Traditional Culture Encyclopedia - Lucky day inquiry - The steps of decorating the house by yourself are very rewarding.

The steps of decorating the house by yourself are very rewarding.

(1) civil engineering transformation stage

(1) After entering the site, dismantle and build walls;

(2) Preliminary measurement and design of customized doors, cabinets, bathtubs, furniture and radiators. ;

(3) slotting and hydropower transformation;

(4) Concealed hydropower reconstruction project of buried trunking;

⑤ Do a good job of waterproofing, and do a 24-hour closed water test on the bathroom (kitchen) floor;

⑥ Tile the bathroom, kitchen wall and ground;

⑦ Customize doors, cabinets, bathtubs, furniture, etc. Should be re-measured.

2) Primary treatment stage

(1) When the carpenter comes into play, the ceiling and plastering line;

(2) Door covers, window covers and wooden cabinet frames (except customization);

(3) at the same time make all kinds of wooden doors, doors (except custom);

④ Brush dust-proof paint (clear oil) on the wooden panel;

(5) leveling and laying a marble countertop on the windowsill;

⑥ Veneer, thread making and hardcover;

⑦ Treatment, polishing and leveling of wall foundation;

⑧ Paste adhesive (edge protection) at the edge joints of furniture, doors and windows.

(3) Detail processing stage

(1) Paint the wall at least three times, and brush it twice before;

(2) furniture paint comes into play, repair holes and paint;

(3) dealing with edges and corners, laying floor tiles and passing through doorstones;

(4) Spread the floor to prevent formaldehyde, mold and germs from polluting the floor under the floor;

(5) Customize doors, cabinets, bath cabinets, furniture, radiators, etc. Enter the scene;

⑥ Installation and debugging of lamps, switches, sockets, sanitary wares, handles, door locks and pendants;

⑦ Paint the wall for the last time;

8 cleaning, floor tile repair and exit;

Pet-name ruby decoration company internal preliminary acceptance;

Attending the formal acceptance time agreed by the three parties and delivered to the owner.

(4) Check-in preparation stage

(1) furniture comes into play;

(2) all kinds of electrical products and accessories such as curtain cloth come into play;

③ Preliminary sanitation and cleaning;

(4) Remove residual decorative materials and wipe off volatile decorative substances, such as paint and glue;

⑤ Indoor air quality inspection shall be carried out 7 days after the completion of all renovations or before check-in;

⑥ Take necessary comprehensive measures to control indoor air pollution;

⑦ Using charcoal in charcoal helps to remove air pollution and peculiar smell inside furniture;

8 overall hygiene and cleanliness;

Pet-name ruby choose auspicious day to move into the house.