Traditional Culture Encyclopedia - Lucky day inquiry - The most comprehensive information on the steps of decorating a new house.

The most comprehensive information on the steps of decorating a new house.

Generally speaking, the construction sequence of the decoration project is: building structure transformation → water and electricity wiring → waterproof engineering → tile paving → woodworking production → woodworking painting → wall painting → floor paving → water and electricity installation → equipment installation → pollution control → sanitation and cleaning → occupancy on auspicious days.

The construction sequence of each type of work in home decoration is: bricklayer → plumber → mason → carpenter → painter → plumber → equipment installer → pollution control worker → cleaner. When formulating specific construction procedures, we should usually pay attention to the basic principles such as overall arrangement, finished product protection and safety and environmental protection.

First, understand and compare the choice of decoration companies

Organize ideas: coordinate and unify the thoughts and opinions of family members, read more materials and cases, and initially determine the style.

Budget: according to the family's economic situation, initially determine the decoration budget and make it rich. Determine the upper limit of foreseeable basic projects such as decoration and main materials and strictly implement them.

Tip: It is normal for the final accounts to exceed the budget 10%, and it is not new to exceed 30%!

Choice: the contractor is the most tired and the contractor is the most uneasy, or the main materials are purchased by themselves, and the others are handed over to the decoration company!

Choose two company modes for reference:

A entrust a supervision company to bid;

B go directly to the home improvement market to find a home improvement company;

Tip: There are three ways to distinguish the strength of a decoration company.

1. Check its qualification certificate and business license. Look carefully at whether the business scope of the business license (which must be hung on the wall according to the regulations) has a business license issued by the construction department. Companies that can have these certificates should be said to be regular companies. It should be noted that the photocopies provided by some companies may be affiliated with other decoration companies, or even forged with other people's certificates.

2, test the quality of its personnel. By talking with the staff of the decoration company, we can understand their comprehensive quality and business philosophy. Receptionists in regular companies have extremely rich explanations and will give accurate answers to general questions. In addition, you can take out the floor plan of your house and let them design it. A good designer will design several schemes for you to choose from according to your requirements. Pay special attention to the age and life experience of designers. Designers of some decoration companies, many of whom are fresh graduates. Although they may not be bad in design style and ability, most of them have no independent family life experience, so they often don't consider the function of home, which leads to flashy design.

3. Ask about the decoration quotation. Generally speaking, the decoration quotation is closely related to the project quality. Because the material quotation can be verified in the market. If the quotation of materials is normal, the total quotation is obviously low, which is probably due to the low quality of the project.

Second, negotiate and finalize the transformation plan.

Design scheme requirements, sketch drawing, comprehensive communication, on-site measurement, provision of construction and renderings, and preparation of decoration budget.

Tip:

1, most home improvement companies do not charge design fees separately, but the design will follow some rules and form routines.

2. Some companies pay designers. If you want to publicize your personality and have abundant funds, you can ask them to design independently, not only because these designers are generally senior designers, but also to supervise and guide your home improvement. Generally, it costs 2000-3000 yuan, which is still worth it.

Third, sign the renovation contract.

Sign a contract to determine the decoration scheme and materials, determine the project budget, determine the construction period, and sign a contract.

Tip:

1. At this time, the budget provided by the home improvement company is only the foreseeable project budget, while the structural demolition, piping and wiring, gypsum ceiling, lamps and lanterns installation, etc. It needs to be calculated according to the actual measurement after the completion of the stage project, remember!

2. Beware of over-reporting and false reporting of the budget of the home improvement company. It is suggested that the project budget should not be confirmed on site, but should be measured on site and re-examined.

3. Read the contract carefully. If the provisions are not clear, it shall be required to explain on the spot or sign a supplementary agreement.

4. The signed contract shall be unified and standardized by the relevant state departments, and shall be confirmed to be legal and effective after being signed by the local market appraisal or seal.

Attach renovation contract's model essay:

Decoration construction contract

Employer (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

According to People's Republic of China (PRC) Contract Law, Regulations on Construction and Installation Project Contracts, People's Republic of China (PRC) Consumer Rights Protection Law, People's Republic of China (PRC) National Price Law, Harbin Regulations on Protecting Consumers' Legal Rights and Interests, and People's Republic of China (PRC) Ministry of Construction Document No.92 (1997).

