Traditional Culture Encyclopedia - Lucky day inquiry - What are the specific process steps of home decoration?

What are the specific process steps of home decoration?

Specific process steps of home decoration:

1, determine the decoration design scheme and construction drawings.

Find a decoration company or designer to design a decoration scheme for your house. Communicate with designers about their functional needs and favorite design styles. Designers will draw various spatial renderings and construction drawings.

▲ renderings

▲ construction drawing

2. Determine the decoration budget.

There are three main decoration budgets in the market: all-inclusive, half-inclusive and package cleaning.

Ask what the budget contains and what you need. Add these two items together, and it is the total price of decoration.

▲ Decoration budget table

3. Apply for building decoration.

Residential decoration should provide relevant drawings to the property management office for construction. The property management office will issue the decoration permit and pay the relevant fees before starting the construction.

4, the construction site protection.

Before construction, the construction team will protect the public passage and entrance door with protective pads to avoid damage during construction.

5. Demolition and wall construction.

Demolition of walls, aluminum alloy doors and windows, etc. According to the determined plan, the decoration garbage will be removed to the designated place in the community or removed by itself.

After the wall is demolished, pay-off the brick wall according to the construction drawing size, and vibrate the wall with cement mortar.

▲ Brick wall

6, determine the cabinets, tiles, wood floors, sanitary ware, doors, wall covering, hard bags and other materials.

After the demolition project starts, it depends on the materials. After the cabinet determines the scheme, the cabinet company should provide the water and electricity diagram; Identify tiles, because they need time to order and process; Determine the technology of wood floor, and reserve different heights on the ground; Determine the reserved size of sanitary ware water and electricity.

▲ Tile exhibition hall

7, water and electricity, waterproof engineering construction.

This project belongs to concealed work and is the most critical part of the whole decoration. It must be accepted before the next process begins.

Including water supply and drainage, potential, lamp position, waterproof and other projects. According to the construction drawings, water and electricity positioning, slotting, wiring pipes, balcony, kitchen waterproof, bathroom sink waterproof.

It is also necessary to report the installation of natural gas pipelines to the gas company, and set up the positions of gas stoves and water heaters in advance at the scene.

▲ Water supply, wiring and pipeline laying

▲ The bathroom sink is waterproof

▲ balcony soaking water inspection

8, woodworking project construction.

Woodworking is the shape of smallpox; The bottom structure of the background wall; Customize cabinets on site.

▲ Ceiling carpentry construction

9, the shop is stuck floor tile, wall brick.

Some friends may ask, why do smallpox first and then lay the floor? The main reason is that smallpox construction is a high-altitude operation, and the tools are heavy. If you accidentally fall, it will damage the floor tiles, so smallpox should be done first.

▲ Floor tile laying

10, on-site investigation of cabinets and doors.

After the tiles are laid, you can re-measure the cabinets, security doors and room doors on site and adjust the drawings for construction.

1 1. Determine the soft furnishings such as furniture, curtains and lamps.

Determine the soft furnishings such as furniture, curtains and lamps in advance. Some soft clothes take time to make.

12, paint engineering construction.

Painters enter the site to scrape putty, brush latex paint, cover the wall with moisture-proof layer and wood paint. On-site production of wardrobes, bookcases and other cabinets should be made of wood coatings. Now it is rarely made on site, and it is customized in the factory because the technology and effect of the factory are better than that of the site. On-site cabinets are firm, and the edging is better than customization.

▲ Paint the ceiling and wall with latex paint.

13, wooden floor, wall covering, hard packing and other engineering construction.

After the painting project is completed, it should be thoroughly cleaned up. The construction surfaces of wooden floors, walls, hard bags and other projects should be kept clean and tidy, otherwise it will be easy to get dirty.

▲ Wood floor installation

14, switches, socket panels, lamps, sanitary wares, doors, cabinets, cabinets, etc. Install in the site.

▲ bathroom cabinet

▲ Bathroom shower

15. Fine cleaning of the whole house.

By this stage, the whole house decoration has been completed, and a comprehensive and meticulous cleaning is needed.

16, furniture, curtains, household appliances, etc.

Furniture, curtains, and household appliances scheduled in advance will be installed in the venue, and other household items can be gradually added.

17, in addition to formaldehyde and other harmful gases.

In addition to formaldehyde must wait until the furniture and curtains are ready, because furniture may also contain formaldehyde.

The natural release of formaldehyde is a long process and needs to be removed by some methods.

After removing formaldehyde, it is best to let it naturally ventilate for one to three months.

18, choose a good time and auspicious day to stay.

The above is the specific process of home improvement, 18 steps.