Traditional Culture Encyclopedia - Traditional culture - Plumbing and electricity to be how the layout is better to use, decoration how to accept the plumbing and electricity

Plumbing and electricity to be how the layout is better to use, decoration how to accept the plumbing and electricity

Water and electricity acceptance includes: water pipe wiring, wire wiring, pressure water test, circuit test, water and electricity circuit details check. Plumbing acceptance is an important part of the home improvement strategy, such as neglect, will bring great trouble to life.

Many people who understand the renovation know that in the home renovation project water and electricity belongs to the hidden project, is a very important part of the home renovation process, the slightest difference will bring great trouble to the future life, so the renovation of the acceptance, it must be careful not to miss any details, the following we come to understand the home renovation strategy of water and electricity how to acceptance?

Home Improvement Tips for Plumbing

The correct direction of the water wiring is horizontal and vertical, follow the left and right up and down towards the water pipes and water pipes at right angles to the vertical and horizontal layout. Special attention, hot and cold water pipes must be kept on a plane, and hot and cold water pipes are in the lower water outlet above shall prevail. At the same time to check whether the distance between the water pipe, electrical pipe, gas pipe is greater than 50mm, greater than the superior, and vice versa is not qualified.

Home improvement strategy of the wire layout

Wire layout to live wire-based, that is, the wire can be moved to draw back; strong and weak wires layout is clear, do not interfere with each other; wire articulation mouth for the arc shape; wire reserved 15cm length, easy to install the wire box.

Home improvement strategy of the pressurized water test

Waterway acceptance, from the upper water pipe fully closed pressurized check, pressurized pressure of 0.6 MPa, closed time 24 hours. During the period to check whether the pipeline leakage in all places, whether the water pipe is shaking loose, dripping. If there is no such phenomenon is qualified, the opposite is required to replace the water pipe.

Home improvement strategy of the circuit test

Check whether the electrical box wiring is reasonable: each circuit should be clearly separated, not all lines **** with a leakage switch protector; to confirm that the leakage protector can be used flexibly, and after the test of the interior of the various circuits whether the power is normal, such as the above are normal, that is, the completion of circuit testing, the opposite is required to be reinstalled. The opposite is required to be reinstalled.

Home improvement strategy of the water and electricity circuit details check

Water details test: test the drain pipe smooth situation, to ensure that the drainage is unobstructed and does not leak; drain pipe diameter of 50mm, squatting toilet and toilet drain pipe diameter 110mm.

Circuit details test: circuit switch should be in the 1.2m - 1.3m between height position from the ground, the switch should be in the 1.2m - 1.3m between height position. 1.3m between the height of the position, ordinary sockets in the 100-350mm from the ground, if you do not reach this number, please contact the decoration team in time.