Traditional Culture Encyclopedia - Traditional culture - What furniture is included in all-wood home customization?

What furniture is included in all-wood home customization?

All-wood home customization is to combine the wood products needed for home decoration to provide consumers with a set of overall style solutions for home improvement solid wood products. What furniture does all-wood home customization include? All-wood furniture customized for the whole house includes porch furniture, kitchen furniture, living room tableware, dining room furniture, bedroom furniture and so on. Let's take a look at the standardization process of all-wood custom home improvement and the acceptance standard of all-wood custom home! What furniture does all-wood customization include? 1. porch furniture porch is the entrance to the house, which gives people the initial impact as soon as they enter the door. The position of the porch in Feng Shui has also been mentioned in many ways, which is particularly important. The furniture that can be configured in the porch includes: porch cabinet, shoe cabinet, coat cabinet, shoe changing stool or display cabinet, etc. Usually, everyone's porch position is very limited, and there is no room to accommodate so many different functions. Customized furniture can integrate these needs. Only one cabinet is designed, which has the functions of shoe cabinet, clothes hanging, storage bag or display shelf, and everything that can be thought of is designed uniformly, so that the limited space can meet the greatest demand.

Second, the concept of kitchen furniture The whole kitchen was popular all over the world before the whole house customized furniture. On the basis of the whole kitchen, the whole house custom furniture spread to the whole house custom furniture. Kitchen furniture is covered by integral cabinets, and details include refrigerator, cooker, cooker, storage space, oven, microwave oven, etc. The whole cabinet is designed according to the size specifications, with strong storage and drainage function and beautiful appearance.

Third, the guest dining room furniture The guest dining room has a lot of customized furniture, such as dining tables and chairs, sideboards, wine cabinets, display cabinets and business card holders. Guest dining room partition cabinet, Bo Gu cabinet, TV background wall cabinet, TV cabinet, sofa, coffee table, sofa background bookcase, etc. In these areas, the ingenious sense of design is brought into play in the application of functional combination space, which makes the space both beautiful and practical. For example, the TV cabinet and bookcase display stand are designed as combined cabinets, and the function mix and match produces a new aesthetic experience.

Bedroom furniture Bedroom furniture includes wardrobe, bedside table, dressing table, bed, footstool, bedroom TV cabinet, desk, etc. If you want to achieve multiple functions in a limited space, you must buy a lot of furniture according to the idea of finished furniture in the past, and the size of these furniture can not be accurately and meticulously integrated with the room. The whole house custom-made furniture can embody these functions in a cabinet, which saves a lot of space and cost, and the design of the measuring ruler is more accurate, and the overall beauty and practicality are integrated.

Verb (abbreviation of verb) functional room furniture Besides cloakroom, study room, tea room and balcony room, the functional room here also has special children's room furniture. Children's room furniture, such as wardrobe, bookcase, writing desk, bedside table, etc. Can be customized to accurately meet children's physical and natural needs. Study, bookcase, tatami, floor, balcony cabinet, etc. These functional storage spaces and rest spaces can achieve multi-purpose functions in one room under customized furniture, which is efficient and versatile.

The bathroom furniture that comes to mind first is the bathroom cabinet. The whole bathroom cabinet is also a category of customized furniture in the whole house. The customized integral bathroom cabinet is designed according to the user's needs in functional partition. First, meet the user's ability to store toiletries and cleaning supplies, and make the bathroom space clean and beautiful. In addition, the overall bathroom cabinet customization is more regular in water and electricity wiring, which can effectively prevent some cabinets from being corroded or bacteria breeding.

All-wood customized home improvement process 1. Pre-communication pre-communication includes communication content covering the task book and collecting data.

(1) task book: proposed by Party A or the owner and formulated by the project team.

