Traditional Culture Encyclopedia - Traditional stories - Intermediate job summary

Intermediate job summary

A period of time inadvertently has come to an end, during this time, I believe that we are facing many challenges, but also harvested a lot of growth, let's summarize and recorded in the work summary. I believe that many friends do not know how to write the beginning of the work summary, the following is my carefully organized on the intermediate title work summary (selected 6), welcome to read and collect.

Intermediate job title work summary 1

I was named assistant engineer in 20XX, to date has been 6 years. During this time I am mainly engaged in civil construction and glass curtain wall construction management, looking back on this six-year experience, I have participated in five projects, each project is a new exercise for me, is an accumulation of experience.

In July 20XX, I served as a construction worker in Gaomi Xinxin Home District. The project is a multi-storey brick structure group project, the total construction surface of 130,000 square meters, I am mainly involved in the preparation of the construction program and on-site construction management. During the construction process, I carefully read the specifications and design drawings, familiarize with the relevant technical standards, and really know what I am doing. These experiences have been a valuable reference for my future work.

In November 20XX, I served as a construction worker of Qingdao Free Trade Zone Logistics Center Project. In the construction, combined with the knowledge learned in the university, starting from the basic work, familiar with the drawings, do a good job of the construction program and the construction of the sub-construction of the technical briefing before the construction, in the construction process, strict requirements, will be the "three inspection" system in place. The construction of sub-projects are to do beforehand control, check.

In October 20XX, I served as the project manager of the Anhui Publishing Building curtain wall project, from here formally stepped into the road of project management. In the project I am fully responsible for the progress of the project, quality, safety, cost. Mainly in the following areas: according to the actual situation of the construction site for the preparation of the construction organization design, construction schedule, material plan preparation and supervision, construction quality and safety measures to ensure the development of supervision and general contracting units to carry out the drawing review, according to the site conditions for changes and visa confirmation, construction data collation and transfer to the archives, the completion of the project settlement data collation. Organize. In the two years of the project, my project management level has been greatly improved, especially in the design changes in this area of the visa has outstanding performance, the project *** counted about 6 million yuan to change the visa, for the company to gain about 10 million profit. In the entire construction process has been the owner, supervision, general contractors and the company's praise.

In August 20XX, I took up the position of project manager of Hangzhou Qiandao Lake Greentown Vacation Residence Project, and was fully responsible for the project. This project is a condominium hotel developed by Hangzhou Greentown Group Company, with high quality and tight schedule, and we have completed the task according to the schedule requirements of the Party A under the efforts of our project department **** with. According to the schedule requirements of the party, the project department in the construction organization and construction schedule scheduling up and down a lot of effort: first of all, we use segmented construction, the entire project is divided into five small parts, respectively, to arrange for the construction team at the same time for the construction; Secondly, we arrange for the construction team to carry out the construction of the flow construction, as far as possible to compression of the duration of the construction period; again, our project department and the company signed a dedicated agreement to meet the project's Thirdly, our project department and the company signed a special fund agreement to meet the project's funds to ensure the timely and smooth supply of materials. Finally, we gave the owner a satisfactory answer sheet, and successfully get the construction contract of the second phase of the project.

In December 20XX, I served as the project manager of Qingdao Survey and Mapping Research Institute production and research building curtain wall project. Here is mainly responsible for the content of: review of design drawings, material processing drawings and orders, construction team selection and construction management, construction organization design and construction progress plan preparation, data collation, safety management, design change data collation, project completion data collation.

In the above engineering construction process, in order to further improve their professional business level, I do a good job in addition to the current work, but also make use of all available time, combined with the work of practice and constantly strengthen the theoretical knowledge of learning, in addition to participating in the company's organization of the business training, but also the use of spare time to participate in the relevant knowledge lectures. Often and brother unit colleagues to communicate and discuss, visit Qingdao City, some representative of the project, not only increased the brother unit colleagues between the feelings, but also broaden their horizons.

