Traditional Culture Encyclopedia - Lucky day inquiry - Steps and procedures for decorating the house

Steps and procedures for decorating the house

The process and steps of house decoration

First, the decoration preparation

It is better to prepare for the decoration one month in advance. Preparation time is too long, there is no need to let yourself suffer longer; Too short, too hasty.

Second, the decoration scheme design

After measuring the house on site, the designer will further provide detailed engineering drawings and itemized quotations according to the initial needs of the owner and the actual situation of the apartment type, and initially select some material samples to introduce to the users. At this time, the owner can provide the decorators with furniture and equipment materials to match the design. According to the style selected by the user and the feedback from the user, the designer carries out home improvement design and draws the plane layout, explains the functional partition, modeling position and furniture placement, and makes overall planning for the space.

Third, choose a decoration company.

When choosing a decoration company, you should choose several companies that are comparable to your actual situation and affordability, and then learn about the home improvement design, cost and cycle of different decoration companies for consultation and comparison. Owners need to put forward their own needs, that is, to determine a good decoration idea with their families in the early stage, and to contact designers, so that designers can better combine functions and styles in the design process. Contact with the decoration company, you need to bring the floor plan of the house or let the designer directly measure the house.

Fourth, sign a contract.

Before signing the contract, the owner should check whether the formalities of the decoration company are complete. Visit the decoration site under construction by the decoration company, check the construction technology and workers' quality, and focus on the management, hygiene and fire prevention of the construction site.

Verb (abbreviation for verb) is disclosed on the spot.

With the participation of users, designers and construction leaders, the designers explain the budget items, drawings and special processes to the construction leaders in detail at the scene, and coordinate relevant procedures. In the whole process of home improvement, on-site disclosure is the first step before the start of construction after the signing of the home improvement contract. Here, both parties to the contract can clarify some issues that are not easy to clarify in the contract.

Sixth, buy decoration building materials

There are three ways to buy decoration materials: clear package, half package and all package.

Seven, decoration construction stage

1. Main body demolition and reconstruction project: The main body demolition and reconstruction is the first project, which mainly includes wall demolition, wall building, wall covering, heating removal, and replacement of plastic-steel windows. Some owners do this main demolition and renovation project in order to make the decoration design of their homes more in line with their own habits and beautiful design. If there are no relevant requirements, you can not do this step.

2. Hydropower projects. Hydropower engineering materials enter the site, the ground, wall and top surface are slotted, water supply pipes are laid, circuit wiring is carried out, water supply is electrified, and wall surface is repaired.

3. Masonry engineering. Ceramic tiles, cement and other materials come into play, kitchen and bathroom are waterproof, ceramic wall tiles are laid, and the acceptance is completed.

4. Woodworking engineering. Wood engineering materials enter the site, keel of ceiling wall is laid, panel installation and production, door cover and window cover production, wall decoration construction, wood fixed furniture production, and wood component installation and adjustment.

5, paint finishing engineering. Paint, coating comes into play, wood components, furniture painting, top surface, wall base plastering, brushing, cleaning and acceptance.

6. Installation and decoration works. Laying of ground materials, installation of electrical equipment, lamps and sanitary ware, overall cleaning and final acceptance.

What are the steps and procedures for the renovation of old houses?

The renovation of old houses involves a wide range, and the time and money spent is by no means comparable to that of ordinary decoration. Therefore, before deciding to decorate, consumers should first understand whether such a situation is worth decorating, whether they have plans to settle here for a long time, and confirm whether the purpose of their decoration is to obtain a better quality of life or simply to save face. After examining these problems, those who are still sure of their own value can move on to the next step.

Steps and procedures for decorating your own rough house

Steps to decorate your house:

(a) tools in place, ready.

Before decorating, you must prepare a few things and put them in your bag. Tape measure (buy 5m, not 3m), calculator, big board clamp (for bills and receipts); In addition, it is best to prepare old towels (soft cotton, which are used to wipe bricks after pasting) and plastic bags (wrapped around the pipeline joints to prevent dirt from blocking) at the construction site in advance.

(2) Choose an auspicious day and start shooting.

Before the workers enter the site, it is best to personally measure all corners of the house, write it down with a pen ruler and mark it clearly. Don't be lazy. The contents of the measurement mainly include:

1. Define the areas involved in the renovation process. Especially tile area, wall paint area, wallpaper area and floor area;

2, clear the bearing wall size. Especially it is necessary to design the wall size of furniture in the future.

PS: It's time to buy a radiator.

(3) The main body is removed to make the space more practical.

The main body demolition and reconstruction is the first project, which mainly includes wall demolition, wall building, wall covering, heating demolition, plastic steel window replacement and so on. Remove the garbage in time to ensure the cleanliness of the room, but also for the convenience of construction.

(d) Hydropower transformation, and arrange the use of each space.

Hydropower transformation, no regret medicine to eat. Bricks are stuck on the wall and the ceiling is sealed, so it is difficult to add another socket. So be sure to locate the switches, lights, basins, bathtubs, washing machines and so on.

Before the hydropower transformation, the cabinet designer should take measurements at home to help you determine the transformation scheme of power supply and waterway.

Water heater, it is also best to send someone to design the position of power supply and interface according to the model you determine.

Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~