Including the use function, age structure, determined area, business philosophy, style and investment. The living room is for the owner, and the design style depends on the owner rather than the designer, but the design details should be decided by the designer. Knowing the owner should be clear about the family structure (for example, a family of three, which runs in the family) and age structure (for example, the children have gone to primary school, are not married, and their parents have retired). ), the personality of the family leader (such as a wife-led family, whether her hobby is European style or minimalism, etc.). ), economic conditions, occupation, etc.

Collect data and arrange the project schedule. The construction drawing stage (modeling, materials and practices) includes (decorating the construction drawing; Equipment construction drawing)

1, design description, engineering material practice table, decorative materials classification table, decorative doors and windows table

2. Partition wall positioning drawing, plan, plan, ceiling drawing and enlarged drawing.

3, elevation, section

4. Details, details

Order management should be streamlined, responsibilities should be clear, error correction mechanism should be set, contact list should be reduced, efficiency should be improved, error rate should be reduced, contractors (error correction mechanism) should be reduced and customer satisfaction should be improved.

2. During the house survey (1): communicate with customers or construction leaders (try to have customers on site).

All-wood custom measurement instructions

1, the reason for measuring the house

Measuring the room is a necessary step for all-wood custom decoration. Before decoration, it is convenient to plan the overall wood customization. General designers and owners should participate in it to accurately measure and record the size of home space.

2. Standards for measuring houses

The standard of housing measurement is accurate, precise and rigorous, and the concept of "probably" should not appear. The measurement is not required to be accurate to 0. 1mm, but it also needs to be accurate to 1mm.

3, measuring room tools

What are the measuring tools? Paper, pen and ruler are indispensable. It is best to choose a steel tape for a ruler, usually 5 meters or 20 meters; The pen needs at least two colors, which is convenient for distinguishing and marking measurement drawings; You'd better prepare more sheets of white paper. In addition to the traditional measuring tools, there is now a more advanced instrument-laser rangefinder, which can accurately measure the size of houses.

4. Quantitative measurement: mainly measure the length, width and height of each hall, and calculate the area of each room for different purposes. And put forward reasonable suggestions according to the owner's preferences and daily habits.

Positioning measurement: This measurement mainly indicates the positions of doors, windows and air conditioning holes, and the number of windows needs to be scalar. In the measurement of kitchen and bathroom, the position of downpipe, hole spacing, hole spacing of toilet pit, distance from wall, position of smoke pipe, position of gas pipeline, distance under pipe and position of floor drain need to be accurately measured, so as to accurately locate them in future design.

Height measurement: In general, the height of a house should be fixed. However, due to the different buildings and structures, there may be a certain gap. In height measurement, designers should carefully check whether there is a gap in the height of each area of the room, so as to be accurate in future design drawings.

Matters needing attention in measuring houses:

1, the straight line length is correct.

2, the angle without deviation

Don't forget to measure the height of the house.

4. Don't forget to measure the details of doors and windows, balconies, air-conditioning holes, downspouts, and opening methods of entrance doors.

5. Clear connection.

6, accurate measurement of hydropower pipeline and connection relationship.

7. After drawing the initial plan, check it again if possible, and the result is an accurate drawing of the basic layout of the original house plan.

Step 1: Determine the relationship between the porch, dining room, living room and stairs (if any).

Step 2: Determine the function of the room, that is, determine whether to design a study, a room for the elderly and a room for children.

The third step: determine the traffic route to meet the relationship between indoor action and furniture layout.

Step 4: Determine the style, design the theme wall and choose the color.

III. Contract signing stage (1) sample orders: Confirm samples (order time, order requirements, orderer and order completion time).

(2) Sample customization and quality tracking: (design drawing completion time, drawing confirmation tracking, Party A confirmation tracking, production plan arrangement, material calculation tracking, material calculation confirmation, wood veneer procurement task release, hardware accessories procurement task release, wood veneer procurement tracking, hardware procurement tracking and production process tracking.

(3) Print drawings (construction drawings and other materials of Party A)

(4) The designer goes to the site, counts the actual engineering quantity, arranges the list according to the construction drawing, the company quotes and signs the contract.

