Traditional Culture Encyclopedia - Traditional festivals - Simple coat rack installation video tutorial

Simple coat rack installation video tutorial

Video tutorial

as follows:

1, the installation of the hand shaker:

The hand shaker is generally installed on the right side of the balcony, because the right hand is the most convenient, the distance from the ground is generally 120 cm, specifically by the user's height decision. Note that the hand shaker is fixed with expansion screws.

2, the installation of the top seat:

In the installation of the balcony top, with a steel ruler to measure the diameter of the balcony top lighting, and then mark the lamp between the two sides of the 15 to 30 cm. Then measure the distance between the edge of the balcony and the mark to determine the width of the top base installation. Then measure the length of the balcony, with the light as the center, according to the length of the drying rod to determine the light on both sides of the flat 80 to 100 centimeters, and the width of the measurement of the distance between the four intersections, the intersection is the top seat of the coat rack installation position. Then drill holes with an electric drill, after drilling the holes with expansion screws to fix the 4 top seat.

Note: The 2 tops by the corner of the rocker are the movable ends. The other 2 top seats are fixed seats, two wheels of the movable seat, and the movable seat must be installed in the front.

3, the installation of the corner:

Corner can be installed on the top of the wall or the top of the balcony, the corner of the distance from the activity of the top seat of 50 to 70 centimeters, in the middle of the activity of the top seat must be into a triangle, the corner and the rocker installation position to maintain the same vertical line.

4, steel wire connection:

There are 2 steel wires in one set of drying rack, first of all, put one end of steel wire through the corner bearing steel wire groove, through the movable wheel bearing steel wire groove of the movable top seat, and then through the bearing steel wire groove of the fixed end of top seat, so as to make the steel wire and the ground keep vertical, and then put the top cover from the steel wire set in, and stuck the top seat cover well. The other end of the wire through the corner of the bearing wire groove another hole, and then through the other movable wheel bearing wire groove, pay attention to make the wire and the ground to maintain vertical, and then from the wire into the top cover, snap the top seat cover. Another wire installation method is the same.

5, drying rod drying connection:

In the head end of each steel wire, through the hanging ball, in the hanging ball knot; then pull the hanging ball, until the top of the top seat so far, from the corner of the steel wire, into a double-stranded steel wire, card at the end of the hand crank; relax the steel wire in the hand crank, the hanging ball down, the drying rod through the hanging ball, then next to the holes in the hanging ball at the tightening fixed, nailed the screws; and finally at the end of the drying rod to install the plugs Then screw the holes in the ball and nail the screws; finally, install the plugs on both ends of the drying rod.