3 Model clauses of excavator lease contract
Model text of excavator lease contract 1
Lessor: (hereinafter referred to as Party A)
Lessee: (hereinafter referred to as Party B)
Today, Party A has a Yuchai 135 excavator for Party B's use. Based on the principle of friendly cooperation and mutual benefit, the following terms are reached through consultation between both parties:
1. Lease method: monthly oil, monthly settlement of 25,000 yuan, once a month, and lump sum payment after the project is completed. Payment method: and so on. If Party B fails to pay Party A's rent on time, Party A has the right to stop working, and all losses shall be borne by Party B. ..
2. Working time: from 20_ years to 20_ years.
3. Party B is responsible for the accommodation of Party A's personnel, and the repair cost of the excavator shall be borne by Party B during the lease period ... Party B shall take full care of the excavator from the time it leaves the trailer, and Party B shall be responsible for any theft or other losses caused by improper custody of Party B. ..
4. When Party A's machinery enters Party B's construction site, Party A's mechanical personnel must obey the command and arrangement of Party B's management personnel under safe conditions. Party B is responsible for all aspects of coordination and safety work. In case of abnormal construction or accident during construction, Party B shall take full responsibility for all losses caused thereby.
5. If Party B's funds are not available, Party A has the right to stop work. The losses caused thereby shall be borne by Party B, and the rent shall be calculated accordingly. Party B shall not use the excavator and its staff for other purposes. If necessary, Party A's consent shall be obtained. ..
Intransitive verbs Matters not covered in this contract shall be settled by both parties through negotiation.
7. This agreement is made in duplicate, one for each party, and it has the same legal effect without notarization, and it will take effect after being signed.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model text 2 of excavator lease contract
Party A: ID number:
Party B: ID number:
Party A rents a XCMG 60 excavator from Party B in the workplace, and through friendly negotiation, Party A and Party B reach the following agreement:
1. The tentative lease term of this car is.
2. The monthly rent of the car is RMB sixteen thousand Yuan only (RMB 65,438+06,000.00 Yuan only), and the monthly working hours are 240 hours. If it exceeds 240 hours, it shall be paid to Party B at the rate of RMB one hundred Yuan only (RMB 65,438+000 Yuan only) per hour, and all fuel costs shall be borne by Party A. If Party A fails to pay the rent on time every month, Party B has the right to stop the excavation at any time.
3. Party B shall guarantee the normal use of the excavator by Party A during the lease period. If there is a problem with the excavator, Party B shall be responsible for the maintenance, and the maintenance time shall not exceed 48 hours. If it exceeds 48 hours, Party A will deduct the rent on a monthly basis.
4. If Party B has nothing to do with the shutdown caused by Party A, it will give Party B a lot of rent every month, excluding the Spring Festival holiday.
Verb (the abbreviation of verb) is a security problem. If a safety accident is caused by Party A, Party A shall be responsible for it; If Party B fails to obey the instructions of Party A's staff, Party B shall be responsible for any safety accident.
6. Party A is responsible for the access safety of excavators.
7. Party A shall provide accommodation for Party B's driver. In order to ensure the driver's normal life and personal safety, the driver of Party B must obey the command of Party A (except for dangerous operations).
Eight, in the process of operation, all safety accidents and economic losses caused by improper command of Party A shall be borne by Party A.. ..
9. Party A shall not sublet the excavator to others for various reasons.
X. Settlement method: the settlement shall be made at the end of each month, and the next month shall not exceed the 5th day of each month. If the time limit is exceeded, Party B has the right to stop the excavator and drive away at any time.
XI。 This contract is made in duplicate and shall come into effect after being signed (sealed) by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model excavator lease contract 3
Party A (Lessee): Model:
Party B (operator): Leased place:
In order to ensure the normal operation of the excavator during the leasing process, both parties reached an agreement on matters related to excavator leasing and signed this contract.
I. Rights and obligations of Party A
The diesel consumption of the excavator, the accommodation of random personnel and the storage of equipment shall be borne by Party A..
2. Party A shall provide operation tasks and carry out corresponding blasting on the rock part. Hard operation is strictly prohibited.