Fourthly, on the basis of concept map, the product deepening scheme is designed in depth, and the schemes are analyzed and compared. All-wood customized production puts forward higher requirements for secondary deepening design and on-site setting-out. Generally speaking, the secondary deepening design is completed by the technical personnel of the contracting enterprise. He should carry out renovation design according to the design requirements of the project and the technical capacity of the factory, and the design scheme should be signed by the constructor. The setting-out work is generally completed with the cooperation of the construction unit, and the setting-out work is more accurate than the traditional decoration setting-out. The lofting size is the basis of the secondary design of the processing plant, and the error should be controlled within the controllable range. "Fine lofting, fine deepening", through the collection of on-site accurate measurement data, and according to the data to carry out construction deepening design, the complex on-site situation is transformed into machinable process drawings. From the stage of deepening design, the factory should assign professional and technical personnel to the construction site.

The product deepening diagram covers functional analysis, traffic streamline analysis and spatial analysis.

Modification and adjustment of construction scheme During the drawing period, the designer can make some modifications and adjustments to some places that are different from the design effect. Of course, the owner may have some revised ideas and opinions, and the designer should deal with them in time. However, frequent modification should be avoided at this time, which will increase the construction cost and expense, and also affect the overall effect of the design.

After deepening the drawings, check and fill gaps and adjust the contract according to the contract list. List the list in the contract and add the list outside the contract. The two sides held consultations. (Note: For the products added after signing the contract, the contact sheet is required to confirm the drawing scheme and price. The final accounts are based. )

When placing an order, the designer must include the following contents: processing list (consistent with the contract, signed and confirmed by Party A)+plane index drawing+deepening drawing.

Note: The processing list should indicate: completion time, quality requirements, hardware supply content and other process requirements.

Space is limited. The following process is detailed and will be shared in detail in the next issue.

Verb (abbreviation of verb) Connection between design and production 1) Pre-order confirmation of production department (second review of drawings, confirmation of furniture size, confirmation of furniture quantity) (design department and factory)

2) The design department and the factory (factory director, quality inspection department, ordering personnel) jointly carry out technical disclosure. In the process of processing, if there is any drawing problem, contact the design department in time and adjust the problem in time. If the problems found in production are not put forward in time, the production will adjust itself according to the wrong plan.

Production process;

Production Planning Department: (Bill of Materials Distribution: single board statistical distribution, special material statistical distribution, hardware fittings statistical distribution, single board quantity assessment, special material quantity assessment, hardware fittings quantity assessment, procurement task distribution, procurement task tracking, purchase quantity and quality confirmation, feedback to Party A according to purchase results, confirmation of Party A's change opinions, confirmation of bill of materials correctness, and arrangement of production plan according to purchase results, installation sequence and regional division rules) (factory)

The staff of bill of materials is very important, and it is an important link for designers and factories to produce in the early stage. Requirements: People who know drawings, processes and experience can draw simple CAD drawings. All drawings must reach the blanking personnel, who will disassemble the parts and arrive at the workshop of the factory in written form and list.

Detailed production process supervision of intransitive verbs (1). Wood veneer group (protect products during processing and fill in the detailed component code of each process)

Select skins according to the purchasing results (report on skin selection results of wood skin group)

Veneer and board experiment (report on the results of veneer experiment in veneer group)

Skin cutting → skin splicing → texture matching.

Fill in the finish report of finishing quantity.

(2) Woodworking group (protect products during processing, and fill in detailed component codes for each working procedure)

Check the material list (woodworking group material list inspection report)

Shearing wool → setting thickness → sending veneer group for gluing → checking veneer (quality report of veneer group for carpentry) → hot pressing → setting thickness → fine cutting → edge sealing → sending it to machining group → filling in woodworking quantity completion report.

(3) Processing group (protect products during processing, and fill in the detailed part code of each process)

Process Verification (Report on Processing Technology Requirements)

Plate Confirmation (Quality Inspection Report of Processing Group)

Slotting → slotting → falconing → drilling → delivering to the assembly team → filling in the report of processing workload completion.

