Drilling construction contract

With the continuous development of the spirit of the rule of law, people pay more and more attention to contracts, and people use contracts in more and more occasions. Signing a contract is also one of the most effective legal basis. So what problems should we pay attention to when drawing up the contract? The following is a sample of drilling construction contract collected by me for your reference, hoping to help friends in need.

Model drilling construction contract 1 Party A:

Party B:

1. When Party B contracts the drilling project of Party A, Party B and Party A shall provide Party B with a construction site of 65,438+000 square meters without potential safety hazards before the commencement date. There are no construction obstacles such as houses, trees, high-voltage electricity in the air, communication cables and underground ditches on the surface. Ensure that the roads and waterways leading to the construction site are unblocked, so that Party B can transport tools and engineering materials normally during the construction period.

2. The materials used by Party B for drilling wells are pipes.

3. The drilling depth is about 100 meters. The cost of drilling wells is RMB per meter. XX tools are not included in this price. (such as water pump, pump pipe, electric wire and control box).

4. After Party B's equipment enters the site, Party A shall pay Party B an entrance fee of 65,438+00%. After Party B completes the construction, Party A will pay the balance to Party B in one lump sum. e86.c

5. Party A shall ensure that Party B can carry out the construction smoothly. If the construction cannot be carried out normally due to external interference, Party A shall be solely responsible for making the construction impossible in the middle, and Party A shall subsidize Party B by 65,438+00%.

6. This contract is made in duplicate, with each party holding one copy, which shall come into effect after being signed by both parties.

first party on behalf

Representative of Party B:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Template of drilling contract for Well 2 of Party A (Owner):

Party B (construction party):

According to the provisions of the Economic Contract Law of the People's Republic of China and the Regulations on the Administration of Construction Market in Henan Province, and in combination with the trading rules of decoration engineering and the specific conditions of this project, the two parties reached the following agreement through friendly negotiation:

I. Main contents of the contract:

The drilling project shall be handed over to Party B for construction in form.

2. Total Project Cost (in words)

3. Project content:

(1) Party A agrees that Party B's drilling depth is tentatively set at meters. If the sampling of drilling water does not meet the drinking water standard, Party B may increase the drilling depth with the consent of Party A..

(2) The drilling cost per meter is tentatively determined according to 500 yuan standard.

(3) According to the drilling position determined by Party A, if Party B encounters gravel stratum, causing damage to Party B's drill bit, Party A shall bear the cost of purchasing the drill bit.

4. Project payment method: 65% deposit will be paid on the day of signing the contract.

5. The construction period is days, from year to year.

6. The warranty period of the project is one year.

7. Settle the balance within three days after the completion of the project.

8. According to Party A's requirements, Party B provides Party A with a set of water intake equipment, including a deep water well pump and a well house, and the amount is included in the general project contract.

For the project located on the urban road, Party A shall pay 30% of the half-year payment, and 5% of the balance after the project is completed, and provide a set of water supply equipment without tower, which is RMB.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Mode 3 Drilling Construction Contract Party A (Owner):

Party B (construction party):

According to the provisions of the Contract Law of People's Republic of China (PRC) and the Regulations on the Administration of Construction Market, and in combination with the trading rules of decoration engineering and the specific conditions of this project, both parties have reached the following agreement through friendly negotiation:

I. Main contents of the contract:

The drilling project shall be handed over to Party B for construction in form.

2. Total Project Cost (in words)

3. Project content:

(1) Party A agrees that Party B's drilling depth is tentatively set at meters. If the sampling of drilling water does not meet the drinking water standard, Party B may increase the drilling depth with the consent of Party A..

(2) The drilling cost per meter is tentatively determined according to 500 yuan standard.

(3) According to the drilling position determined by Party A, if Party B encounters gravel stratum, causing damage to Party B's drill bit, Party A shall bear the cost of purchasing the drill bit.

