Traditional Culture Encyclopedia - Traditional virtues - Carpentry molding skills
Carpentry molding skills
To ensure that the template joints are tight and no slurry leakage, for the joints greater than 5mm should be taken to close the closure measures for closure. The old wooden mold should be cleaned up the surface before installation. When the height of the bracket is large or the load is large, it is appropriate to use the main riser steel pipe diameter is not less than 48mm, and there is a crossbar reinforcement rod gantry erection. The erection of vertical diagonal braces and horizontal diagonal braces of steel pipe stent should be in accordance with the provisions of the current national standards on steel pipe scaffolding. For cast-in-place multi-storey and high-rise concrete structure, the uprights of the upper and lower floor formwork supports should be aligned, and the templates and steel pipes of the supports should be scattered and stacked.
- Related articles
- Liaoning Chaoyang real estate home furnishing network
- Why can modern science and technology be born in China?
- Old powder mixed with glue is not good to use how
- Movement is based on what you move.
- The optimization scheme of rice planting technology and the strategy of improving planting efficiency may be learned together.
- Difference between t5 and t8 lamps
- Location of Dragon Boat Race in Nanning in 2022
- How to make enterprise propaganda film
- Chicken tattoo what tattoo most auspicious tattoo?
- Art festival host speech (five)