Luoqing River flows through Yongfu County, which used to be a necessary waterway for transportation between Guilin and Liuzhou. During the Republic of China period, you can still take a wooden boat to and from Guilin and Liuzhou. Later, because of land transportation, coupled with many dams in the river, the channel was blocked and abolished. To the end of the 20th century only in the county near the city, can still pass the wooden boat.

Luo Qingjiang Yongfu County, 57 kilometers long, the river is generally 40 to 60 meters wide; water depth of about 2 meters, navigable 3 to 5 tons of ships. Since ancient times is the county's main waterway. Down to the Lujia injected into the Liujiang River. 1958, Lujia County in the Riding dam construction power station, so the navigation is cut off. 1970 to build Longxi power station, the foot of the dam in the Jinshan, this route is only left under the Longxi dam to Yongfu County 4 kilometers, the passage of the 3 to 5 tons of small motorboats.

Luoqing River Luzhai County, 103 kilometers of waterways, north through Yongfu south of Liuzhou waterway, the main waterway for the territory. Output to grain, timber, local specialties for the bulk; input to salt, department stores, Suzhou and Hangzhou groceries and other commodities. The navigable capacity is 10 tons. Republic of 26 years (1937), the monthly operation of wooden boats to and from 40, 207 tons, 38 years, the operation of wooden boats up to 55, 320 tons. At the beginning of the liberation, the boat is still more. After the establishment of the county people's government, has repeatedly allocated funds to dredge the waterway, navigable capacity increased to 30 tons. 1952, to and from the operation of 110 wooden sailing boats, 548.4 tons. 1958 after the construction of Riding Luo Qingjiang River Barrage, the interruption of the north through the Yongfu waterway. 1968, the construction of the Jiangkou Power Station Barrage, the interruption of the south through the Liuzhou waterway. And because of the development of highway and railroad transportation, the Luoqing River waterway transportation has been sharply reduced. To 1987, only the county short-distance water transport, to timber and sugar cane in the season water transport is the main.

Shihua River Luzhai County, 67 kilometers of waterway, navigable 7-ton ships, and Luo Qingjiang River communication. Before the liberation, the foreign transport to timber, grain, tung, tea oil is mainly; input salt, department stores, Suzhou and Hangzhou and other commodities, Republic of China 26 years (1937), the day to and from the operation of wooden boats 10 to 15, 60 tons. On the eve of liberation, the day to and from the operation of wooden ships up to 24, 109.2 tons. After the establishment of the county people's government, the waterway has been further improved, navigability increased to 10 tons. 1957 construction of sickle bay dam, the waterway transportation stop, only a few wood water transport.

Luojiang River (also known as the Middle River) Luzhai County, 28 kilometers of waterway, and Luo Qingjiang communication. Republic of China in 26 years, the day to and from the operation of 33 wooden boats, 189 tons, the foreign transport to food, local products; import salt, department stores and other commodities. On the eve of liberation, 36 wooden ships of 153 tons were in operation. After the liberation, many dredging channel, navigable capacity increased from 3 tons to 7 tons. 1956, deer (Zhai) in the (ferry)) road opened to traffic, the waterway transportation decreased year by year, after 1970, the waterway transportation basically stopped. Yi River diversion hub project, in Lingui County, started in the winter of 1957, completed in March 1981. Divided into two trunk canals, the east canal to the east of Wan Tian Changling Dam as the first, connected to the Yi River on the east side of the tributaries of the small weir dam 15, 36 kilometers long. West trunk canal to the middle of the river dam as the head, connected to the west side of the Yi River on the history of the river dam, Penglai River dam, Zumiao River dam and Longjiang dam and other 20 large and small weir dam, 21 kilometers long. There are also two branch canals of 11 kilometers long, 6 bucket canals of 10.5 kilometers long, and 340 large and small ancillary works. The designed irrigated area is 53,300 mu, including 0.41 million mu of Wantian, 47,200 mu of Wutong (including Zhongyong), and 0.2 million mu of Dutou. In 1990, the actual effective irrigated area was 47,000 mu, including 43,000 mu of guaranteed irrigated area.

Wuluo Dam project, in Lingui County, is a subsidized water project of the East Main Drainage Canal of the Yi River, 700 meters downstream of the Wuhuo barrage. For the barrage wood pile pebble dam, 37 meters long, 2 meters high, 2.3 meters wide at the top. The diversion flow rate is 0.4 cubic meters per second. construction began in November 1965 and was completed in March 1966. Designed to irrigate 1,000 mu, the actual irrigation field 980 mu.

Luo Qingjiang Riding River Diversion Project, built in 1958. The project was approved by the autonomous region, by the Liuzhou Special Department of Water and Electricity Bureau of survey and design, earth dam, design flow 22.8 cubic meters per second, 42.3 kilometers of the total trunk canal, 98 kilometers of the trunk canal length, designed to irrigate an area of 146,000 acres, with a total investment of 8,587,000 yuan. On June 15 of the same year, mobilized 1,000 workers for construction preparations, on October 20, the project started in full, the construction of up to 60,000 people. 1960 spring, the head of the dam and the completion of the floodway, * * * cost 4.3 million yuan. Because the channel project is huge, but also worth the economic difficulties, September stop building.