4. Project payment method: 65% deposit will be paid on the day of signing the contract.

5. The construction period is days, starting from _ _ _ _ _ and ending at _ _ _ _ _.

6. The project warranty period is _ _ _ _ _ _ years.

7. Settle the balance within _ _ _ days after the project is completed.

8. According to Party A's requirements, Party B provides Party A with a set of water intake equipment, including a deep water well pump and a well house, and the amount is included in the general project contract.

For the project located on the urban road, Party A shall pay 30% of the half-year payment, and 5% of the balance after the project is completed, and provide a set of water supply equipment without tower, which is RMB.

Party A (official seal): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model 4 of drilling construction contract: construction unit (Party A);

Employer (Party B):

In order to solve the problem of office and domestic water, Party A newly drilled a deep well about meters. Party B is now entrusted with the construction. In order to ensure the quality and quantity of the project to be completed on schedule, this contract is signed through full consultation between both parties.

Article 1 General situation of the project

1, project name: deep water well project

2. Project location:

3. Project content and contract scope: drilling, well pipe installation, gravel pouring, hole sealing, well cementing, pump body installation, pumping, water quantity and water temperature detection.

Second, the preparation before construction

1. Both parties shall determine the well location before construction.

2. Discharge of electricity, water and mud for Party B's construction.

3. Party A and Party B * * agree to start the construction on.

4. Party B shall not subcontract or contract this project to a third party for construction.

Third, the project scope and standards of X.

1. The drilling project in this contract shall be contracted by Party B in the form of contract works and materials, and all the construction facilities, tools and personnel required for the project shall be borne by Party B. Party B shall have the qualification recognized by the construction project.

2. The works referred to in this contract are: drilling diameter a; Ge; 600. Welded reinforced concrete pipes (length 4, inner diameter 300) are used for well pipes.

3. Within _ _ _ _ days after X, Party A and Party B shall go to the construction site for acceptance, and the verticality of drilling shall be subject to the fact that the pump head of the three-inch submersible pump can smoothly fall to the bottom of the well.

(1) The project price is RMB per meter.

(2) Party B shall charge according to the drilling footage and the actual drilling depth, and pay after the acceptance.

(3) Party B shall bear the cost of water, electricity and oil for drilling.

Four, into the X acceptance

1, acceptance by sections (including well depth, pipe laying diameter and filler). The signatures of Party A and Party B and relevant departments shall be used as the basis for acceptance.

2. The drilling depth should be measured and used as evidence of settlement.

Verb (abbreviation for verb) Other matters

1. Party B shall ensure that the water output of X reaches a per hour; Ge; Tons, if the water output is less than tons per hour, Party A will pay% of the single well project cost.

2. During the construction period, Party B shall pay attention to safe construction. In case of casualty accident, Party B shall bear all casualty expenses.

3. After Party B transported the drilling equipment to the construction site, it was encountered due to power failure and human factors.

In case of force majeure, the construction period can be postponed.

4. Other matters shall be settled by both parties through consultation on the principle of not affecting the construction period.

This contract is made in quadruplicate, with each party holding two copies. This contract shall come into effect after being signed and sealed by both parties.

Party A (official seal):

Party B (official seal):

Legal representative:

Legal representative:

Authorized customer:

Authorized customer:

Date of Signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Drilling Construction Contract Mode 5 Party A:

Party B:

In order to ensure the drilling quality and smooth progress of the drilling project, Party A and Party B sign this contract through friendly negotiation:

Article 1: Construction site: West Street Credit Cooperative Bank, Ganzhou District, Zhangye City.

Article 2, Project Scope and Technical Requirements

1, and the drilling depth is determined according to the actual situation of the formation;

2, drilling diameter is not less than 600 mm.

3. Reinforced concrete cement well pipe (hereinafter referred to as well pipe) formed by 12 inch centrifugal suspension roller. The quality standard of well pipe shall not be lower than the national or industrial standards.