(4) Assembly (protect products during processing, and fill in the detailed component code of each process)

Quality inspection (assembly group quality inspection report)

Repair → assembly → delivery of paint to paint group → delivery of repair → filling in the report on completion of assembly workload.

(5) Paint group (protect products during processing, and fill in the detailed composition code of each working procedure)

Quality inspection (paint group quality inspection report)

Primer → Drying → Topcoat → Drying → Delivery to Packaging Group → Delivery to Packaging Group → Fill in the paint workload completion report.

(6) Packaging group (protect products during delivery and fill in detailed component codes)

Quality support inspection (quality inspection report of packaging group, supporting inspection report) → packaging inventory (correctly filling in product number) → supporting delivery → filling in packaging workload completion report.

Delivery supervision: the delivery workshop must have a complete set of drawings and deliver the goods according to the drawings. Understand the delivery of products.

(7) Handling and installation group (protecting products during handling, placing and installation)

Move the furniture to the numbering area and put it in place.

Furniture inspection (furniture damage and loss report)

Seven: Installation quality inspection and installation supervision:

Designers and site installers are responsible for the disclosure of product installation requirements, drawings+plane index drawings (with factory delivery). The installer shall carry out the installation according to the drawings, and if there are any problems during the installation, he shall contact the designer to make adjustments in time. Failure to install according to drawings and communicate with designers leads to installation errors, and the installer adjusts himself, which leads to product rework, so it is necessary to write a contact sheet. All product problems in our factory are sent to the site and need to be photographed and recorded. In short, the designer records the problems on the spot and summarizes them. Communicate with factories and workshops to learn from experience. The above problem is not to investigate individual responsibility, but to put the responsibility on people, but to avoid the same mistakes in future projects, so that everyone can learn and grow together.

Eight: Completion Acceptance After the installation of all-wood custom decoration is completed, the supervision and construction unit shall conduct the acceptance of individual projects. This is the final completion stage of the renovation project. Designers, construction units and home improvement owners jointly accept the project and collect the balance of the project.

The main contents of acceptance are: whether it meets the requirements of design drawings; Whether the production quality level meets the requirements; Whether the materials meet the requirements of environmental protection; Installation quality, especially installation reliability; Appearance acceptance, etc.

During the acceptance, some disputes will inevitably occur between the owner and the construction party, generally because the decoration effect is not ideal, which is different from what was originally imagined; Or the decoration cost of the final accounts exceeds the original budget by a lot. At this time, properly handling the owner's dissatisfaction is a very important issue that designers need to pay attention to. If it is handled well, the owner will pay the final payment of the project more smoothly and introduce new customers to you. Otherwise, it will not only be difficult to recover the balance of the project, but also have a negative effect, affecting many new customers to sign the bill.

Nine: summary filing, warranty maintenance service After the construction is completed, the design documents should be sorted out and the relevant engineering design documents should be kept. In addition, we should pay attention to the warranty service of the project. Don't think that the renovation is over. Maintain a long-term good relationship with the owner, but another deal has just begun.

Acceptance standard 1, variety, specification and color of all-wood customized home materials shall meet the requirements of design drawings. The color and pattern of the decorative board should be coordinated.

2. The gap of the cupboard door on the same facade should be even, horizontal and vertical.

3, the overall facade should be tight level off.

4, grain nail, steam nail cap should be slightly lower than the board face. It is forbidden to scratch the head with steam nails and hit the nail cap higher than the board surface.

5. The convergent parts of all lines should be straight and smooth, and the width of the head and tail of the same convergent strip must be consistent. (Except design requirements)

6. Drawers, shuttle doors and cupboard doors. It should be opened flexibly and returned correctly.

7, do emulsioni paint parts, boards shall not be exposed.

8, Angle interface seam except shall not be greater than 0.5mm, Yin Angle must be under the convergent line or panel.