I. Overview

1. The house decorated by Party A is legally inhabited.

Party B is a civil decoration enterprise legal person approved by the administrative department for industry and commerce and the relevant departments of the Municipal Construction Committee.

2. Decoration construction site: Room 2-502, Building 5, Rongcheng Garden South Zone, Huairou District.

3. House structure: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Contents of decoration construction: See Annex 1 Table of Decoration Construction Contents for details.

5. Contracting method: _ _ _ (contracting, contracting, contracting).

6. Total price: RMB _ _ _ _, in words (RMB): _ _ _

These include:

Material cost: _ _ _ _ _ _, labor cost: _ _ _ _ _ _

Management fee: _ _ _ _ _ _ _, design fee: _ _ _ _ _ _ _

Garbage cleaning fee: _ _, tax (3.4 1%): _ _

Other expenses: _ _ _ _

With the consent of both parties, the construction content is changed, and the project payment for the changed part shall be calculated separately according to the actual situation.

7. Construction period: from _ _ _ _ _ _ _ to _ _ _ _ _ _ _ _ _

Second, about the agreement of the material supply:

1. Materials provided by Party A: See Annex II "List of Materials and Equipment Provided by Party A" for details.

The materials and equipment that Party A is responsible for purchasing and supplying for this project shall be qualified products that meet the design requirements, and shall be supplied to the site on time, and Party B shall go through the acceptance formalities. If there is any quality problem or specification difference in the materials and equipment supplied by Party A, Party B shall promptly raise it with Party A in written form. If Party A still says that it will be used, Party A shall bear the responsibility for the engineering losses. After the materials supplied by Party A arrive at the site, they shall be kept by Party B after passing the acceptance. Party B may charge a storage fee for the materials provided by Party A, and the rate shall be determined by both parties. Party B shall be responsible for compensating the losses caused by improper storage.

2. Materials provided by Party B: See Annex 3 "Quotation of Main Materials" for details.

3. The decoration materials and equipment purchased by Party B from Party A shall be used for residential decoration agreed in this contract, and shall not be used for other purposes without Party A's consent ... If Party B violates this regulation, Party B shall compensate Party A at twice the price of the misappropriated materials and equipment.

4. If the materials and equipment provided by Party B do not meet the quality requirements or have different specifications, they shall not be used. If it has been used, Party B shall be responsible for the losses caused to the project. If the materials and equipment provided by Party B are fake and shoddy goods, Party A shall be compensated twice the price of the materials and equipment.

Three. Agreement on project quality and acceptance:

1, this project implements the local standards and quality evaluation acceptance standards formulated by the municipal construction administrative department, such as DBJ08-62-97 Technical Specification for Residential Building Decoration Engineering, DB3 1/T30- 1999 Acceptance Standard for Residential Decoration.

2. The construction scheme of this project is designed by Party A..

3. If the quality of materials and equipment provided by Party A is not up to standard, which will affect the project quality, the cost of rework shall be borne by Party A, and the construction period shall be postponed.

4. In case of quality accident due to Party B, the cost of rework shall be borne by Party B, and the construction period shall remain unchanged.

5. During the construction process, Party A shall contact Party B in advance when proposing design modification opinions and adding or subtracting engineering projects. The construction of this project can only be carried out after signing the project change order (see annex for details), thus affecting the completion date agreed by both parties. If Party A agrees with the workers to change the construction content privately, all consequences shall be borne by Party A, and if losses are caused to Party B, Party A shall compensate.

6, project acceptance.

Party A and Party B shall handle the acceptance formalities of concealed works and intermediate works in time. If Party A fails to attend the acceptance as scheduled, Party B shall organize personnel to carry out the acceptance, and Party A shall approve it. Thereafter, if Party A requests reinspection, Party B shall reinspect as required. If the reinspection is qualified, the expenses for reinspection and rework shall be borne by Party A, and the construction period shall be postponed.

7. Project completion: Party B shall notify Party A of the acceptance three days in advance, and Party A shall organize the acceptance within three days after receiving the notice, and go through the acceptance handover procedures (for details, please refer to the Appendix "Project Quality Acceptance Sheet"). If Party A fails to organize the acceptance within the specified time, it shall notify Party B in time and set another acceptance date. If it passes the completion acceptance, Party A shall acknowledge the original completion date and bear Party B's storage expenses and other related expenses.

