Part I

In 20xx, the city water conservancy project construction quality and safety supervision station in the Bureau of the party group under the direct leadership of the provincial quality supervision center under the business guidance of the station in the sister departments of the support of the cooperation, conscientiously implement the implementation of the Ministry of water conservancy project quality management regulations. Effective fulfillment of the government's quality supervision of water conservancy projects to implement the function, seriously grasp the city's water conservancy project quality supervision and management work to complete the objectives set at the beginning of the year. Now the year's work is summarized as follows:

First, the unit's own construction

I station of the existing personnel, including (job title), people, (job title), people. Quality supervision is an important part of the project quality management work, quality supervision team building is the key to improve the level of supervision and management of water conservancy project quality. Quality supervision of water conservancy projects is a professional, technical, policy and practical work.

Therefore, my station attaches great importance to the training and education of quality supervision personnel, on the basis of self-study, often organized to learn the country, the Ministry of Water Resources and the province of engineering quality management laws, regulations and technical standards. Organizations concerned to participate in the province's water conservancy project quality supervisor qualification training courses.

In the daily quality supervision work, each quality supervision personnel can often go deep into the site, familiar with the construction process and quality inspection methods of the project, and can adhere to the principle of impartiality, to maintain a diligent and honest style of work, over the past year, we conscientiously implement the provisions of the party culture and clean government construction of the responsibility of the book, the conscientious implementation of the Executive Board of the party group formulated the "cadres of the cleanliness of the provisions of the law," there is no A violation of law and discipline occurred, set up a good image of administrative law enforcement officers.

Second, quality supervision and management

In the process of quality supervision of the project, I station mainly from the following aspects of the work:

1, strict implementation of quality supervision procedures

In the quality supervision process, the strict implementation of the "Provincial Water Conservancy Project Quality Supervision Procedures". Supervision procedures", first, before the start of the project, quality supervision procedures in a timely manner, signed the "water conservancy project quality supervision book"; second, after the start of the project, the project is divided in a timely manner for approval procedures, clear project major divisions and key key parts; third, in the process of implementation of the project, in case of adjustments to the division of the project, major design changes, etc., must be reported to the Quality Supervision Station for the record; fourth, in the implementation of the project in a timely manner for the various stages of the quality grade approval. Quality level approval.

2, strengthen the supervision and inspection of quality behavior

The past quality supervision is often focused on the supervision of the physical quality of the project, but ignored the supervision of the quality of the construction parties involved in the project behavior. According to the "Construction Project Quality Management Regulations" and the Ministry, the provincial water conservancy project quality supervision and management regulations, in order to grasp the supervision of the physical quality of the project, check the quality management system of the project legal person, the quality control system of the supervisory unit and the construction unit's quality assurance system, focusing on the superintendent of the engineer, the project manager, the person in charge of the technology and the final inspection of the engineers in place; check the implementation of the "construction standard mandatory provisions" (water conservancy project), the construction enterprise. Standard mandatory provisions" (water conservancy project part); check the supervision unit in the construction supervision process to implement the "construction supervision specification", to carry out side supervision, witness sampling, as well as supervision personnel license on duty; check the construction unit, supervision units, construction units, the quality of the project inspection and assessment of the situation.

3, strictly grasp the quality standards, do a good job of quality assessment

The implementation of the principle of "supervision, help, promote" combined to guide the participating units to do a good job of engineering quality assessment. Through the construction, supervision, construction unit of engineering technical data and random checks on the quality of the project in kind, check and verify the construction unit, supervision unit in the project quality self-assessment and reassessment, whether or not the strict implementation of the project quality assessment standards, found that the quality of the problem or defects resolutely require rectification. In the project quality spot check, both to check whether the construction unit self-test meets the requirements, but also to check whether the supervision unit has a certain number of parallel testing.

The appearance quality of water conservancy projects is not only the image of the participating units, but also the image of our water conservancy industry. Therefore, in our work, we require the participating units to strengthen the internal quality management, but also to strengthen the management of the appearance of the project quality. Strictly grasp the standards in the quality assessment, the appearance of the quality does not meet the requirements of the project quality can not be rated as good grade.