4. After well washing, the water and sand shall be clean, and the sand content shall not exceed1/200,000.

5. Boreholes should be round and straight, and pipes should be unobstructed.

6. Responsible for drilling, material preparation, completion, well washing and well washing. After the completion of the well, an observation well will be built, with a manhole cover, and Party A will cooperate to install pumping equipment.

7. The expenses of this project include all expenses of water, electricity, drilling, well management, backfilling, cleaning and completion.

8. Drilling time can be used except at noon 12: 00- 14: 30 and at 2 1: 00-7: 00 in the evening.

Article 3, the project cost

There are three wells in this project, one of which is a water intake well with a tentative depth of100m, and the other two are recharge wells with a tentative depth of 30m, totaling160m. The unit price per meter is RMB/meter, and the total project cost is RMB, in words.

Article 4. terms of payment

After the signing of this contract, Party B enters the site to install drilling equipment, and Party A pays RMB (in words). Pay RMB, in words, within two days after the well is completed, cleaned and delivered. If there is no quality problem after one year, the rest will be paid by the Ministry.

Article 5, the construction period

From the beginning of construction to the completion of delivery.

Article 6. Responsibilities and obligations of Party A

1. Party A is responsible for handling the relevant procedures for drilling approval.

2, responsible for coordinating the relationship between the scene, in order to facilitate the construction work of Party B. ..

Article 7. Responsibilities and obligations of Party B

1. Party B shall operate in strict accordance with the safety regulations during the construction operation, and the personal safety accidents caused thereby shall be borne by Party B, and Party A shall not bear any responsibility.

2. In case of drilling sticking, drilling hanging and well collapse during construction, Party B shall bear all economic losses.

3. If the well cannot be used or scrapped within one year due to completion technology and material quality problems, Party B shall be responsible for re-drilling the well.

Article 8. This agreement is made in duplicate, which shall come into effect after being signed and sealed by both parties, and each party holds one copy.

Article 9. If there are any matters not covered in this agreement, both parties shall settle them through consultation. If negotiation fails, they can submit to arbitration or bring a lawsuit to the court.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Mode 6 Drilling Construction Contract Party A:

Party B:

Through equal consultation, Party A and Party B reached an understanding on the matter that Party A entrusts Party B to drill wells, and signed the following contract terms:

I. Project site

Jilin XX company hospital

Second, the project and related requirements

1. construction project: a 50-degree underground deep well.

2. Size requirements: outside diameter of well pipe: c; Well diameter: c.

3. Material selection: toughened plastic pipe.

4. Technical requirements: Ensure normal water use in dry season, with water output of 30 hours.

Third, the time limit for a project requirements

The construction period is 4 calendar days, and the project should be completed before _ _ _ _ _ _ _ _.

Fourth, the project price

The project price is per meter depth 150 yuan, and the total price is 7,500 yuan only (this item is 50 meters depth fee, and the increase or decrease of well depth will be settled according to the facts).

The above total price is the expenses paid by Party A to Party B, including all expenses such as engineering materials, auxiliary materials, labor, transportation and miscellaneous expenses. In addition, Party A will no longer pay any fees to Party B. ..

Verb (abbreviation of verb) payment terms

After Party B's project is completed and accepted by Party A, Party A will pay Party B the project payment in cash at one time.

Other agreements of intransitive verbs

1. In the course of construction, Party B shall be responsible for the casualties and other accidents caused by violation of operating rules.

2. Party A shall provide convenience for Party B's construction, and electricity for drilling wells shall be provided by Party A. ..

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Mode 7 Drilling Construction Contract Party A: _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _

Examiner: _ _ _ _ _ _

According to the investment plan of water conservancy construction and the needs of rural production and life, in order to ensure the smooth implementation of the project, the construction period and construction quality, the following contract is reached by Party A, Party B and the supervisor * * * through negotiation:

I. Project name:

Second, the project location:

Third, the construction content:

1, drill a new hole of _ _ _ _ _ with a drilling machine, and be responsible for the electrical survey of the hole;

2. Install φ borehole wall pipe gauge, pipe filter gauge and filter material for backfilling;

3. Supporting installation submersible pump;

4. A 3× 4m well chamber;

5. Set the low-voltage line instrument.

Four, the way of contracting and contract price:

Implement the general contracting law. Total contract price.

