Traditional Culture Encyclopedia - The 24 Solar Terms - The detailed rules for the installation method of aluminum veneer teach you how to take it off and install it easily.
The detailed rules for the installation method of aluminum veneer teach you how to take it off and install it easily.
For the installation of aluminum veneer, many users do not know why. What are the installation methods and precautions? Bian Xiao will introduce users one by one.
Installation method of aluminum veneer
Step 1: Fix the skeleton first, then position the skeleton on the ballistic base and firmly fix the skeleton on the main structure. Remember to check the quality of the main structure before departure.
Step 2: Weld connectors on the columns of the main structure to fix the skeleton so that it will not fall off.
Step 3:? Before installation, the skeleton should be treated with anti-corrosion treatment. The position of the installation skeleton should be accurate and the combination should be firm. Check the center line and surface elevation after installation. In addition, in order to ensure the installation accuracy of the plate, it is best to use theodolite to penetrate the vertical frame members of the beam. The deformation joint, settlement joint, variable cross-section and so on are improved to finally meet the use requirements.
Step 4: Finally, when installing the aluminum plate, it should be firm, reliable and simple. ?
*? The gap between plates should be treated internally to make it smooth and flat. ?
*? After the aluminum plate is installed, the easily contaminated parts should be covered and protected with plastic film or other materials.
Matters needing attention in installation of aluminum veneer
1. Handle with care when transporting. Severe impact will damage the edges and corners of aluminum plate and its layout, affect the construction and waste money.
2. Pay attention to protect the board surface when installing, and don't touch the ground with the board surface to avoid scratching the decorative surface.
3. The variety, quality, color, pattern and line of aluminum plate should meet the design requirements, and should have the product certificate.
4. If the curtain wall skeleton adopts steel keel, its specification and shape should meet the design requirements, and rust removal and antirust treatment should be carried out.
5. When there is no requirement for aluminum plate installation and design, it is best to use core-pulling aluminum rivets with rubber rings in the middle. The spacing of core-pulling rivets should be controlled at100-150 mm.
6. After installation, be sure to tear off the protective film after 3 days. If it takes too long, it will be difficult to tear it off, and it will also affect the appearance after tearing it off.
The installation method and precautions of aluminum veneer are basically like this. Does the user know anything after reading it?
Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~
- Previous article:Qoros 5 throttle matching method
- Next article:The tube on the accelerator of a car
- Related articles
- What does it mean to eat jiaozi on the solstice in winter?
- What time is it in Tomb-Sweeping Day in 2023?
- Dong Wang's introduction
- What is a kindergarten-based curriculum?
- Why does Peugeot 408 engine emit a warning light that is always on?
- Why is the winter solstice in 2020 65438+February 2 1?
- Should I step on the brakes after changing the throttle?
- The car is 60 thousand kilometers old. What do you need for major maintenance?
- What day is as long as night?
- Can asparagus be planted in winter?