3. Party A is responsible for the overall management of excavator operation and making a reasonable construction plan.
Two. Rights and obligations of Party B
L, provide an excavator and a staff to ensure the normal condition of the car. Mechanical failure, the monthly maintenance time shall not exceed three days. If it exceeds Party A, Party B's actual lost time rent can be deducted according to the rent proportional coefficient (it will not be deducted when the monthly working hours are reached).
2. Party B shall be responsible for the maintenance parts and fuel costs of the excavator, as well as the travel expenses on business trip.
3. Party B shall obey the reasonable arrangement of Party A, be truly safe and efficient, and be responsible for the safety responsibility caused by itself in the construction process.
Three. Provisions on operating time during the lease term:
The monthly rental working hours are hours. If Party B's working hours are less than hours due to Party A's reasons or no homework tasks, Party B's rent will remain unchanged. If the working hours exceed hours, Party A will pay overtime to Party B at the rate of RMB per hour. The timing method is digging computer timing, and the completion list is issued on the due date of each month.
Four, the provisions of the admission fee
If Party A rents Party B's excavator for less than 2 months, the entrance fee shall be borne by Party A, and the two-month entrance fee shall be paid by both parties.
Verb (abbreviation of verb) rent standard
The purpose of this contract is monthly rent, that is, the basic rental fee for excavators is RMB yuan per month (30 days), and overtime pay is added (Party B does not provide tax stamps).
Payment of rental fee for intransitive verbs
The excavator shall pay the monthly rent in one lump sum after the monthly lease time reaches 25 days from the date of entering the site.
Seven, safety responsibility and equipment storage
1. Party A must provide a safe construction environment and command the construction correctly. If Party B feels that the construction environment is too harsh, the work is too difficult and the operation is unsafe, it can stop the construction and wait for the unsafe factors to be eliminated. If Party A forcibly carries out construction, resulting in casualties of equipment and personnel, Party A shall bear all the compensation.
2. Party A shall be responsible for equipment damage and casualties caused by accidents that are not foreseeable in advance by both parties.
3. It is the responsibility of Party B's excavator, and Party B shall bear the responsibility for equipment loss and casualties.
4. The responsible personnel of Party B must obey the arrangement, actively cooperate with the command of the responsible personnel of Party A, complete the daily work with high quality and efficiency, and abide by the operation time and rules and regulations of Party A. ..
5. During the lease period, if the excavator is stolen or damaged, Party A shall be responsible for compensation.
Eight. To sum up, Party A and Party B shall abide by it together to ensure the normal construction. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature, each copy having the same legal effect.
Attachment: The starting date of excavator lease is:
The starting time of computer work for excavator entry is:
The table index of diesel fuel tank is:
Party A: Party B:
Address: Address:
Tel: Tel:
ID number: ID number: MM DD YY
Three articles related to excavator lease contract model;
★ 3 model excavator lease contracts in 2020.
★ Model text of excavator lease contract 3 Latest 2020
★ The latest excavator lease contract in 2020 has three model clauses.
★ Three demonstration clauses of the lease contract for simple excavators are the latest.
★ The mechanical lease contract of excavator is simple 3 pieces.
★ Model text of excavator machinery lease contract 3 Latest 2020
★ Three demonstration clauses in the simplified version of the latest excavator lease contract.
★ The latest model of the lease contract for site excavators.
★ The latest 2020 model essay on the contract for leasing excavators.
★ 3 The model clauses of the lease contract for small excavators are the latest.
- Previous article:Pictures of business offices-What are the common office decoration styles?
- Next article:Traditional men's famous brand watches
- Related articles
- In rural tourism e-commerce, by what means will the traditional customs of specific regions or specific ethnic groups be protected as resources?
- How many national colors are there in Fang?
- How does a pyramid scheme usually pull people in? What are the methods?
- The Preface to the Tengwang Pavilion full text and its translation
- Foam insulation board price examples Manufacturer information
- Shadow play is a traditional folk art form in China.
- Decorative effect of pencil decorative painting
- What are the local folk customs?
- How to build books manually
- Ten ways to become a principal