Traditional Culture Encyclopedia - Lucky day inquiry - Can it be decorated in March of the lunar calendar in 2022? When is the auspicious day for decoration?

Can it be decorated in March of the lunar calendar in 2022? When is the auspicious day for decoration?

march forward

March in the lunar calendar is the third month of the year.

Traditionally, the third month of the lunar calendar is called the full moon, which is also called the time of cherry bud and the time of warbler.

March of the lunar calendar is called Peach Month, Spring Festival Evening, Late Spring, Late Spring, Silkworm Month, Last Spring, Spring Day, Silk Month, Seasonal Month, Welcome Month and Late Spring.

In 2022, the third month of the lunar calendar was an auspicious day for decoration.

Lunar calendar: the second day of March 2022; Gregorian calendar: Saturday, April 2, 2022, rushing to the rabbit and evil east.

Lunar calendar: March 2022 10; Gregorian calendar: on Sunday, April 10, 2022, pigs are washed away to ward off evil spirits.

Lunar calendar: March 2022 17; Gregorian calendar: Sunday, April 17, 2022, Shanan, Ma Chong.

Lunar calendar: March 2022 19; Gregorian calendar: Tuesday, April 19, 2022, rushing to the north.

Lunar calendar: March 2, 20221day; Gregorian calendar: On Thursday, April 2, 2022, the dog was driven to the south.

Lunar calendar: March 29th, 2022; Gregorian calendar: Friday, April 29th, 2022, Shanan, Ma Chong.

What is the process of decoration construction?

First, the civil construction stage

Enter the construction site, tear down the wall and build it; Trenching, hydropower transformation and acceptance; Buried trunking concealed hydropower renovation project, waterproof project, 24-hour closed water test of toilet and kitchen floor; Toilet and kitchen wall tiles.

Second, the grass-roots processing stage

When the carpenter comes into play, hang the ceiling and plaster the corner line; Wrap the door cover and window cover to make a wooden cabinet frame; At the same time, make all kinds of wooden doors, modeling doors and flat pressing doors; Brush the wooden panel with dust-proof paint (clear oil); Leveling and laying marble countertops on the windowsill; Veneer, thread, hardcover; Treatment, polishing and leveling of the wall surface at the grass-roots level; Glue the joints of furniture and doors and windows (protective edges).

Third, the detail processing stage.

Brush the wall at least three times; Furniture paint comes into play, fills holes and paints; Treat the corner, lay floor tiles, solid wood or composite wood floors, waterproof marble strips and skirting lines; Installation and debugging of lamps, switches, sockets, sanitary ware, handles and door locks; Cleaning, floor tile joint repair, exit; Internal preliminary acceptance of decoration company; Three parties make an appointment for formal acceptance and deliver it to the owner.