In addition, I am dedicated to the study of professional and technical knowledge at the same time, but also strive to explore and study the computer software and hardware knowledge, Microsoft Office series office software and AutoCAD series software successfully applied to the daily management of construction in the continuous learning and practice, and strive to promote the paperless management of project management information, the application of Word to complete the work of word processing, printing All kinds of record forms and text materials, more electronic version of the document exchange; the application of Excel to complete the storage and analysis of engineering information processing, to provide quantitative basis for engineering decision-making; the application of PowerPoint to produce training electronic slides, the use of modern multimedia forms, vivid, lively explanation of construction technology knowledge and construction construction knowledge, completely changed the traditional

The way of education and training, so that high-tech, modern technical means to truly serve the production and quality management. Lead the project department comrades skilled use of AutoCAD computer-aided design and drafting software, and in the work of the application, both to improve their own professional level, so that the construction technicians completely get rid of the heavy burden of bulky drawing boards and pencil hand drawings, so that the project drawings have become exceptionally easy.

The above is a summary of the `major professional and technical work I have been engaged in since I joined the work. Through the combination of theory and practice, coupled with their own continuous summarization of experience, I have been able to competently perform their duties, better completion of the various tasks, while the unit leadership and colleagues of the affirmation of the future work, I want to continue to consolidate the provision of their own professional knowledge and technical and business level, and to build on the strengths and avoid the shortcomings of the further good work of the job.

In short, the work of seven years, the harvest is huge. As a production builder, I am proud of the construction projects I have made, that is, to make a contribution to society, but also to grow their own, so that they are in the technical and management aspects of maturity. But I will not be proud, because I still have a lot of shortcomings need to be improved, such as basic technical proficiency, high-tech insights, large-scale projects, such as the refined management of technology need me to work harder to meet new challenges.

Intermediate job summary 2

I participated in the work in September 20XX so far, has been working in the garden construction enterprises and garden supervision enterprises, as a garden construction technician, garden project site supervision. I treasure my work, no matter in which work position are diligent, hard work.

I know the importance of business technology. Only with solid business skills, in order to be based in the enterprise, the department, I am currently engaged in the work of continuous learning, adhere to the base of this post, study hard professional technology, and strive to improve business skills; actively study advanced scientific and cultural knowledge, and constantly progress, so that the theory is linked to the practical, in order to adapt to the needs of the increasingly developing cause.

Enthusiastically into the workplace, and actively learn from all colleagues to learn business skills, learn relevant business technology and related regulations. From familiarizing with the drawings, to the solution of specific problems are based on a serious and responsible attitude of caution.

Since joining the work, especially as an assistant project manager, his technical level and business capacity has been greatly improved and strengthened. In the work practice, I often realize that I learned in the school of professional theory is still relatively weak, therefore, I continue to strengthen the study, and humbly consult the professional expertise of engineers and scholars, do not miss every opportunity to learn and improve, so that their technical level and ability to continue to strengthen. I studied the gardening profession, into the Nanjing Landscape Architecture Engineering Supervision Co., Ltd. work, I was assigned to the Engineering Department, mainly engaged in garden engineering supervision work. At present, I am not only able to skillfully complete the site construction management of landscaping projects, but also skilled in completing the landscaping project pre-budgeting work and so on. Now I will take the current position since the professional and technical work summarized as follows.

First, the attitude is correct, rigorous science.

Engaged in landscaping work is a very difficult industry, sun and rain, is an outdoor operator, and the hot summer and continuous autumn rain, are to work tirelessly, we have been called high-grade farmers, to be able to suffer and eat bitter, the work of the rough with the fine, so there is no optimism and hard-working attitude and rigorous scientific spirit of work is not, although the landscape and landscaping talk about scientific research. Landscape and green talk about scientific research, but also to carefully scrutinize the drawings, measurements and set up a good green area, the genus said, "not even a tiny bit, lost a thousand miles."

Two, carefully scrutinize, carefully seek evidence.

Gardening work belongs to a kind of "sure, fine, fine" work, to make clear their own work area, landscape and greening to get detailed, superb. To do this, first of all, from the beginning of the review, before the start of work to do this step of the work, to understand the drawings show the green area with the site there is no consistency, planting plant species whether there are habitual problems, such as the design of shady plants in the sunny places, or on the contrary, but also pay attention to the design of the seedling specifications in the market can be found, or some of the loopholes in the design of the various drawings show the problem should be reflected in time to solve. Problems should be reflected in a timely manner to solve the problem, so that the work is handy, and again you can refer to other construction drawings, for example, planting large trees, you can refer to the elevation of the garden construction, which is conducive to the completion of planting tree elevation and later in line with the depth of the tree can be controlled to plant a large tree, as well as leveling the site of the creation of slopes, you can refer to the drainage of the distribution of wells to drainage wells to the distribution of the direction of drainage to determine the slope of the soil In favor of smooth drainage in the future of the green space, all each step is very critical, so we have to put "careful speculation, serious proof. The work attitude is always in mind.

