Traditional Culture Encyclopedia - Traditional festivals - Valuation mode of construction budget cost
Valuation mode of construction budget cost
This topic mainly investigates the pricing model of construction drawing budget expenses. According to the different calculation methods and management methods of budget expenses, the construction drawing budget can be divided into two pricing modes, namely the traditional pricing mode and the bill of quantities pricing mode.
Traditional pricing model
The traditional pricing model in China is a model of pricing the project cost by using the quota and charging standards uniformly stipulated by the state, departments or regions, which is also commonly called quota pricing model. That is, quantity unit price method.
Valuation mode of bill of quantities
The unit price method of bill of quantities is a method to calculate the project cost in the form of comprehensive unit price according to the unified national engineering quantity calculation rules.
Item AB is correct.
To sum up, item AB is correct and item CDE is wrong.
- Related articles
- Please talk about the basic ways and measures to eliminate poverty according to the national conditions.
- What color wallpaper does the living room look good?
- What are the customs in Xinhui, Jiangmen, Guangdong?
- Mile top ten gourmet snacks
- Why does traditional Chinese culture have strong continuity?
- The difference between telecom and website manuscripts
- How should I return the red envelopes I received during the Spring Festival?
- Baotou is suitable for what flowers, city flowers and city trees are
- The Dragon Boat Festival hanging wormwood from the legend of the Daquan
- How big can traditional goldfish grow?