Four, the relevant safety production and fire prevention agreement:

The construction drawings and practices provided by Party A and the construction site shall meet the requirements of fire prevention and accident prevention, mainly including the smoothness and qualification of electrical lines, gas pipelines, tap water and other pipelines. During the construction period, Party B shall take necessary safety protection and fire control measures to ensure the safety of operators and nearby residents, and prevent accidents such as pipeline blockage, water leakage, power failure and damage to houses and articles of nearby residents. In case of the above situation, Party A shall be responsible for compensation; Where Party B is responsible, Party B shall be responsible for repair and compensation.

Verb (abbreviation of verb) Agreement on project price and settlement:

1, and the project payment method is shown in the following table:

Note: If there are other provisions in the tangible market of decoration engineering, it can also be handled according to the market regulations.

2. Project Settlement: See Annex 6 Project Settlement Table for details.

3. The warranty period of the project is one year. Party A and Party B can only sign the Project Warranty (see Annex 7 for details) after the project payment is fully settled, and the warranty period is calculated from the date of signing the completion acceptance.

4. Receipts shall be issued for the capital exchanges between the two parties, and invoices shall be issued at the end of construction.

Other matters of intransitive verbs

1, Party A's work:

(1) Party A shall provide Party B with _ _ _ copies of construction drawings or practice instructions approved by the property management department one day before the start of construction, and make on-site disclosure to Party B. Empty all or part of the house and remove obstacles that affect the construction. Protective measures should be taken for furniture and furnishings stranded in houses that can only be partially vacated. Provide Party B with necessary conditions such as construction water and electricity, and explain matters needing attention.

(2) Do a good job in the coordination of the temporary use of public parts in the construction and the influence on neighborhood relations.

(3) If it is really necessary to dismantle or change the original building structure or design the pipeline, it shall be responsible for going through the corresponding examination and approval procedures at the local housing management department or property management department, and bear the relevant expenses.

2. Party B's work:

(1) Participate in the on-site disclosure of construction drawings or practice instructions organized by Party A. ..

(2) Appoint _ _ _ _ as the representative of Party B at the site to be responsible for the performance of the contract. Organize the construction as required, complete the construction task on time with good quality and quantity, and solve all matters that Party B is responsible for, and Party B shall recognize its behavior. If there is any personnel change, Party B shall promptly notify Party A in writing.

(3) Without the consent of Party A and the approval of the local housing management or property management department, the original building load-bearing structure and all kinds of equipment and pipelines shall not be dismantled at will.

Seven. Liability for breach of contract:

1. If the project is delayed or stopped halfway due to Party A's reasons, Party A shall compensate Party B for the losses caused by the stoppage or slowdown, and Party A shall pay RMB to Party B for each day of stoppage or slowdown; If Party A fails to make payment as agreed in the contract, Party A shall pay% of the overdue payment as penalty for each day overdue.

2. If the completion is delayed due to Party B's reasons, Party B shall pay _ _% of the project payment to Party A for each day overdue.

3. Without going through the relevant formalities, Party A forcibly requests Party B to dismantle and rebuild the original load-bearing structure of the building and the equipment and pipelines used by * * *, and Party A shall be responsible for the losses or accidents (including fines) caused thereby.

4. If Party B dismantles or changes the original building load-bearing structure or equipment pipeline, the losses or accidents (including fines) caused thereby shall be borne by Party B..

VIII. Dispute handling methods:

1. In case of any dispute over the quality of the project, both parties may consult and mediate with the Family Decoration Committee of Shanghai Building Decoration Association on the basis of the text of this contract and the unified invoice issued by the construction enterprise, or apply to the district/county construction administrative department or the consumer association for mediation.

If the parties are unwilling to settle the dispute through negotiation or mediation, or negotiation or mediation fails, they can submit the dispute to arbitration.

-The Municipal Arbitration Commission applies for arbitration.

-the people's court brought a lawsuit.