Verb (abbreviation for verb) Responsibility of each party:

(I) Party A's responsibilities

1, organize villages and towns to determine well location and engineering construction scheme;

2, responsible for engineering supervision and inspection and related coordination;

3, responsible for organizing the acceptance of the project;

4, responsible for the allocation and management of state investment and self-raised funds;

(II) Party B's responsibilities:

1, responsible for transportation of construction machinery, procurement of equipment and materials and all construction work. Ensure that the project construction content is fully completed with good quality and quantity, and meet the acceptance criteria;

2, in accordance with the requirements of the relevant technical specifications for engineering construction, earnestly do a good job in engineering construction, high standard to complete the construction task;

3, seriously abide by the provisions of the safety production management, responsible for all safety work on the construction site;

4. Make construction records carefully and analyze relevant information in time to ensure that the project is economical, safe, reasonable and efficient;

5. After the project is completed, Party A shall be provided with two single well technical data.

(3) The responsibilities of the supervisor:

1, responsible for the implementation of well location, and providing relevant electrical logging data and reference materials;

2. Responsible for the coordination of construction environment such as "three links and one leveling" and mud discharge;

3. Be responsible for providing accommodation for construction personnel and providing 10 labor force for well pipe installation and packaging;

4, responsible for the quality supervision and inspection of the construction site;

5, responsible for the implementation of self-raised funds of ten thousand yuan.

Six, the project quality:

1. Quality inspection and acceptance: Party A shall organize relevant departments to conduct inspection and acceptance;

2. Quality standard requirements: meet the qualified standards and strive for excellent projects;

3. Acceptance basis: the drilling project is accepted according to the national acceptance standard for sinking engineering, the well pipe is successfully lowered into the well hole, the water pump and equipment operate safely, and the water output reaches the predetermined target. Party B shall not be responsible for the water quality and quantity problems caused by natural conditions; Well chamber shall be accepted according to the acceptance standard of construction project.

Seven, project settlement and disbursement of funds

(1) project settlement: according to the budget plan, combined with the actual completion and contract agreement.

1, the difference between the actual drilling depth and the planned depth, and the increase or decrease cost is calculated at RMB per meter;

2. The difference between the actual well pipe length and the planned length is calculated according to the budgeted unit price;

3. The construction water in the total contract price shall be provided by the village group, and the electricity consumption shall be calculated according to one kilowatt hour, and the excess shall be calculated separately;

4. After the project is settled, the remaining self-raised funds paid by the village group will be returned to the village group, and the insufficient part will be quickly raised by the village group and handed over to Party A. ..

(2) disbursement of funds:

1. The self-raised funds are raised by the beneficiary village group, handed over to Party A for management, and allocated to Party B by stages according to the progress of the project;

2. State investment: allocated according to the management method of reimbursement of county finance bureau;

Eight, the construction period and time limit for a project

The total construction period is 10 day. After the self-raised funds are fully paid by the beneficiary villages, it shall be calculated within three days from the date when Party A issues the notice of commencement. If it cannot be completed on schedule, 2‰ of the total contract price of the project will be deducted for each day of delay. Delays in the construction period caused by special factors such as climate and geology and factors other than Party B's own shall be postponed as scheduled.

Nine, other matters can be agreed according to the construction situation.

X this agreement is made in quadruplicate. Party A, Party B and the Securities Regulatory Commission each hold one copy, which will take effect after the self-raised funds are in place.

