Traditional Culture Encyclopedia - The 24 Solar Terms - Simple purchase agreement

Simple purchase agreement

A simple purchase contract: Fan

Buyer: (hereinafter referred to as Party A)

Seller: (hereinafter referred to as Party B)

Party A and Party B, on the premise of abiding by the Contract Law of People's Republic of China (PRC), have entered into this Contract on the purchase of products (hereinafter referred to as products) by Party A from Party B through consultation.

Article 1 Product name, material, specification, variety and quantity

1. The product name, materials, specifications, varieties and quantities are shown in the purchase list in Annex I to the contract.

2. The fixed total price is

Including all taxes and fees for product manufacturing, transportation, installation, debugging, repair and maintenance, Party A does not need to pay other extra fees for this contract.

Article 2 Quality standards

The quality and technical standards of the products listed in Article 1 of this contract shall meet the following requirements at the same time:

1, in line with the current national, industrial and Shanghai related quality and technical standards;

2. Meet the standards of xx;

3. The drawings signed and confirmed by Party A shall prevail (see Annex 2 Drawings for details). /Drawing: This item has none.

Article 3 Party B's commitment to product quality, warranty period and after-sales service

1. Party B promises that the products and services it provides are free from any defects and flaws.

2. Party B promises to provide lifelong maintenance service and a warranty period of × years for the contract products (calculated from the day after Party A's written acceptance).

3. During the warranty period, if there are quality problems (including equipment quality and installation quality) in the products, Party B shall solve them free of charge within × working days; If Party B fails to perform the warranty obligations in time, Party A has the right to entrust a third party to perform them on its behalf, and the expenses arising therefrom shall be deducted from the warranty fund. For the product quality problems beyond the warranty period, Party B shall also provide paid maintenance services in time, and Party B only charges maintenance materials and maintenance labor.

4. No matter what causes the quality problems, Party B shall repair them in time to restore the use function of the products.

Article 4 Packaging Standards, Supply and Recovery of Packaging Materials

The product packaging shall meet the requirements of Party A, and the losses caused by poor packaging during transportation shall be borne by Party B. Party B shall be responsible for the supply and recycling of product packaging.

Article 5 Quantity and supply mode of product accessories, spare parts and tools Party B promises to provide Party A with the necessary quantity of product accessories, spare parts and tools (if any). If there are shortages or quality problems, Party B shall be responsible for solving them.

Article 6 Reasonable loss standard and calculation method

None of the products listed in this contract are damaged.

Article 7 Product Delivery and Installation

1. Party B shall transport all products purchased by Party A to the place (address) designated by Party A by car within × working days after receiving the advance payment from Party A/× working days after receiving the notice from Party A. All transportation expenses shall be borne by Party B. ..

2. Within working days before the product is delivered, Party B shall inform Party A of the following information in written form: delivery date, expected arrival date, matters that Party A should prepare, installation conditions, etc.

3. Within × working days after all products are delivered to the place designated by Party A, Party B shall be responsible for completing the product installation according to Party A's requirements. /Completion time of product installation: None for this item.

4. After all products are installed, Party B shall notify Party A to organize product acceptance.

Article 8 Transfer of ownership

The ownership of the products shall be transferred to Party A from the date when the representative of Party A designated by Party A in writing accepts the products. However, if Party A fails to fulfill its obligation to pay the product price, the product risk liability shall still be borne by Party B. ..

Ninth acceptance criteria and methods, the time limit and methods of raising objections.

1, acceptance criteria and methods:

1) shall be accepted according to the quality standards listed in Article 2 of this contract.

2) completeness and conformity of product quality certificate, product packing list, product quality guarantee, product instruction manual, product warranty card and other materials;

3) Integrity of product appearance and consistency with drawings and samples;

4) the adaptability of the product to meet its use function;

5) After the product is installed and debugged, it meets the technical requirements of the drawings.

