Calculation method of hydropower reconstruction project cost

Hydropower transformation is a concealed project, and the calculation method of project cost is as follows.

Calculated by square area

Generally, the water and electricity on the market are calculated at 35-45 yuan per square meter (if the price is a little more complicated), and the displacement and displacement are calculated at 35 yuan per square meter.

♂? Contract by project

The whole package also includes half package. All-inclusive means that all materials and manpower are borne by the decoration company. Half-package means that the main materials, including floors, floor tiles and electrical appliances, are purchased by the owners themselves. Whether it is all-inclusive or half-inclusive, remember to choose a company with a big brand, and the quality is guaranteed.

According to the actual length

20 yuan per meter is calculated according to the length of electric conduit, and 25 per meter is calculated according to the actual length of upper and lower water pipes.

Calculated according to actual working days.

According to 300 yuan/man-day, according to the actual installation man-day * man-day unit price = labor cost.

Matters needing attention in acceptance

At the end of this construction, on-site acceptance should be carried out, and attention should be paid to the cost of hydropower materials and the quality of products.