4, comprehensively carry out the quality of construction in the construction of supervision and random inspection work

I station many times in-depth site site supervised water conservancy projects to carry out supervision and random inspection in the construction units generally on the basis of self-checking, according to the Ministry of water conservancy project quality inspection scoring methods, on-site inspections and data review on the basis of scoring the project one by one. For problems in the inspection, on-site comments, deadline for rectification, so that the quality defects and quality of the discovery of hidden problems have been dealt with in a timely and effective manner, the entire project under construction is always under control.

Third, the supervision of the project

20xx, the city's water conservancy projects (excluding water-related projects outside the industry) construction projects quality supervision coverage of 100%, the city's supervised water conservancy projects *** items. Among the water conservancy projects implemented by the Bureau of water conservancy projects, including xx project has been completed, has been accepted; has been accepted unit project; has been accepted branch project, of which a good, branch project good rate of %.

Fourth, the next step of the work intends to

The quality of water projects is directly related to the state and the safety of people's lives and property. Review the quality management work in the past year, although there have been some achievements, but there are still many shortcomings. In the next step in the work, I intend to further improve the quality supervision of water conservancy projects from the following aspects:

First, raise awareness, increase publicity, and firmly establish the quality of life is the consciousness.

The second is to further strengthen the quality supervision and management, establish and improve the quality supervision and management network, establish and improve the quality supervision and control mechanism.

Three is to further strengthen the quality supervision of the supervised project sampling, strengthen the supervision of parallel inspection, to ensure the quality supervision of the sex.

Fourth, further strengthen the technical training of quality supervision personnel, improve the technical level, to ensure the quality of quality supervision.

Part II

With the scale of investment in water conservancy projects increasing year by year, coupled with the geographical characteristics of the xx mountainous and watery. Formation of water conservancy project layout of the point, line long, wide, large amount of characteristics, xx County Water Resources Bureau from the following aspects of the quality and safety management of water conservancy projects.

First, improve the quality of the supervisory body, play the role of day-to-day supervision.

xx County Water Conservancy Project Quality and Safety Supervision Station in the face of the establishment of a short period of time, the actual staff, the Bureau of Quality Supervision Station for the quality management of the main force, and strive to strengthen the supervision and management of water conservancy project quality and safety from the program, mechanism, inspection of three aspects.

First, from the standardization of quality and safety supervision procedures to promote the supervision of water conservancy projects according to law. Strictly according to the supervision and management of water conservancy project quality regulations, the implementation of water conservancy project quality supervision project legal person application system. Do quality supervision application procedures, quality supervision is based on. Further improve the construction unit to ensure that the supervision unit control, project owners responsible for quality supervision agencies to monitor the quality of water conservancy projects based on the quality management system to ensure that the quality management work to meet the requirements of the project construction, so that the quality of the project is always under control.

The second is to start from the innovative working mechanism, to explore the concept of mass quality management. Strengthen the water conservancy project quality legal education, enhance the quality of the masses of legal awareness. Clearly the property rights of reservoirs and ponds, the transformation of rural water conservancy construction is the old concept of the higher water conservancy departments, to improve the village collective sense of ownership. And in the construction of rural collective reservoirs and ponds, gradually try to let the villagers participate in the supervision and management. In order to strengthen the quality and safety management, to explore the establishment of quality supervisors, project contacts, water conservancy, village representatives to participate in the project quality and safety supervision group, to truly achieve the group policy group management.

Three is from the in-depth inspection of the first line to ensure the quality and safety of water conservancy projects. According to the construction progress of the project, the quality supervision group using a combination of tour and key inspection random sampling. Sometimes also combined with other work of water conservancy unannounced inspection, such as combined with flood control inspections in the construction project sampling.

In short, the project quality and safety inspection to do "no time, no fixed point, no item", to realize the owner of the unit, design units, supervision units, construction units at any time, any place, real-time docking. Problems found in the inspection are on-site photo evidence and produce on-site inspection of the letter of opinion, so that there is a check, there are requirements, there is feedback.

At present, the water conservancy project quality and safety supervision station issued 10 rectification notices, 17 inspection opinions, made 35 water conservancy project quality and safety supervision and inspection records, issued 19 quality supervision minutes, quality inspection notification of 3, the water administrative department notified the criticism of 2.