(Underline the unselected solutions)

Nine. Modification and dissolution of the contract:

1. After both parties sign the contract (the contract signed in the tangible market must be witnessed by the seal of the market management department), both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in writing, pay liquidated damages at% of the total contract price, and go through the termination procedures.

2. In the process of construction, if either party proposes to terminate the contract, it shall submit it to the other party in writing. After both parties agree to go through liquidation procedures and conclude an agreement to terminate the contract, the contract shall be deemed to be terminated.

X. Other agreements:

1.2.3.

XI。 This contract is made in _ _ _ _ copies, each party holds one copy, with the same legal effect. The annex to the contract is an integral part of this contract.

Party A (signature): _ _ _ _ _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Authorized Agent: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _

Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Phone number: _ _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Postal code: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Date of signature: _ _ _ _ _ _ _ _ _ _ _ _

Signing place: _ _ _ _ _ _ _ _ _

Four, please or personally supervise the construction.

prepare

1. Check the flatness of the living room-wall, floor and roof, and the water supply and drainage pipes.

2. Electricity and gas flow detection, and make records.

3. Material preparation.

4. Personnel scheduling. Determine the construction personnel and the person in charge of the site.

5. Workshop and site lofting. Show construction drawings and construction production requirements.

Construction process of decoration company

1. Demolition: If it is structural, the procedures should be completed. Disposal: Demolished garbage and waste. Cleaning: cleaning the construction site.

2. Hydropower and coal projects

A. Discharge of hot and cold water pipes and installation of water supply equipment.

B. Power supply, electrical appliances, communication and lighting shall be discharged, the card loading position shall be determined, and the switch socket in the box shall be positioned and installed.

C. installation of gas pipelines and gas appliances.

3. Masonry works A. Bricklaying, partition walls, doors and windows B. Painting C. Installing hangers.

4. Metalworking project A. Installation of aluminum alloy doors and windows and plastic steel doors and windows. B. install anti-theft doors and windows and canopy. C. install the clothes rack.

5. Woodworking project A. Wood products manufacturing: door and window covers, partitions, corner lines, ceiling partitions, kitchen utensils, porches, etc.

B production of soft sleeper furniture (wardrobe, bookcase, TV cabinet, shoe box, etc.). ).

C. Laying floors and skirting lines (boards). D. mosaic assembly of glass products.

6. Decorative engineering wall pasting, top paper (cloth) and soft decoration production.

7. Paint project A. Batch of embedded walls, top putty and paint. B. Wood products are embedded with putty in batches. Painting. C. Paint the floor and skirting line (board). D. flour for brushing latex paint on the top of the wall.

8. Installation works

A. install electrical switches, socket panels and lamps.

B. door locks and doorbells.

C. Sanitary ware three-piece set and hardware accessories (faucet, soap basin, towel rack, paper box, bathtub handrail, mirror glass)

D. range hood, water heater and exhaust fan.

Tip:

1, at different stages of the project, the key is to confirm the materials, on-site supervision of key parts and on-site inspection and acceptance.

2, strictly grasp the progress of the project, choose to buy the main and auxiliary materials in advance, to avoid delays in the construction period.

3, gas, plastic steel, floor and other projects that need to be built by manufacturers should coordinate with the decoration team in advance to determine the detailed plan to avoid problems.

V. Acceptance of the house by the owner

Overall acceptance and transformation of space

1. Clean up the site and clean up the decorated rooms one by one.

2. Conduct acceptance according to the acceptance criteria (re-check if rectification is needed).

3. Provide pipeline circuit diagrams and warranty cards for equipment and products.

4. According to the actual decoration engineering quantity summary calculation, invoice.

5. Issue the warranty card of decoration engineering reputation project.

Tip:

Don't just look at the big picture, the corner is the key, especially at the junction of various corners and different materials. If you find a problem at this time, you can solve it immediately, otherwise you will have to wait for after-sales service.

Settlement of decoration expenses with intransitive verbs

Tip:

1. Carefully review all expenses calculated according to the actual measurement, and review all expenses according to the budget table to avoid double calculation. Pay the decoration company according to the contract.

2. Everyone should consider the warranty period. Most of the decoration money is paid in advance. It is best to settle all expenses after the warranty period.

Seven, warranty, pay off all expenses to the decoration company.

After the decoration service and warranty, settle all expenses with the decoration company.