Engineering construction supervision procedures and methods?
Engineering Construction Supervision Procedures Method 2
For the supervision industry's current situation, most supervisors are changing careers, the initial supervision staff, often due to groping to carry out the work, it is not inevitable that there will be a chaotic control of the procedures, quality control loopholes, directly jeopardizing the credibility of the supervision of enterprises. It is also impossible to successfully complete the supervision work, for this reason, efforts to learn and explore the supervision work of scientific, systematic, standardized is the supervisory staff work the way to go, and in writing, as a supervisory work based on a kind of systematization, should be beneficial to the smooth running of the supervision work.
I. Supervision basis:
Supervisors must be clear about the following supervision basis, according to the supervision basis for supervision work.
Construction phase supervision based on:
1. the current relevant construction laws and regulations.
2. Tianjin local standards and regulations.
3. Current national construction quality acceptance norms and regulations.
4. Supervision specifications.
5. Local supervision regulations, documents.
6. Design documents and related standard catalogs.
7. Engineering contract.
8. Commissioning supervision contract.
9. Supervision planning, supervision and implementation details.
10. Approved construction organization design.
11. Each responsible party prepared by the enterprise standard:
Supervisors must be clear supervision basis, and skillful and master, in the supervision work implementation and implementation.
II. Construction stage supervision of the general procedures:
Supervisors in the full range of engineering supervision work before the project should be more systematic and repeatedly smooth the overall work of the project procedures to do according to the different phases, clear supervision of the measures taken, what to do the work, targeted pre-emptive control, supervision of the work carried out in order to be able to get the job done, in order to reflect the supervision of the organization's high intelligence, the work in order to show enough strength.
Three. Overall work procedures:
Supervision of the composition of the agency and into the field→pre-control and preparatory work before the commencement of construction→approval of the application for the commencement of construction→positioning and placement→foundation work→foundation work→main body of work→decorative works→unit work pre-acceptance→unit work acceptance and engineering records→supervision of the collection of data summary, archiving and transfer of supervisory information →supervision summary of the work→supervision work at the stage of engineering and warranty work.
Four. Preparatory work before the start of construction:
I. Preparatory work before the start of supervision workflow:
Determine the project superintendent engineer and authorization → the composition of the supervisory body and into the field → to participate in the first construction site meeting organized by the construction unit and supervision of the briefing → to understand and clarify the content of the contract and the scope of supervision → familiar with the construction drawings → to participate in the design of the briefing → according to the relevant information and documents, the supervision of the basis for the preparation of the supervision of the planning → the preparation of the supervision of the implementation of the rules of the various professional supervision → Review the construction organization design and special technical program → review the qualification of the project management body and in place → review the qualification of the subcontracting unit and commissioned laboratory qualification → review of measuring instruments → review of measuring instruments and equipment → positioning inspection and technical review → approval of the large-scale equipment into the field → review of the situation of the people, machines and materials into the field → approval of the application for the commencement of work.
II. Pre-construction supervision bodies and supervisors should do the following work:
1. Determine the project director candidates, with a power of attorney, the composition of the project supervision body reasonably equipped with professional supervision, supervisors, data to ensure that the work of professional support, and as far as possible to ensure that the supervision of the relative stability of the agency personnel, personnel replacement, additions and deletions should be implemented the necessary means of approval and to do a good job of each other, so that the supervision of work Reliable connection. A director is responsible for more than two projects should be set up on behalf of the director, and authorized by the director.
2. Construction unit to organize the first meeting of the site:
①. Construction unit to organize the first site meeting, the project supervision department of all supervisors should participate.
The first site meeting shall be attended by at least the following persons:
1. On-site representatives of the construction unit and relevant functional staff of the Engineering Department.
(2). Contracting unit project manager and quality inspection, information, materials, safety, technology and other functional personnel.
(3). Subcontracting unit principals.
②. The first site meeting shall include the following:
1. The head of the construction unit announces the authorization of the project superintendent engineer.
(2). The head of the construction unit announces the project manager of the contracting unit.
(3). Each party introduces to each other the personnel of the organization and its professional and job division.
(4). The construction unit introduces the preliminary work.
(5). The project manager reports on the preparation of the construction site.
6. The representative of the construction unit on the site, the project superintendent and engineer make comments or requirements on the construction preparation.
