Villa mansion decoration construction steps, what is the specific construction process?

The villa mansion has a large space area, unlike the general small house decoration, the decoration process is more complex. Whether it is the preliminary design program or construction steps, there are many places that need attention.

A, pre-design planning

Decoration design overall planning. Villa available space, the overall planning or need to start from the living habits, to make the best use of things. Villa space is mainly composed of leisure space, bedroom space, transition space, housework space combination, according to different floors for reasonable planning, such as elders room can generally be arranged on the first floor, the master bedroom and children's room can be arranged on the second floor. The appearance of the villa design determines the home to bring their own visual experience, while the planning of the villa space determines the living experience, the appearance of the design + living experience need to be combined to maximize the role.

Two, mid-construction stage

1, villa decoration steps - construction site protection. After selecting the work period, enter the villa site on the doors, windows, stairs, guardrails and other areas using professional protective film to protect.

2, villa decoration steps - the main demolition. Demolition or new masonry or remodeling part of the wall.

3, villa decoration steps - color sampling. According to the decoration design drawings will be water and electricity, furniture, decoration and other parts of the use of different colors for painting line marking.

4, villa decoration steps - water and electricity transformation. The transformation and installation of water and electricity lines, the steps of the transformation are: water and electricity lines grooving, water pipe installation, waterproofing works, wire line wiring. Wire line installation is divided into bright line and dark line, dark line buried inside the wall, bright line close to the surface of the wall.

5, villa decoration steps - wall and floor works. Wall works include wall leveling, scraping putty, sanding, latex paint and other wall grass-roots treatment. Ground engineering: ground leveling, waterproofing project.

6, villa decoration steps - carpentry works. Mainly includes the ceiling keel, door sets grass-roots level, shoe cabinets closet, as well as the TV wall, sofa wall production.

7, villa decoration steps - mud and water works. Including living room, bathroom, bedroom, kitchen and balcony wall tiles floor tiles, and bathroom backfill waterproofing project.

8, villa decoration steps - paint project. Villa wall and roof painting project, as well as shoe closet cabinet surface painting project.

Three, after the installation stage

Product installation includes: doors, windows, sanitary ware hardware, lamps, large and small home appliances installation, as well as furniture accessories into the installation. After the installation of products for the villa system operation debugging, water and electricity and smart home system for a full range of checks, tests and adjustments, in accordance with certain standards for acceptance, to prevent problems in the future.