Traditional Culture Encyclopedia - Traditional stories - Repair method of building roof leakage
Repair method of building roof leakage
Repair the waterproof layer according to the conventional method. If there are tiles on the building surface, pry open the tiles or floor tiles first, then dig the waterproof layer, make a new waterproof layer, and then lay a new floor tile. Such a construction project usually takes a week.
2. The latest trapping method
The traditional idea of building leakage repair is to repair the leakage place. The latest waterproof and leak-proof method is to abandon this traditional concept, waterproof and leak-proof, and do a good job of waterproof and leak-proof outside ceramic tiles. As long as the surface of the tile outside is waterproof, the waterproof effect is similar.
Water leakage in the top floor is very common, and there are many reasons for this phenomenon. Such as unreasonable structure or long construction time. However, if the leaking point occurs in the kitchen and bathroom, the first thing to do is to check the leaking point, conduct a water-closing experiment, find the leaking point and then re-waterproof. But if it's not a leak in the kitchen and bathroom, it's probably a problem in the pipeline.
- Related articles
- What you need to learn about e-commerce
- Kung pao chicken is a common dish. Do you know what "Gong Bao" means?
- Is there any way to extend the linear distance of slingshot trajectory?
- On the difference between ordinary telephone and IP telephone
- Domineering pot-stewed name
- Car amplifier wiring diagram
- Walking Taibai Road (prose)
- Fujian opera, come on! ! !
- What kind of fish is koi fish? What is the origin?
- How many classical gardens are there in China? What are they and what is their history?