Attachment: List of Total Contract Price

Party A: Representative: _ _ _ _ _ _

Party B: Representative: _ _ _ _ _ _

Witness: representative of the town government: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Representative of the village committee: _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Drilling Construction Contract Mode 8 Party A:

Party B:

Through equal consultation, Party A and Party B reach the following terms on the matter that Party A entrusts Party B to drill wells:

I. Project Location: xx City, xx Province

Two. Duration requirements: the duration is 20xx years to 20xx years, with calendar days.

III. Project and related requirements:

1. construction project: when you look at the water well, the actual number of meters underground is not less than 150m.

2. Specification of well pipe: inner diameter is 286mm, outer diameter is 350mm, and length is 8000mm, so as to ensure smooth movement of submersible pump.

3. Material selection: the pipeline is welded cement pipe, and the filter material must be screened rice stone mixed with coarse sand.

4. Requirements of the well fort: it must be firm and flat.

5. Technical requirements: Ensure that the water output and sediment concentration meet the national standards in Code for Construction of Motor Wells.

Fourth, the project price:

1, the unit price per meter of well drilling is RMB, and the total price is subject to the actual depth of well drilling (meters of pipe running).

2. The unit price and total price are the expenses paid by Party A to Party B, including all expenses such as main materials, auxiliary materials, labor, transportation fees and taxes. In addition, Party A will not pay any fees to Party B. ..

Verb (abbreviation of verb) payment method: After the project is completed and accepted by Party A, Party A pays 90% of the total price to Party B, and reserves 10% of the total price as a quality guarantee, which will be paid one year later.

Obligations undertaken by Party A for intransitive verbs:

1, arrange the site required for construction and dig the reservoir in time.

2. Ensure the water and electricity supply required for the construction and bear the expenses.

Seven. Obligations undertaken by Party B:

1. Organize the construction according to the national construction specifications for motor wells, and be responsible for the exploration work and related facilities required for drilling.

2. To ensure the safe construction, Party B shall take full responsibility for all accidents such as casualties caused by violation of operating rules.

3. After well washing and dredging, ensure that the well depth is not less than 150m.

4. Party B shall be responsible for timely repairing the abandoned wells, collapses, non-effluent or unqualified effluent caused by quality problems.

5. If there are quality and technical problems within one year (warranty period) after the tube well is used, Party B shall be responsible for free maintenance and solution.

6. Except for the two obligations that Party A shall undertake, Party B shall be responsible for other project matters not included in this contract.

Eight. For matters not covered in this contract, both parties may sign a supplementary contract separately, which has the same effect as this contract.

Nine. This contract is made in quadruplicate, two for each party, and shall come into effect as of the date of signature.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Mode 9 Drilling Construction Contract Party A:

Party B:

Through equal consultation, Party A and Party B reached an understanding on the matter that Party A entrusts Party B to drill wells, and signed the following contract terms:

I. Project site

Jilin Eastasia Bao lai Li lai biology engineering co., ltd. hospital

Second, the project and related requirements

1. construction project: a deep water well 50 meters underground.

2. Size requirements: outside diameter of well pipe: cm; Well diameter: cm.

3. Material selection: toughened plastic pipe.

4. Technical requirements: Ensure normal water use in dry season, with water output of 30 M/ hour.

Third, the time limit for a project requirements

The construction period is 4 calendar days, and the project will be completed before.

Fourth, the project price

The project price is 150 yuan/meter depth, and the total price is 7,500 yuan only (this item is 50 meters deep, and the increase or decrease of well depth will be settled according to the facts).

The above total price is the expenses paid by Party A to Party B, including all expenses such as engineering materials, auxiliary materials, labor, transportation and miscellaneous expenses. In addition, Party A will no longer pay any fees to Party B. ..

Verb (abbreviation of verb) payment terms

After Party B's project is completed and accepted by Party A, Party A will pay Party B the project payment in cash at one time.

Other agreements of intransitive verbs

1. In the course of construction, Party B shall be responsible for the casualties and other accidents caused by violation of operating rules.

2. Party A shall provide convenience for Party B's construction, and electricity for drilling wells shall be provided by Party A. ..

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _