Traditional Culture Encyclopedia - Traditional festivals - Introduction of cement pole upright
Introduction of cement pole upright
♂? Artificial polarization
Manual poling requires three steps: preparation stage, poling process and straight and horizontal line correction. During the operation, it is necessary to pay attention to the consistency of the shoulder of the pole vaulter, the tension of the swinging rope, and the correction of the straight line and horizontal line of the pole.
Flat grid method
The grid method needs three steps: preparing auxiliary rods, setting rope nets and connecting tie rods. In the process of operation, attention should be paid to the length and thickness of the auxiliary pole, the setting of the rope net and the method of pulling the rope to erect the pole.
Tripod direct legislation
There are three steps in tripod vertical legislation: preparation stage, erection process and matters needing attention. Attention should be paid to the selection and installation of Chinese fir poles, the use of winches and the hanging position of poles.
- Related articles
- Huguo Temple Snacks Price List 2023
- What does the internet term depth charge mean?
- Which category does the registered trademark of chemical supply system belong to?
- What musicals do you have to watch?
- Brief introduction of Beitang fishing village in Tanggu
- How do you play the technique of the Japanese Character Chain Punch in Wing Chun? Detailed, relevant drops are sent over, thank you, want to learn!
- Why do young people like traditional culture?
- What does the traditional "six arts" in China mean?
- What schools are there in Nanchang Technical Secondary School?
- Authentic Chaoshan Longjiang braised trotters technology; How to cook pork knuckle rice in Longjiang