Traditional Culture Encyclopedia - The 24 Solar Terms - What is the problem that the airflow group 2 of Mercedes-Benz secondary air system is too small?
What is the problem that the airflow group 2 of Mercedes-Benz secondary air system is too small?
The problem of secondary air injection valve and pump is that the airflow cylinder group 2 of Mercedes-Benz secondary air system is too small. According to the relevant public information, check whether the air pump works, check whether the lock valve is blocked, check the vacuum tube pressure, check whether the cylinder head is blocked, and finally check the computer and exhaust pipe.
- Previous article:Ask junior high school Chinese questions and the students will help.
- Next article:Which solar term is both a solar term and a festival?
- Related articles
- Write proverbs about heavy snow and solar terms.
- Five elements analysis of birth
- In 2023, beginning of spring hid in the spring.
- What are the ancient poems about rain and solar terms?
- Which effect is better, vacuum atmosphere box furnace or tube atmosphere furnace? What is the difference?
- Where is the waste gas valve in lifan 620?
- What products and services does the workshop that meets Xiaoman provide?
- Diary of running exercise between classes
- The implication of China gas altar
- What porridge do you drink in the snowy solar terms?