Second, sound quality management mechanism to ensure long-term management.

The party committee of the Bureau attaches great importance to the management of the quality of water conservancy projects, has always put the quality and safety of the project in the first place, requiring the formation of quality and safety of the entire Bureau of quality and safety of the management of the quality of the large quality management mechanism.

First, the implementation of project contact system. To do cadres everyone has a linked project, so that everyone involved in the project quality management. Between the sections do not separate management, project management to do collaborative, complement each other, in order to achieve a goal of "project quality, safety, progress and synchronization".

Second, the implementation of quality inspection system. Dare to be ugly, organized a monthly quality and safety inspection, inspectors went into the construction site, the entity quality of the project for a comprehensive verification. The problems found were dealt with accordingly, and inspection notices were issued and TV stations were invited to the scene to expose. Engineering quality management summary.

Third, the implementation of regular work meeting system. Small agricultural water key counties adhere to the regular monthly work meeting, listen to the work progress of the parties involved in the construction of the report and various types of proposals, and project progress notification. In the organization of the leaders in charge, the relevant business sections adhere to the regular weekly meetings, reporting weekly work and layout of the next step.

Third, there are problems

1, the local construction companies only two, on-site construction personnel of varying quality, construction companies focusing on the development of the phenomenon of light quality and safety is still occurring, on-site quality and safety management is not in place, the hidden trouble detection and management is not serious.

2, the project manager is weak. Now a lot of projects for the township formed by the project manager, the institution is not sound, technical force is not supporting. In addition to the water conservancy staff engaged in certain related business, it can be said that the project legal person has no reality.

3, supervision of the performance of duties to be improved. Water conservancy projects are generally small projects, remote location and other characteristics, supervisors can not always live on site. There are also on-site supervisors have insufficient practical experience, responsibility is not high, resulting in poor supervision and guidance.

4, in the project quality and safety control measures are not much, basically the person in charge. The quality and safety awareness of all parties involved in the construction is not strong. Quality supervision means is not strong, quality supervision requirements are not effectively implemented. Detection is absent, mainly by the funds, personnel, concepts and awareness of the impact, basically to the scene, the appearance of the subjective judgment of project quality and safety. There is simply no some professional third-party testing data as a reference.

5, water conservancy project quality and safety supervision station was established only about 1 year, not only to do a good job in 20xx water conservancy project quality and safety supervision, but also according to the work of the safety to do a good job for many years to accumulate down the old project aftermath. The previous project due to many factors, resulting in the construction of the parties involved in the collection of information seriously lagging behind, to the acceptance of the project caused great difficulties.

6, the water administration department in the face of the project more, fewer staff, management is difficult to full coverage, in place, some professional knowledge can not be instantly updated, than the rural drinking water project, spray micro-irrigation project, ecological embankment, green landscape supporting management services is difficult to keep up.

7, water conservancy project quality and safety supervision station, although two people are currently in the post, but one still has a large number of reservoirs in addition to the consolidation project has not been swept, the other still have to take care of the work of production safety, coupled with the key counties of small rural water, reservoirs in addition to the consolidation of the 20xx years before the acceptance of the legacy of the project, and so on, the real draw on the quality of the safety supervision of the time on the overall biased small.

Fourth, the next step

Further rationalize the quality and safety management system, enhance the quality and safety management level, and promote the healthy and orderly development of water conservancy projects in our county.

1, guidance to cultivate the local market, the effective use of market competition mechanism to promote the healthy development of water conservancy construction market.

2, strengthen the daily inspection and supervision, improve the management level of project owners, supervision units and the ability to fulfill their duties.

3, multi-pronged, all-round quality and safety supervision. Increase the quality of the project testing efforts to quality testing as a means to promote the steady improvement of project quality.

4, with professional supervision as the main, and gradually introduce social supervision force, so that the project quality sunshine.

5, strengthen the training of professional knowledge, knowledge update, so that our managers are always at the forefront of technology.