High rock power pumping station, located in the town of Luo Rong high rock village at the foot of Luo Qingjiang River, the project is divided into three levels of pumping station, the first level was built in the village of high rock, reinforced concrete deep well pumping station; floor elevation of 67 meters, the outlet elevation of 93 meters, the net head of 27.8 meters, the cylinder diameter of 13 meters, the building area of 124 square meters; outlet 3, inner diameter of 1 meter, the tube length of 60 meters, the output of water 4.69 cubic meter per second. The second-level station is built in Manlan Village, with an outlet height of 110 meters, a net head of 19 meters, 5 outlet pipes, an inner diameter of 0.5 meters, and a water output of 1.8 cubic meters per second. Three-stage station was built in Zhonglei Village, the outlet elevation of 120 meters, the net head of 11.9 meters, the outlet pipe 3, inner diameter of 0.35 meters, the water flow 0.66 cubic meters per second. The whole project branch canal 29, 65.66 kilometers long, the size of the ancillary works 229. The installed capacity of Gaoyan primary station is 3 sets of 1710 kilowatts, the installed capacity of Manlan secondary station is 5 sets of 575 kilowatts, and the installed capacity of Zhonglei tertiary station is 2 sets of 120 kilowatts. The total designed irrigated area is 83,300 mu, including 41,700 mu of paddy fields and 41,600 mu of she-land.

Huangcuo water wheel pump station, located in Luzhai County Luoqing River upstream, 1.6 kilometers from the Huangcuo rule, the barrage was built in the high waves of the beach. The hub project consists of a continuous arch dam, diversion holes, sand flushing gates, rafts, water wheel pump dam, power plant is composed of pumping irrigation, power generation and comprehensive utilization of the project, the maximum height of the dam is 5 meters, the arch diameter of 5 meters, by the arch arc piers to form a double arch, 115 meters long. The right bank built a water wheel pump dam, the installation of 100-type water wheel pump 1, the use of head 36 meters, into the water flow rate of 7.75 cubic meters per second, outflow flow rate of 0.42 cubic meters per second, the power plant room is 30.6 meters long, 8.8 meters wide, closed water elevation of 111.5 meters, the bottom of the tailpipe elevation of 91.6 meters; Immediately after the water wheel pump dam, the installed capacity of 3 units of 2,400 kilowatts. The left bank builds a water wheel pump, 10 meters long, installs 2 sets of 100-type water wheel pumps with an installed capacity of 200 kilowatts, 1 for pumping water for irrigation and 1 for temporary power generation. The west trunk canal is 7.3 kilometers long, with a design flow rate of 0.4 cubic meters per second, the south trunk canal is 5.3 kilometers long, with a design flow rate of 0.4 cubic meters per second; the north trunk canal is 14 kilometers long, with a design flow rate of 0.15 cubic meters per second; and the branch canals are 8 in number, and **** 14 kilometers long. Designed irrigation area of 0.86 million mu. September 1968 to start construction, completed in March 1969, the head of the dam in 1970, the two sides of the water wheel pumps on the water irrigation fields. 1969 September power plant house to start construction, completed in the winter of 1970. 1980 April the first unit of power generation; July 1981 the second unit of power generation, in June 1987, the third unit of power generation.

Jiangkou water wheel pumping station, located in Luzhai County Luo Qingjiang River downstream of Jiangkou township near Luo Zitun, for pumping irrigation, power generation comprehensive utilization project. Because the riverbed from the east bank to the west bank has a river bottom rock cross shelf, 6.1 meters high, 28 meters to 35 meters wide, dam built in this river dragon "spine". Hub project built to connect the gravity dam, water wheel pump room, locks, power plant room, stall dam, the head of the dam on the east bank with the arch of 5 spans, 130 meters long; connected to the gravity dam, 15 meters long; west bank side of the arch of 7 spans, 70 meters long. The total length of 215 meters. The height of the dam is 15 meters, 12 meters, 8 meters respectively. The stall water sub-dam is earthy and 130 meters long. The power plant house is riverbed type, 30 meters long and 20 meters wide, with an installed capacity of 4 sets of ***3200 kW. The locks are designed with 1 ship engine. East and west banks are installed on each side of the 100-type water wheel pump 1. West trunk canal length of 4 kilometers, overwater flow 0.9 cubic meters per second; East trunk canal length of 13 kilometers, overwater flow 0.45 cubic meters per second. There are 20 ferries with a total length of 1,589 meters. There are 2 tunnels with a total length of 240 meters and 2 anti-siphon tubes with a total length of 390 m. The construction started in October 1968, and in 1977, the supporting works on both sides of the river were completed. In Yongfu County in the lower section of the river built Longxi power station, installed capacity of 1,450 kilowatts. built in 1970, the dam in the foot of Jinshan.

Huangguan power station, for irrigation, power generation comprehensive utilization project. In the yellow corona water wheel pumping station dam head, irrigation project completed in September of that year to start construction of the power plant. Plant length of 30.6 meters, 8.8 meters wide, closed water elevation of 111.5 meters, installed capacity of 3 2250 kW. 1970 winter plant completion, power generation equipment due to manufacturing delivery delays, the installation work until 1979, 3 generating units were installed in April 1980, July 1981 and June 1987 power generation.

Jiangkou power station, located in luzhai county jiangkou township near Luozi village, 33 kilometers away from the county, for irrigation power generation comprehensive utilization project. Above the dam site 263 kilometers of the main river, rainfall area of 7517 square kilometers, the average flow rate of 260 cubic meters per second. The power plant house is cylindrical, with an inner diameter of 24 meters, cylinder wall height of 86.9 meters, maximum head of 7.8 meters, design head of 6.48 meters, installed capacity of 2×3750 kilowatts, with an average annual power generation capacity of 38.4 million degrees, an annual utilization time of 5130 hours, and a minimum guaranteed output of 1550 kilowatts during the dry water period.