Traditional Culture Encyclopedia - Lucky day inquiry - Should the house be decorated with tiles or old walls first?
Should the house be decorated with tiles or old walls first?
I: Design and Planning Stage
1: Check the house.
2. Reasonable planning plane and capital budget
3. Collect ideas and communicate with designers.
4. Contact with designers of decoration companies or construction teams.
6. Measure the room and make a preliminary layout.
7. Preliminary selection of household appliances and toilet equipment (some data are needed for hydropower production)
8. Communicate the design scheme and review the budget.
9. Preparations for the construction stage.
10: book some main materials according to the designer's or his own wishes.
Second: the construction stage
1: wall demolition and masonry.
2. Trenching, hydropower transformation and acceptance. (If a heating device is installed, please complete the installation of the heating device before this.)
3. Do a 24-hour closed water test on the bathroom and kitchen floor (the developer needs to complete this task).
4. The closed water test started waterproof project without leakage.
5. Install titanium alloy doors in the bathroom (if there is any delay, it is just necessary to reserve a wall with doors for the bricklayer to close the house).
5. Sticking of floor tiles, skirting lines and doorstones in bathrooms, kitchens and restaurants.
6: Find the floor if you need it.
7: Kitchen cabinet measurement.
8: Custom size of finished door.
9. Woodworking comes into play, ceiling, plaster corner line.
10: At the same time, make all kinds of wooden doors, shape doors and flatten them.
1 1: Installation of kitchen and bathroom ceiling
12: Marble of bay window can be installed synchronously.
13: On-site production of TV background wall and some furniture.
14: Installation of finished door window cover.
15: Painters enter the site to finish the wall foundation work, and the ceiling is crack-proof and rust-proof.
16: Scrape the wall in batches to finish the joint repair work left by carpenters.
17: Paint wood.
18: wall paint spraying.
19: install lamps and socket switches, as well as kitchen and bathroom hardware.
20: Install the floor (kitchen cabinets and furniture cleaning equipment can be installed before, and can be interspersed)
2 1: install the cupboard door and sliding door of the finished wardrobe.
22: Finish the first cleaning.
Three: supporting parts
1: Furniture enters the site.
2. Installation of decorative painting and placement of decorations.
3. Placement of green plants
4. Conduct necessary air quality tests.
5. Indoor ventilation and pollution prevention.
6: Get ready to check in.
- Previous article:Pangu Seven Star Hotel Hotel Scale
- Next article:How to choose a good moving auspicious day?
- Related articles
- Engagement date 2021March 3 1 is an auspicious day for engagement?
- How to rent a single apartment?
- Is September 3rd an auspicious day?
- What do married women need to prepare?
- When is the most auspicious time to get engaged in May 2022?
- Is 20237 16 an auspicious day?
- Is August of the Year of the Tiger in 2022 the best day for pigs to get engaged?
- The English name of Want Want's WeChat girl and the nickname of Wang Cai's WeChat girl.
- Experts, when is the best time for me to get married?
- Is August 1 1 day in the year of the tiger in 2022 a good day for a haircut?