Traditional Culture Encyclopedia - The 24 Solar Terms - How to install the side net toolbox of semi-trailer
How to install the side net toolbox of semi-trailer
1. The toolbox of the semi-trailer is arranged under the floor of the semi-trailer, and the frame with girders is also arranged under the floor of the semi-trailer, wherein the toolbox includes the floor.
2. A front wall plate erected upward from one side of the bottom plate.
3. A rear wall plate which stands upward from the side of the bottom plate opposite to the front wall plate.
4. Two side wall plates, which respectively stand upward from the other two opposite sides of the bottom plate, so as to form a closed structure together with a front wall plate and a rear wall plate, wherein the front wall plate has at least one toolbox door, and the height of the rear wall plate is lower than that of the front wall plate.
- Previous article:Zhengzhou authentic solar terms restaurant
- Next article:When was the wheat harvested? Autumn? ...
- Related articles
- 202 1 twelfth lunar month, the location list of the god of wealth in light cold solar terms.
- What are the handwritten newspapers in the Year of the Rabbit?
- What are the characteristics of girls born in May 65438+April 2007?
- Is it better to give gifts before or after the Chinese New Year?
- Cold dew has passed three dynasties. What does it mean to find a bridge?
- Hand-painted illustrations are popular in festivals-how to hand-paint popular posters
- How to solve the abnormal sound of wire movement
- What is the best solar term in the Year of the Ox?
- Look at autumn first. What?
- Why did people in China invent mahjong? What do the cards in mahjong mean?