Three, progressive.

Keeping up with the times in the work of the most valuable asset is not more than continuous learning, enterprising, summing up experience, summarize the experience belongs to their own, in the work of more than eight years, in addition to my work in the work of continuous enterprising, learning, innovation, and constantly improve the occupation, knowledge and operating skills, but also participated in a variety of training courses, learning classes, such as: cad, 3 d. Photoshop, costing, Photoshop, costing and so on. With the progress of society, the development of the times, we have to continue to upgrade themselves, so that they are in this competitive society in the position of not falling, advancing with the times, the continuous innovation of construction technology and construction methods of the ever-changing changes, we can only adapt to, conquer, and create in order not to be eliminated by society. These years, although the leadership and colleagues in the help and support has made some progress, but I know that I still have some shortcomings and deficiencies, the theoretical foundation is not solid, business knowledge is not comprehensive enough, the way of work is not mature enough. In the future work, I want to try to do better, strengthen theoretical learning, accumulate project experience, constantly adjust their own way of thinking and working methods, more involved in the design, development and project management work, in practice to hone their own, exercise themselves, and become a project team can be a unique employee. In the process of project construction, I can summarize the construction experience in time. Has authored the "modern garden construction in the anti-season planting", "talk about the construction project cost control" and other papers.

Through these years of work and study, I feel that I meet the conditions of service, apply for promotion of engineers, please organize the assessment evaluation. At the same time, I also hope that this review as a means to promote their own progress, and lay a good foundation for greater achievements in the future.

The above is the main technical work I have been engaged in recent years, through learning from books, learning from practice, learning from others, coupled with their own analysis and thinking, there is indeed a greater harvest and progress. Achievements and shortcomings exist at the same time, experience and lessons learned go hand in hand. I will continue to work hard to overcome the shortcomings, summarize the experience, learn from the lessons, to do their work better, so that their professional knowledge and technical ability to be further improved!

First, personal resume

I graduated from China's leading architectural school - Xi'an University of Architecture and Technology in July 20xx, five-year urban planning, bachelor's degree. After that, I worked in Lianyungang City Urban Planning and Design Institute to engage in urban planning, urban landscape design and architectural design work. 2007 was appointed as the deputy director of the Planning and Design Institute to date. He has been engaged in urban planning, urban landscape and architectural engineering programs and construction drawings design and relevance of theoretical research and planning and design technology research work, in the "moral, ability, diligence, performance" and other aspects are outstanding.

Second, political thought and moral character

First of all, in the ideological positive demand for progress, keep pace with the times, and seriously study the party and the country's policies, to understand the latest developments in society. Although I have not yet joined the Chinese ****anufacturing party, but I have also been to the party's standards of strict requirements for themselves, consciously accept the party members and colleagues to supervise and help, persistently overcome their shortcomings, make up for their own shortcomings, and strive to withstand the test of the long years to come, and join the great Chinese ****anufacturing party at an early date.

As an urban planner, I have been adhering to the professional ethics of the planner, and strive to find the greatest intersection and balance between administrative means, developer interests and the needs of the masses, and strive to be truly pragmatic in every project I am responsible for. Therefore, treating each project seriously and attentively is the basic principle of my work. This is also recognized by the leadership of the Planning Bureau and the leadership of the hospital.

Since joining the work, I have a strong sense of ownership, the company's development and their own development closely linked together. I have always abided by the company's rules and regulations, and actively obey the leadership of the work arrangements, the successful completion of a variety of work tasks, to maintain collective honor. In the work of active efforts, hard-working, conscientious study of relevant professional knowledge, seriously summarize the experience and skills in the work, and constantly enrich and improve themselves. In the self-improvement at the same time, but also strive to take up the unit in the "academic leader" of the burden, usually take the initiative to organize colleagues to summarize the project and exchange, enthusiastic to help new colleagues, to strengthen the cohesion of the unit, to promote the overall progress of the team.