(7). The parties to the meeting consult to determine the time, period, location, main participants in the meeting and the main deliberator of the regular supervision meeting.
③. After the first site meeting, the project supervision department is responsible for organizing, compiling and printing the minutes of the meeting with the parties to the meeting signed and distributed to the parties concerned.
3. Supervision submission:
Supervision submission refers to the supervision body after the construction supervision contract content and related supervision powers and obligations, supervision work, supervision and management of coordination of the basic procedures, quality control supervision methods and measures, about a variety of audits, inspection requirements, project data management, etc. Formation of printed documents in the first site meeting in a timely manner by the superintendent of the organization and presided over the meeting. And presided over by the director in a timely manner after the first site meeting, in the form of a meeting for submission, supervision submission is not a technical submission, is a management performance of the submission documents.
After the supervision of the submission, the supervision document should be signed by the project manager and the construction unit to live on-site representative, and distributed to all parties, as the supervision of the work based on the implementation.
Supervision submission documents, on-site professional supervisors should be manually a copy of the first supervisory staff must be implemented.
Supervision of the meeting can be taken in the form of contact sheets to notify the relevant personnel to attend the meeting in a timely manner.
The following people must attend the meeting:
(1). Contracting unit project manager, foreman, quality officer, material officer, data officer, safety officer and so on.
(2). The main person in charge of the subcontracting unit.
3. Professional supervisors of the project supervision department.
(4). The representative of the construction unit on site shall be notified in advance to attend the supervision delivery meeting.
Supervision handover meeting, is a key meeting, its main purpose is to allow all parties to fully understand the supervision of how to carry out the work, how to carry out quality control and as a notice, but also a mutual coordination. Must be in accordance with the supervision specification and Tianjin local regulations, open a good supervision of the meeting.
4. Construction drawings review and design submission:
①Project construction supervision procedures and methods 2 Summary: Supervisors in the full range of engineering supervision work before the project should be more systematic to smooth the overall project work procedures, to do according to the different phases of the clear supervision of the measures taken to do what the work
Source of the contract model. After entering the site should be timely construction units to provide design documents, geological survey report, supervision and review should be based on mandatory standards as a guide.
②. Project supervision personnel must be seriously familiar with the drawings, supervision must have the ability to read the drawings, and the familiarization and review of the drawings before the start of construction as an important supervision work to be completed, recognizing the importance of this basis for supervision, only this basis for familiarity and mastery, and any other basis for the implementation of the sequential preparation of a feasible basis of supervision, supervision of the whole process of guiding the supervision of the work.
③. Familiarize yourself with the map should focus on reviewing the following:
Reduce the construction process at any time to find design errors, mistakes or mistakes, affecting the construction and quality of the project.
1. Understand the basic overview of engineering design and the characteristics of the project, and clarify the category and level of construction works.
(2). According to the design of the relevant mandatory provisions, review for non-conformity.
3. Accounting for the construction and construction of the labeling of the size must be consistent, found that does not meet the record.
(4). Review the professional equipment and apparatus installation, hole reservation and civil engineering mutual disturbance, overlap problems and affect the structural safety or use function, safety function.
(5). Examine whether there may be any special difficulties in construction.
6. Review for design differences, etc.
Familiarize yourself with the process of reviewing the drawings must be found to make a record of the problem.
4. Project supervision personnel should participate in the design of the construction unit organized by the design brief, and is responsible for supervising the construction unit to make a good record of the design brief, signed by the parties concerned, as the basis for supervision.
More about the engineering/service/procurement category of the tender writing production, to enhance the winning rate, you can click on the bottom of the official website customer service free consultation:/#/?source=bdzd
- Previous article:What about Wuxi Jieaite Logistics Equipment Co., Ltd.?
- Next article:How can you find the customer source of the loan demand
- Related articles
- Innovation of Medical Insurance System in China
- What is the pre-warehouse e-commerce system?
- The world's largest soft-shelled turtle to date
- Weishan county traditional crucian carp fishing field
- What is Shenyang's most famous
- What are the characteristics of the Irish? Which celebrities are of Irish origin?
- What is hot pot?
- What festivals do Tujia people have?
- Tsinghua University 109th Anniversary Celebration (Building on Strengths, Innovating for the Future)
- As far as law major is concerned, which is better, northwest university of politics and law or Southwest University of Political Science and Law?