What is the renovation process of the new house?

1. Property approval &; Technical disclosure. Before starting work, you need to go to the property to go through the formalities such as decoration permit.

2. Hydropower transformation. The first working procedure of entering the site is water and electricity decoration, and the construction period is 3~7 days (depending on the number of decoration projects). After the backfill is completed, the waterway needs to be pressed and tested, and the circuit needs to be electrified for acceptance.

3. bricklayer/carpenter. According to the regional and technological differences, bricklayer and carpenter are the second stage, and whoever comes first depends on the specific situation.

Paint. Painting is the last step of decoration, including latex paint and wood paint on the top of the wall, which belongs to surface engineering.

5. install. After the renovation, you can only calculate 2/3 or half of the workload before moving in. Next, you need to install sanitary ware, cabinets, lamps, switch socket panels, indoor doors, custom wardrobes, hardware, floors and so on.

A successful decoration company must have a certain reputation to have a good exposure. Suzhou Anranju Decoration Group builds exquisiteness with lean, exchanges trust with responsibility, and wins the enterprise with professionalism. The average working age of industrial workers living in peace is over 10 years old, and exquisite technology and stronger sense of responsibility have saved many worries for customers' new homes.