Traditional Culture Encyclopedia - Lucky day inquiry - Is March 24th, Year of the Tiger, 2022 a good day for decoration?

Is March 24th, Year of the Tiger, 2022 a good day for decoration?

Before the house is renovated, a simple foundation laying ceremony will be held in many places, and this ceremony is also very particular about the choice of date. So March 24th, 2022 is a good day for decoration? Spring in March is the beginning of all new life. The warm spring breeze blows all over the earth, awakening the animals and plants that have been sleeping all winter. If you want to know more about the third month of the lunar calendar in 2022, let's take a look.

Is March 24th, Year of the Tiger, 2022 a auspicious day for decoration?

Gregorian calendar: Sunday, April 24, 2022, Taurus (Gregorian calendar)

Lunar calendar: March 24, 2022 (lunar calendar)

Today's almanac is appropriate.

Avoid everything today and don't spend it on big things.

Today's old almanac is taboo.

Avoid everything today and don't spend it on big things.

Auspicious and auspicious: heaven, virtue, moon, virtue, life, glory, prosperity and sunshine.

Should avoid fierce: kill a small number of Suzaku Mafia on the highest day of the month, and consume a small number of eight experts and four strikes every month.

Peng Zuji: Ding doesn't shave his head, he doesn't take medicine when his head is sore, and poisonous gas enters the intestine.

God of wealth: southwest

West deep: due south.

Wealth: due east

Today's Zodiac: Cattle

Yin Na today: Tianhe

Sha Fang: Shaxi

Based on the above lunar calendar, we can see that March 24, 2022, the year of the tiger, is the day of breaking major events, so this day is not suitable for decoration.

The process of signing the renovation contract

1. Business negotiation:

(1) Explain the design operation process;

(2) Discuss the basic requirements of customers;

(3) Propose the charging method.

2. Sign the design contract (preliminary discussion):

(1) for field measurement records.

(2) Draw a preliminary plan of the plane and the top surface.

(3) Communication and finalization of the preliminary design scheme.

3, the whole scheme design (in-depth):

(1) Drawing design details;

(2) Communication and finalization of design drawings;

(3) Draft the budget.

4. Finalization of budget and materials (details):

(1) Discussion on the applicability of building materials;

(2) Confirmation of project budget;

(3) Prepare the list of building materials.

5. Sign the project contract:

(1) Sign a formal contract;

(2) Send the drawings to the Engineering Department for archiving;

(3) Prepare materials.