Introduction to the model contract of wrought iron stair handrail

No matter in what field, we will encounter the problem of filling in the contract, which can help us sort out the situation in advance and prevent disputes caused by shielding problems in the later stage, so it is necessary. However, if you have no experience in filling out contracts, you will get twice the result with half the effort. For example, the example of today's wrought iron stair handrail contract is a description of the problems that need attention in the design and installation of wrought iron stair handrail, which needs to be understood by the owner or the construction team.

Introduction to the model contract of wrought iron stair handrail

Owner? (hereinafter referred to as Party A):? Tel:-

Construction Team (hereinafter referred to as Party B): Tel:-

In the spirit of friendly cooperation, Party A and Party B sign the following contract on the basis of equality and fairness in accordance with the Contract Law and other relevant laws.

I. Overview of the Project

Project address:-

Second, the price

Clearance fee:-,in words:-

In ...

Plumber- Yuan dynasty (1206- 1368)

Wood? Works-Yuan Dynasty (1206- 1368)

Watt? Works-Yuan Dynasty (1206- 1368)

Painter-? Yuan dynasty (1206- 1368)

Garbage clearance fee-yuan

Three. terms of payment

1. On the first day of the construction team's entry, living expenses in advance:-yuan.

2, carpentry completed, salary yuan.

3, bricklayer completed, salary yuan.

4, the project is completed, pay yuan.

5. The warranty fee is 100 yuan, which will be paid after 10 months from the date of completion.

Fourth, design.

1. If Party A has drawings, it shall provide Party B with a set of drawings and be responsible for disclosure.

2. If Party A has no drawings, it shall explain the requirements to Party B, and Party B shall draw a sketch for Party A's approval before construction.

Verb (abbreviation of verb) material

1. Party B shall provide Party A with a list of materials to be purchased three days in advance, and Party A shall timely purchase materials for the use of the construction team within four days, and both parties shall bear their respective responsibilities for the construction delay and economic losses caused thereby.

2. Without the consent of Party A, Party B shall not purchase materials by itself. If it has been purchased, Party A has the right to unconditionally refuse to use the materials and refuse to pay the materials.

3. Party B shall purchase materials at the building materials supply point designated by Party A and issue a formal invoice.

4. Party B shall check and accept the quality of building materials purchased by Party A, and raise quality problems with Party A in time, and have the right to refuse to use them. If Party A insists on using it, it shall request Party B in writing and bear the losses caused by the quality of the materials.

5. Party B shall assist Party A to receive the goods and check the accuracy of the quantity and accessories.

6. Party B shall properly keep the materials and prohibit other personnel from entering the site.

7. Party B shall ensure that there are no double-package and semi-package projects in this community.

8. Party B shall protect the finished products after construction.

9. Without Party A's permission, Party B shall not take any building materials out of the house. If such a phenomenon is found, it will be deducted from the labor cost by doubling the material price.

Sixth, the construction period

Year-month-day to year-month-day construction period. If the construction period is delayed due to Party A's factors, Party A may deduct Party B's labor cost of 50 yuan/day.

Seven, material processing

Party A's materials are delivered to the downstairs where the project is located, and any construction personnel of Party B shall carry them unconditionally.

Eight, garbage removal

1, garbage bagging

The garbage should be cleaned up every day.

3. The garbage shall be transported by Party B to the garbage dump designated by the property.

Nine,? Labor force management

1、? Party B shall provide Party A with copies of the identity certificates of all construction personnel before the commencement of construction.

2、? Without Party A's permission, off-site construction personnel shall not spend the night at the site.

3、? Party A shall handle the community access certificate for Party B in time and pay the relevant fees.

4、? Party B's temporary residence permit in Zhenjiang is complete, and relevant losses caused by incomplete documents shall be borne by Party B. ..

5、? Party B designates-? As the person in charge of the construction site,-be the alternate leader.

6、? Within the contract price range, Party B shall provide? -Person-times follow Party A's material selection.

7、? Without the consent of Party A, Party B shall not change the construction personnel at will, and must keep more than 2 (1) construction personnel on site every day.

8、? Without the consent of Party A, Party B shall not stop work or stop work under any circumstances.

X. Construction machinery and tools

1、? Party B shall bring its own tools needed for construction, and ensure the safety and good usability of the tools, and the maintenance expenses of the tools shall be borne by Party B..

2、? Consumables (such as drills, saw blades, etc.). The expenses incurred by the tools shall be borne by Party A and Party B respectively, purchased by Party A and settled after the project is completed.

XI. On-site management

1、? It is forbidden to use open flames on site.

2、? Smoking is prohibited on site.

3、? Paint materials must be placed separately from other materials.

Twelve. maintain

1、? Party B shall repair the quality problems caused by Party B's construction free of charge within two years.

2、? For general maintenance, Party B shall carry out maintenance in time within three days after Party A notifies Party B, and in special cases (water and electricity problems), Party B must arrive and carry out maintenance within 24 hours.

3、? If Party B fails to complete the maintenance in time as stipulated in the contract, Party A can arrange other construction teams to carry out the maintenance work, and the labor costs incurred will be deducted from the warranty fund.

Thirteen. Annex to the contract

1、? List of construction projects.

2、? A mutually acceptable quotation.

3、? List of materials purchased by Party B ..

Fourteen dispute over a contract

1、? In case of any dispute, Party A and Party B shall first settle it through consultation.

2、? If negotiation fails, a lawsuit can be brought to the court where the dispute is located.

XI. On-site management

1、? It is forbidden to use open flames on site.

2、? Smoking is prohibited on site.

3、? Paint materials must be placed separately from other materials.

Twelve. maintain

1、? Party B shall repair the quality problems caused by Party B's construction free of charge within two years.

2、? For general maintenance, Party B shall carry out maintenance in time within three days after Party A notifies Party B, and in special cases (water and electricity problems), Party B must arrive and carry out maintenance within 24 hours.

3、? If Party B fails to complete the maintenance in time as stipulated in the contract, Party A can arrange other construction teams to carry out the maintenance work, and the labor costs incurred will be deducted from the warranty fund.

Thirteen. Annex to the contract

1、? List of construction projects.

2、? A mutually acceptable quotation.

3、? List of materials purchased by Party B ..

Fourteen dispute over a contract

1、? In case of any dispute, Party A and Party B shall first settle it through consultation.

2、? If negotiation fails, a lawsuit can be brought to the court where the dispute is located.

Considering that most of our friends have no experience in contracting wrought iron stair handrails, and there is no way to write contracts and other documents, we have analyzed the normative texts for reference. It includes all aspects, such as site management, material procurement, deadline and material handling. For the owner, through the above research, we can prevent the later losses and ensure the expected results.