2, the time limit and method of objection:

1) If Party A finds that the variety, model, specification, quantity or quality of the products do not meet the above inspection standards during the acceptance process, it can raise objections and solutions to Party B in writing within seven working days. After receiving Party A's written objection, Party B shall be responsible for handling it within five working days, otherwise it shall be deemed that Party B agrees with Party A's objection.

2) If Party A has not received a reply from Party B three working days after filing a written objection, Party A has the right to handle the objection by asking Party B to replace the product or return the product.

Article 10 Method, place and time limit of settlement

1. The settlement method is cheque settlement, and the settlement place is in Shanghai.

2. Within ×× years after the contract comes into effect, Party A shall pay Party B an advance payment of ××% of the contract price, totaling RMB ××××× (RMB ×××××××); /Prepayment: None for this project.

3. Within working days after the written acceptance of the representative of Party A appointed by Party A, Party A shall pay Party B ×% of the contract price, namely RMB (¥).

4. The balance of ××% of the total fixed contract price shall be used as the quality guarantee, and shall be paid to Party B (if any) within × working days after the quality guarantee expires. /Quality assurance: None for this project.

Article 11 Liability for breach of contract

1. If Party B fails to manufacture according to the quality standard in Article 2 of this contract, or fails to deliver the goods according to the specified time schedule, or delays the installation, or fails to handle the objections raised by Party A within the specified time limit, Party A has the right to unilaterally terminate this contract and demand Party B to fully refund the contract price paid by Party A and compensate Party A for its losses.

2. If Party A fails to pay the contract price on schedule without reason, Party A shall pay 3 ‰ of the unpaid contract price to Party B for each day overdue; If the payment is overdue for more than five days, Party B has the right to terminate this contract unilaterally.

3. If Party A or a third party suffers personal or property losses due to product quality or installation quality, Party B shall bear the corresponding liability for damages.

4. The total amount of all compensation (including but not limited to liability for breach of contract and tort) undertaken by Party A is limited to% of the contract price.

Article 12 Ways to resolve contract disputes

In case of any dispute during the performance of this contract, both parties shall settle it through consultation; If negotiation fails, either party may bring a lawsuit to the court with jurisdiction in the place where the contract is signed.

Article 13 Annex

Annexes to the contract include: Annex I, Purchase List;

Appendix II "XX Drawings". Annex II: None in this project.

Article 14 Other matters

1. Party B shall submit to Party A copies of business license and qualification certificate, as well as originals of product quality certificate or quality guarantee, product instruction manual and product warranty card.

2. Any supplement or modification to this contract shall be completed in the form of written agreement. This contract and its supplementary agreement (if any) shall be signed by the authorized representative of Party A and signed page by page. Party A shall affix the official seal or contract seal at the designated location (including the saddle stitch), which shall come into effect after being signed by Party B's representative and affixed with Party B's seal. ..

3. Party A is appointed as the representative of Party A, and Party A's representative shall perform its obligations under this contract after being authorized by Party A in writing.

4. This contract and its annexes are written in Chinese. This contract is made in duplicate, one for each party, with the same effect, and any alteration is invalid.

5. Termination conditions of this contract: This contract will be terminated after both parties terminate this contract or the warranty period of the products in this contract expires.

6. The contract amount is expressed in words and figures, which should be consistent; In case of any inconsistency, the written expression shall prevail. (There is no text below)

Party A: (Seal) Authorized Representative: (Signature)

Party B: (Seal) Representative: (Signature)

Year month day:

Simple procurement contract model II

Demander: Supplier:

Signing time: Signing place:

After full consultation, the two parties reached an agreement on the procurement of goods and related audit matters, and hereby signed this contract for both parties to abide by.

I. Serial number of the subject matter of the contract [product name, model, (specification), unit, quantity, unit price, amount and delivery time] Product name, specification and model.

unit

amount

unit price

a sum of money

delivery date

comment

123 Total amount: ¥

Second, the place of delivery:

3. Delivery method: the freight is paid by the buyer when the logistics arrives.

4. Packaging requirements of goods: The supplier shall ensure that the packaging quality meets the requirements of transportation safety, protect the products from damage, and meet the requirements of product characteristics.