replacement, and the responsible unit is responsible for compensation for losses. The implementation of quality warranty system in construction projects is an important measure to implement the quality responsibility of construction projects.
Legal basis: Regulations of People's Republic of China (PRC) Municipality on Quality Management of Construction Projects.
Thirty-second construction units should be responsible for the repair of construction projects with quality problems or construction projects that fail to pass the final acceptance. Article 40 Under normal use conditions, the minimum warranty period of a construction project is: (1) the reasonable service life of the project specified in the design documents for the foundation project, the foundation project and the main structure project of the building; (2) 5 years for roofing waterproof works, toilets, rooms and external walls with waterproof and anti-leakage requirements; (3) The heating and cooling system consists of two heating periods and cooling periods; (four) electrical pipelines, water supply and drainage pipelines, equipment installation and decoration works, for 2 years.
Forty-first construction projects in the warranty scope and warranty period of quality problems, the construction unit shall fulfill the warranty obligations, and be responsible for the losses caused. Construction project quality deposit (warranty deposit) refers to the funds agreed by the employer and the contractor in the construction project contract, which are reserved from the payable project funds to ensure the contractor to repair the defects of the construction project during the defect liability period. The warranty period is calculated from the day after completion/handover acceptance.
- Previous article:Do you know the engagement custom in Shanxi? Please answer.
- Next article:B moved to a new house last year and chose a date.
- Related articles
- Both of them are rats, please get married this year! Male: Lunar calendar 1984.05.23 Female: Lunar calendar1984.12.15.
- What should Bodhisattva pay attention to when moving?
- Is the 28th of the twelfth lunar month in 2022 suitable for decoration? What are the auspicious times?
- My best wishes to my colleagues who have moved to their new homes.
The first 1, firecrackers, bells ringing, its auspicious day has arrived; The voice of blessing came at once, and the house was
- What does this Japanese mean?
- Investigation on the auspicious day of engagement in September 2023
In September 2023, the engagement was auspicious.
Gregorian calendar September 2023 1, lunar calendar July 2023 17, Frid
- How to query the name of Songming registered company online? What should I pay attention to when registering a company?
- Design of Music Teaching Plan of "Song of the Shepherd Boy"
- 202 1 is an auspicious day for getting married, and the second half of 202 1 is a suitable day for getting married.
- Gregorian calendar April 29, 2022