Traditional Culture Encyclopedia - Traditional festivals - How to install a large chandelier

How to install a large chandelier

The installation of chandeliers is generally divided into three large process steps: materials and tools to prepare, boom, sling and structural layer of the connection, boom, sling and shelves, light box connection. Step 1, materials and tools to prepare 1, materials: in the installation of large combinations of chandeliers to prepare the support component materials, decorative component materials, other accessories materials. (1), support component materials: wood (different specifications of the water square, wood, water board), aluminum alloy (plates, profiles), steel (profiles, flat steel, steel plate); 2), decorative component materials: copper, external decorative veneer and heat dissipation plate, plastic, plexiglass panels, glass as a spacer; (3), other accessory materials: such as screws, nails, rivets, finished lamps and lanterns, adhesive and so on. 2, tools: construction tools is in the chandelier installation process need to use such as pliers, electric jigsaw, screwdriver, ruler, hammer, hammer, hand according to the paintbrush and so on. Step 2, the boom and sling and structural layer connection 1, the specific connection method: in the process of connecting the buried parts and transition parts of the connection is the focus. (1), first in the structural layer of pre-buried iron or wood bricks (except water brick load-bearing); 2), in the pre-buried iron or wood bricks on the installation of transition connectors; 3), will be the boom, sling and transition connectors. 2, installation precautions - installation of the four principles 1), in the structural layer of pre-buried iron or wood brick, buried position should be accurate, and leave enough room for adjustment; 2), the installation of such as more than one chandelier, should pay attention to their location, length of the relationship between the chandelier, so that it can be effective in saving time and manpower, in the installation of the chandelier will be installed at the same time. Installation is good, if there is an error, you can easily adjust the position of the chandelier. (3), the boom out of the ceiling shall be surface although there are direct out of the method and add casing two methods to choose from, but the use of casing method is more, because the casing method is more conducive to the installation of the chandelier can be guaranteed that the ceiling panels intact, only in the need to exit the pipe can be located in the position of the drilling. And direct hair in the opening of the hole to find the correct position of the relative difficulty, is very likely to cause great impact on the ceiling ceiling, affecting the overall aesthetics. (4), the best way to retain the best way to adjust the height when fixing the suspension rod of the chandelier, it is best to retain a certain length of the thread, easy to adjust. When suspending the light box, carefully check whether the connection is reliable. Step 3, the boom or sling and shelves, light box connection This is the last step in the installation of chandeliers, the boom or sling fixed in the shelves, and then connected to the light box below, check whether it is secure, to confirm the safety of the installation is complete. The above steps are the general method of installing large ceiling light fixtures or large chandeliers or large combination chandeliers. Do a good job before the installation of materials and tools to prepare for the installation of each step to do meticulous, in order to effectively complete the installation work, and can be used with confidence. The above is X group decoration network for you to provide lighting decoration knowledge, I hope to help you.