Traditional Culture Encyclopedia - Traditional stories - Difference between main building operator of mixing station and central control in cement plant
Difference between main building operator of mixing station and central control in cement plant
The operating equipment and production process are different.
1. The operators in the main building of the mixing station are mainly responsible for controlling and monitoring the equipment in the concrete mixing process, such as mixers, measuring instruments, conveyor belts, etc. , to ensure that the concrete is mixed according to the required proportion and technological process.
2. The work of the central control operator in the cement plant involves a complex integrated automation equipment control system, including raw material feeding hopper, preheater, air cooler, clinker cooler, cement mill and other equipment, and at the same time needs to master various laboratory analytical instruments and computer software operation.
- Previous article:What are the implications and traditions of the long summer solar terms?
- Next article:What are the lyrics of patriotic theme?
- Related articles
- Feedback oil and gas industry technology and multi-domain collaboration
- Comments on Yinxian Mountain Villa in Licheng, Dongguan
- Discuss the similarities and differences between the development of science and technology in ancient China and ancient Greece and its revelation (not less than 1200 words), warriors help, urgent ah,
- What are the customs of Halloween?
- Animal protection organizations oppose dog meat practitioners. What do you think will happen if South Korea protests against eating dog meat?
- Top Ten Sichuan Cuisine Restaurants in Zhengzhou (Zhengzhou ranks first)
- The practice of wrapping beans in steamed bread
- Who knows what a CIMC container in Taicang is like?
- Teacher ethics elementary school teacher speeches
- Comparative culture. What ways do Europeans and English-speaking cultures greet and introduce their cultures in business situations?