Third, professional and technical capabilities

Since the current position, I have participated in many provincial and municipal construction authorities organized professional and technical training, many times to participate in the Jiangsu Provincial Planning Institute, Planning Association organized by the annual meeting, and in the planning and design of a number of projects with the Shenzhen City Planning and Design Institute, the Jiangsu Provincial Institute of Urban Planning and Design and other well-known institutes for academic exchanges and technical exchanges. In a number of planning and design projects with the Shenzhen Urban Planning and Design Institute, Jiangsu Urban Planning and Design Institute and other well-known hospitals for academic exchanges and technical cooperation; on the domestic well-known cities such as Beijing, Shanghai, Guangzhou, Shenzhen, Zhuhai, Xi'an, Qingdao, Linyi and other places, as well as most of the cities in Jiangsu Province, have carried out urban planning and construction of the investigation, study, learning, learning, exchanges, investigation, so that I have been academic, technical horizons and the ability to work practice has been greatly improved. At the same time, I also strive to understand and master the new theories, new technologies, new methods, new norms, to guide the usual planning and design work and the technical management of the project.

Summary of work of intermediate title 4

I xx, in xx in xx months graduated from xx University xx professional. After graduation, I entered the xx unit, engaged in xx work. During the work period, in xx in xx months to obtain xx professional and technical qualifications. In these six years, has been working in the xx first line, diligent, hard-working and dedicated. Work, adhere to the principle of personal interests of the company's interests, regardless of personal gains and losses; to do a combination of theory and practice, the xx work excellence, hard work xx technology, and strive to improve the level of business and technical skills, and successfully completed the company and the leadership of the various tasks assigned. Review work more than six years since the political thinking and business work in the study, progress and growth, is summarized as follows:

First, ideological and political

Through theoretical learning to continuously improve their own, enrich their own, construct a correct world view, outlook on life and values. In the usual work of theory and practice, the implementation of the party's eighteen directives, the practice of the party's mass line education and practice activities, practice economy, oppose waste, clean and self-discipline, consciously away from all kinds of social phenomena, resolutely resist the four ` wind problems, firmly establish the work style of serving the people, and the Party Central Committee in the political, ideological, and action to maintain a high degree of consistency.

Second, the business work

Since the term of office, as the work of xx. In the work, in line with the idea of doing a job, always be able to maintain a positive attitude to work, obey the leadership arrangements, and humbly to the company's older comrades to teach, enrich their work experience and ability. Courage to innovate, the courage to take on heavy burdens, and actively learn new technologies, through a large number of work practices to master new technologies and new methods and timely application to the actual work, and be able to solve all kinds of difficult problems encountered in the work in a timely manner. In addition to do their own job responsibilities at the same time, but also to play their own strengths to take the initiative to assist other colleagues to complete the work, and gradually complete the transition from a newcomer to a veteran employee. In compliance with the rules and regulations of the company and the department at the same time, and actively cooperate with the coordination of departmental tasks, and strive to improve work efficiency, to do early to work, late to work, but also often work overtime to complete the task. Many times in-depth jurisdiction of the enterprise to carry out learning and practice activities, on the xx aspects of the problem with the enterprise to carry out extensive and in-depth exchanges, on the xx work of the problem of on-site guidance, for the production enterprises to provide technical services. xx end of the year, the company should be in the new situation of the development of the requirements of the new department to undertake the new department of part of the preparatory work, is mainly responsible for the xx. Learning the sea has no boundaries, do not forget to refuel and recharge for their own work, and actively participate in all kinds of professional and technical training, continuing education. Participate in various types of professional and technical training, continuing education learning, such as xxx, xxxx, etc., are qualified by the examination results and obtain a certificate. Through years of study and work practice, their business quality and ability to further improve and strengthen, but also recognized by the company's leadership and colleagues, xx and xx years of personal annual assessment has been rated as excellent, xx years of personal annual assessment for advanced.

The above is a summary of six years of work, through learning from books, practice learning, learning from others, coupled with their own analysis and thinking, there is indeed a greater harvest and progress, of course, achievements and shortcomings exist at the same time, experience and lessons learned are also accompanied by overcoming the shortcomings of the learning process, there is no end to the road extends under the feet, as always, I will continue to do my best in the work, and continue to learn, strive to forge ahead, improve their own I will, as always, continue to do my best in my work, constantly learning, striving to forge ahead, improve their business ability, exercise their working ability, summarize experience, learn lessons, do a better job, contribute to the cause of xx.

Intermediate title work summary 5

Through the company's leadership care and exchange of colleagues, I study hard, hard work, has been appointed to serve as a field assistant engineer professional and technical positions, in turn, served as a construction worker, technician, supervisor and other positions. Experienced work, study, re-work, re-learning process. Regardless of when and where, I always with the infinite love for the work of this job, and constantly ask for advice, study, and timely application of the learned professional knowledge and work experience to the production practice, and achieved some good work performance.

