Traditional Culture Encyclopedia - Lucky day inquiry - Renovation process and matters needing attention of old houses
Renovation process and matters needing attention of old houses
Renovation process and matters needing attention of old houses
Old house renovation process:
(a) tools in place, ready.
Before decorating, remind you to put several things you must prepare in your bag: tape measure (buy 5m, not 3m), calculator, big board clamp (for holding bills and receipts); In addition, it is best to prepare old towels (soft cotton, which are used to wipe bricks after being pasted) and plastic bags (wrapped around the pipe joints) in advance at the construction site to prevent dirt from blocking.
(2) Choose an auspicious day and start shooting before the workers enter the site.
It's best to personally measure the corner of your home, write it down with a pen ruler and mark it clearly. Don't be lazy. The contents of measurement mainly include: defining the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area; Determine the main wall size. Especially it is necessary to design the wall size of furniture in the future.
(3) The main body is removed to make the space more practical.
The main body demolition and reconstruction is the first project, which mainly includes wall demolition, wall building, wall covering, heating demolition, plastic steel window replacement and so on. Remove the garbage in time to ensure the cleanliness of the room, but also for the convenience of construction. At this time, it is time to settle the product door. At this time, it is best to browse the cabinets, range hoods, cookers and water heaters to make sure.
(d) Hydropower transformation, and arrange the use of each space.
Hydropower transformation, no regret medicine to eat. Bricks are stuck on the wall and the ceiling is sealed, so it is difficult to add another socket. So be sure to locate the switches, lights, basins, bathtubs, washing machines and so on. Before the hydropower transformation, the cabinet designer should take measurements at home to help you determine the transformation scheme of power supply and waterway. Water heater, it is also best to send someone to design the position of power supply and interface according to the model you determine.
Note: On the wall below the washbasin, it is best to leave a power socket to facilitate the installation of kitchen treasures. Air conditioning holes and power supply should be placed on the wall of the bedside as far as possible to avoid air conditioning blowing directly at people in the future. Keep a distance of 20 cm between the strong and weak points, such as a distance of 20 cm between the socket and the network cable.
(5) Winding the riser and winding the ugly pipe.
Considering the humid environment of kitchen and bathroom, wooden keel must not be used as the material of riser! Everyone must be careful, even if the wooden keel is painted with antirust paint. Remember, the vertical pipe is made of light steel keel or red brick. Light steel keel saves space, but the most sturdy and easy to use is red brick.
(6) Tile pasting must first have a solid texture.
Buy a floor drain before sticking bricks.
Note: buy a special washing machine or shower floor drain to deodorize. After waterproof napping, we are ready to stick bricks. In addition to the normal precautions for sticking tiles, the tiles are soaked in water and dried in the shade; Leave the broken tiles for cutting, and please make the rest before buying bricks. At this time, it is necessary to determine the basin and faucet, ask the cabinet designer to come to the door for the second time, and at the same time paint (ready mixed paint or clear paint), wall paint, nitrocellulose paint, diluted water, etc. For example, wallpaper should be determined first. (7) There's nothing to say when an oiler goes into battle to paint a wall. The effect of leveling, grinding and rolling depends on the skill of your oiler. Need to remind everyone that if you want to paint the wall, you must pay attention to color matching. The adjusted color is lighter than the color card, and it must not be the same as or darker than the color card, otherwise you will regret it. Because when you paint the wall at least twice, some even three times, the color of the upper wall will get darker and darker. Different people have different views on whether to spray or roll coating. It is said that the spraying effect is better, but once it is damaged, it will be extremely difficult to touch up the paint. If you don't buy a finished door, let the worker master do it.
Renovation process and matters needing attention of old houses
Matters needing attention in renovation of old houses:
First, waterproof.
Compared with new houses, old houses are more prone to waterproof problems, which will endanger neighborhood relations. Therefore, the closed water test must not be taken lightly, and the doors and sewers should be sealed. Fill the toilet floor with water, the water level is about 3-5cm, and it needs to be marked. After 24-hour observation, if there is no obvious decline and no leakage, the waterproof project is qualified.
Second, hydropower transformation.
Because of the long time, the water circuit of the old house has problems, which is understandable. After the aging of the line, it can't bear the demand for domestic electricity and water, so almost all of them will be rebuilt in the renovation of old houses.
Third, the wall
1. Most old houses need to be shoveled. Whether to shovel the plaster layer or the red brick layer, or you need to refer to the opinion of the project manager. The reconstructed wall is easy to crack. After comprehensive evaluation, measures such as wall painting or grid cloth can be taken to prevent it.
2. The renovation of old houses is more prone to problems such as uneven walls or unequal tops, resulting in problems such as furniture or suspended ceilings not being installed normally in the future, or the installation effect is not good. It is suggested that the decoration company should level the wall and top surface first, and then proceed to the next step.
Fourth, the demolition project
1. Because designers and guerrillas don't communicate clearly on design issues, many times houses will suffer, and they will be hit by one hammer in the east and one hammer in the west. After this demolition, the project can't meet the needs of the decoration company, and it has to be reworked, which is not worth the loss. Therefore, the owner should do a good job in the middle bridge, convey the meaning clearly, or ask the two sides to communicate more.
2. Some construction personnel are not standardized, and finished product protection is neglected during construction. For example, before the demolition and renovation, the sewer pipe was not well protected. After the demolition and renovation, it was found that the sewer pipe had been blocked by some garbage, and it was even more difficult to clean it up.
Due to the lack of contract norms, some guerrillas will take the opportunity to wrangle or be lazy and not do their duty. The place that should be treated is not started, and the place that should not be started is convenient to destroy. Finally, it does not meet the requirements of the decoration company, and it is the owner himself who is unlucky.
Five, lighting and pattern defects
Before the renovation, the space will be renovated and designed. At this time, you need to hire a professional designer. To solve structural problems by design, designers will generally give special consideration to the space problem of the house, and first discuss with the owner the decoration style, background wall and other related matters. Professional designers will also take the initiative to understand the composition of the owner's family members and list the matters needing attention in order to bring them into the later design.
About the specific content and matters needing attention of the old house renovation process, I will introduce it to you here. Now everyone understands. You can do it according to the matters needing attention in the renovation of old houses. If you want to know more about the old house renovation process and matters needing attention, please pay more attention to the decoration network together, which will provide you with more complete, detailed and updated information.
National Owner Decoration Exchange Group: 573032 185
The article is reproduced from the official media or other websites, and the copyright belongs to the original author. The purpose of reprinting on this website is to spread the information more widely and give full play to its value. If copyright issues are involved, please contact our website, which will handle them as soon as possible after verification. QQ Group for National Owners Exchange: 573032185; Wechat: wx 17house pays attention to politeness and gets tips on saving money.
- Related articles
- What's the name of the parrot of the Dragon and Tiger family?
- How about the 20 15 thank-you banquet?
- 20 16 moved to auspicious day in February.
- Are females compatible with males? Thank you, everyone.
- When can I move to a new house on the auspicious day of the lunar calendar, 20 16 and May 1 day?
- Can I go to the temple to burn incense on the first day of the first month?
- When is the best time to buy a car in a year?
- How do brides say four auspicious words when they go out? How to open an umbrella to worship the ancestors and get on the sedan chair
- What does Maji mean?
- 202 1 On the 21st day of the first lunar month, should the zodiac be auspicious or auspicious?