Part III

xx project since April 1, 20xx formally started, so far it has been more than a year. In this year's time, xx project department always adhere to the "implementation of comprehensive management, enhance the implementation of" as the core concept of project management and the guiding ideology of the work. Seriously study and implement the provisions of the company's management system, based on the characteristics of the project, combined with the owner's quality requirements, well-designed, integrated planning, the establishment of a sound project internal quality management system and related procedural documents. Clearly defined job responsibilities and basic work ideas, for the smooth and orderly development of the construction of housing projects to lay the foundation.

Since entering 20xx, the main structure of all 18 buildings was topped out at the end of May, and the project entered the subsequent secondary structure, decorative decoration, door and window installation, exterior wall coating, plumbing, heating and water heating installation and other construction processes, compared to the main structure, the latter part of the construction process is more, the process is more intersectional, the protection of finished products is difficult, and other cumbersome aspects, which will put forward the future quality control objectives of higher requirements, according to the target requirements, the project department is the only project that can meet the requirements of the quality control objectives. Requirements, according to the target requirements, the project department at the beginning of the year on the quality of the work plan for a detailed decomposition, according to the specialty of the technical quality personnel re-partitioning, grouping, and increase the quality control of the construction process. And in October this year, on behalf of the Bureau of housing construction project construction qualification audit, successfully passed the China Three Gorges Certification Corporation quality system review, the branch and the Bureau of the relevant departments of the praise. Now on the xx project quality management work is summarized as follows:

First, the project's internal quality system and the implementation of the quality responsibility system

Combined with the actual situation of the project and the characteristics of the project, the xx project department has established a project manager as the core of the quality assurance system, and the implementation of the project manager's leadership of the quality management of the system of responsibility. To do the work of each department, each team, each position functions and responsibilities are clear, the competent elements are clear, the professional interface is closely linked, the quality management of each department is coordinated, the quality management information channels are smooth, to ensure the efficient and orderly operation of the project's internal quality system.

The project leadership team also analyzed the project structure and quality control work with members of the project department, and the key difficulties of the project quality management work, and the weak links of the previous project quality management work, careful planning, careful deployment, to achieve key control of key parts, the main processes are responsible for the quality of the person responsible for the management and control of the current construction of the 18 buildings, the project from the new to determine the responsibility of the person, to truly realize the duty to the post, the duty to the person, and the duty to the person. The project has newly determined the responsibility person to truly realize the responsibility to the post, the responsibility to the person, the responsibility to the work process. According to the requirements of the company's management system, the laws and regulations involved in the construction of the project and the proposed use of standards and norms to identify the fit, to ensure its effectiveness and practicality.

Follow the cycle of "P-D-C-A" process, the effective implementation of continuous improvement, and constantly improve the quality management system of the project department, so that it can better guide the work of the project department to ensure the smooth realization of the quality objectives set by the project, and complete the construction tasks with high quality and efficiency.

Second, the quality management program and system preparation and implementation

According to the requirements of the company's system documents and project control focus on the difficult points, targeted preparation of special work program documents and implementation programs. For the current construction process changes, xx project from the new revision of the document information preparation regulations, project quality plan, project measuring instruments and equipment management regulations, project quality inspection plan, project nonconforming products processing regulations, quality of work awards and penalties rules, and other quality management system and sub-parts of the construction program.

Strict implementation of the technical briefing system, and effectively do not construction without briefing, before the start of each job on all the major sub-projects and processes to participate in the construction and management personnel to carry out a detailed technical briefing to clarify the construction procedures, processes, operation points, quality requirements and safety precautions.

According to determine the inspection, test object, way, according to the requirements of the selection to meet the accuracy requirements of a variety of inspection, measurement and testing equipment. Project use of all measuring and metrological instruments and equipment before entering the field, be sure to follow the project measuring instruments and equipment management regulations, check the measuring instruments and equipment is intact, whether it has a qualified verification report and identification of the results in the validity period, no measurement verification certificate or more than the validity of the measurement instruments, prohibited for use in the inspection and testing related to the quality of the project. Enter the site of qualified measuring instruments and equipment for registration, the establishment of measurement accounts. In advance of the development of measuring instruments and equipment inspection program, and timely recovery of measuring instruments and equipment in use is about to expire, to prevent the use of unqualified measuring instruments and equipment to affect the quality of the project, and even cause rework.

