Traditional Culture Encyclopedia - Lucky day inquiry - 20 17 Suzhou decoration labor price?

20 17 Suzhou decoration labor price?

Gong Li: If you don't smash the wall, it is generally 500- 1000 yuan (the cost of going up and down the stairs) for floors below the 7th floor.

Water heating: 600-800 yuan (including sanitary ware installation)

Electrician: 800- 1200 yuan (including lamp installation)

Bricklayer: 1800-2200 yuan (the tile area of such a big house is generally about 50 square meters)

Woodworking: 2000 yuan. Nowadays, popular cabinets are all customized, and more carpentry is only used for modeling (ceiling, background wall, etc.). )

Oilman: 65,438+0,500-2,000 yuan (the area of Dabai is about 2.5-3 of the building area, but your home has 200-240 flat Dabai, and the scraping method of Dabai is very different. This price guarantees quality, but does not pursue perfect price. The perfect price of big white scraping is much more expensive)

The above is only a rough analysis based on the current market. The final result is that the labor cost is between 7000- 10000.

Most decoration companies don't charge labor costs because they don't make money. Even if there is a decoration company, the price is much higher.