In terms of political thought and moral construction, I have always been dedicated to my work, serious and responsible work, strong sense of responsibility, and have a good work ethic; in recent years, I have been studying current affairs and politics, and keep up with the party's policies to better implement and enforce the party and state's routes, guidelines and policies. This also improves my political awareness, work skills and dedication.

In terms of professional and technical skills, I have been studying hard on professional and technical theories, earnestly seeking evidence, and striving for excellence; in recent years, I have read the General Principles of Civil Building Design, Seismic Design Code for Buildings, Technical Specification for Exterior Wall Insulation Engineering, Building Construction Manual, Construction Technology, Quality Acceptance Standards for Building Construction, General Diseases of Residential Quality and Prevention, Supervision Specification, etc. etc. So that I further broaden the knowledge, improve the level of business, growth of professional skills, but also more greatly stimulate the enthusiasm for work.

intermediate job summary 6

I graduated from XXXX in July 20xx, the same year into the XXXX work so far, in 2009 to obtain the qualification of assistant engineer, in 2011 to obtain the second level of registered constructor. 7 years has been working in the construction site, and obtained the corresponding post certificate and related qualifications. 7 years, I participate in a number of project engineering construction management, each project is a new to me, and I have to work in the construction site. Each project is a new exercise for me, are the accumulation of experience, I have been from a tender college students, metamorphosis into a qualified construction industry talent.

Through the company's leadership concern and the exchange of coworkers, I study hard, hard work, has been appointed to the site of the assistant engineer professional and technical positions, in turn, served as a technician, the site of the civil engineer and other positions. Experienced work, study, re-work, re-learning process. No matter when and where, I always with the infinite love for the work of this job, and constantly ask for advice, study, and timely application of the learned professional knowledge and work experience to the production practice, and achieved some good work performance.

Work achievements and fulfillment of duties:

July 20XX-October 20XX, I participated in the XXXX project, which covers an area of more than fifteen thousand square meters, construction area of more than 30,000 square meters of two high-rise residential buildings, 1 # building 18 floors, 2 # building 17 floors, the site is responsible for the main technical work.

January 20XX-June 20XX, I participated in the XXXX project, which has a building area of more than 100,000 square meters, covers an area of more than 50,000 square meters, is a large-scale comprehensive residential area containing 2 ~ 18-story multi-residential buildings and stores, responsible for on-site civil engineering management.

These projects have gained a good market reputation because of the efforts of the project team; I have been recognized as an advanced individual for many times in the company's annual assessment.

In the political thinking and moral construction: I have always been dedicated to work, humble and good learning, specializing in business, dedication, serious and responsible work, strong sense of responsibility, has a good work ethic; has always been a decent style of work, honesty and pragmatism. Can establish and maintain a correct outlook on life, values and socialist concept of honor and shame. In recent years, I have been seriously studying current affairs and politics, keeping up with the Party's policies, and insisting on reading news reports, as well as some mainstream media reports, so as to better carry out and implement the Party's and the country's routes, policies and guidelines through the national events and the people's voices. This also improves my political awareness, working skills and dedication. In addition, I have always insisted on studying the laws, regulations, rules, systems and norms and standards relating to the construction of construction projects and other aspects of the construction, so as to be loyal to their duties, law-abiding, clean and self-disciplined, hard work, and constantly strive to improve the quality of their own work and the quality of service.

In terms of professional and technical skills: I study hard on the theory of professional and technical, earnestly seeking proof, and strive for excellence; in recent years, I have downloaded through the network and at my own expense to buy and read a series of professional books, such as the Technical Regulations for External Wall Insulation Engineering, Building Construction Manual, Construction Technology, Quality Acceptance Standards for Building Construction, Supervision Specification. So that I further broaden the knowledge, improve the level of business, growth of professional skills, but also more greatly stimulate the enthusiasm for work. With the accumulation of professional knowledge, engineering performance increases, contact with more engineering cases, I am more and more confident and proud, so that I have more opportunities to help comrades around me to solve professional problems.

In recent years, I have been responsible for reviewing the construction organization design, special construction plan, on-site quality inspection, visa review and other important technical work through a large number of related information and literature, reference to other people's engineering cases, and combined with my own years of work experience. In the construction process, I often go into every corner of the project, timely and accurately correct the management problems in the project, quality problems and details of the practice is not perfect in place, and urge it to seriously rectify.