The establishment of an effective incentive mechanism to stimulate the enthusiasm of the majority of workers. The project department compiled the quality work award and punishment rules, and weekly/monthly cycle for assessment and selection, on the project quality management work in the outstanding performance and excellent quality of the project entity mass and individual notification of praise and material rewards.

For example: the project department stipulates that when the plastering construction, there are 4 households in each layer, and the quality is checked after the completion of plastering, if the number of cracks and hollow drums in each household is within 3 after checking, it will be rewarded 200 yuan for the construction personnel of this team, and 30 yuan will be rewarded to the quality inspector in charge of this building number. Effectively incentivize everyone to strive for advanced intentionality, improve the overall quality of the project works.

Third, quality education and training

Since the start of this year, the Ministry of the project, the organization of the two "100 days of work" labor competition activities, two system audits, a system of external audits. Owners, higher competent units and development zone leaders have been to my project department to carry out special inspection activities, can be said to be a variety of inspection work throughout the construction process of the xx project.

Numerous inspections and quality activities to the project quality management team put forward a higher, more serious challenge, but also brought the opportunity to exercise the team and platform. The project department took this as an opportunity to do a lot of heartfelt and effective quality publicity work, and strengthened the quality awareness of managers at all levels and all construction personnel.

The project department for the spirit of the activities, carried out the corresponding quality culture, professional and technical knowledge of special education and learning. In the actual work, pay attention to carry forward the "pass, help, take" the spirit of mutual assistance, to create a "catch up, help, super" competitive atmosphere, and cultivate a good learning culture. Organize professional and technical proficiency, experienced master workers in the conference room to the other construction workers to lecture, share their own work experience.

We speak widely, *** with the construction process of quality problems, summarize the experience of improving personal technical skills, to complement the shortcomings, *** with the improvement. In the education and training and daily work, and every master worker to make friends, so that the young technical cadres in the quality of education and training in the education, improve, and receive the effect, so that every employee of the Department of the project to establish a "my quality, my duties, my commitment" and "the pursuit of Never-ending, the product represents the human character" concept, to promote the majority of workers from "to learn", "to be advanced" to "I want to learn", "I strive for advanced", "I want to learn", "I want to learn", "I want to learn", "I want to learn", "I want to learn", "I want to learn". "I strive for advanced" idea change, greatly improving their professional and technical level and product quality awareness. The project department always adhere to each outstanding workers as a branch of the valuable resources and wealth, set up a good example of staff, for the future control and improvement of construction quality has laid a solid foundation.

Fourth, the construction phase of quality control

The quality management work of the project department adhere to the "weekly plan control, monthly plan mandatory" site management system. Quality departments should be coordinated, *** with the analysis of the quality control focus of the sub-projects and construction difficulties, the detailed development of practical solutions, the development of detailed measures. The establishment of a number of communication platforms such as pre-shift meeting, technical briefing and special meetings, strengthen the construction process quality inspection and acceptance, strengthen the exchange of information to ensure that the quality of the Ministry of the project information channels, thus ensuring the quality of engineering construction.

The organization of the professional and technical personnel and team leaders, widely carried out "comprehensive inspection, special treatment, one by one elimination" of the comprehensive inspection, and will be included in the project quality management system, normalized. Combined with the inspection status, the development of corrective and preventive measures, and write a written circular, the implementation of the model to lead the way, praise the advanced, spurring the latter. Obedience to construction units, supervision units, design units, quality inspection station inspection, guidance and supervision of the work, a modest understanding of their recommendations, and heart and construction units, supervision units to do a good job with the work.

The project quality control focus, difficulties and check out the weak links in the project work list, as the weekly quality work theme. Concentrate on the quality control priorities, difficulties and weak links one by one to track and check the cycle of quality main week.

Each profession establishes a perfect on-site inspection database, analyzes the on-site quality data, summarizes this week's quality rectification status, and formulates next week's quality work plan. Engineering technology quality personnel to follow the work, at any time to solve the technical problems in construction. Quality inspectors have the right to veto the quality, found contrary to the construction procedures, the use of substandard materials, quality inspection personnel have the right to stop, found that the problem immediately reported to the competent leadership, and quickly put forward a solution to nip quality problems in the bud.

For example, in June and July, the construction of the interior wall plastering project, before the construction of the first construction program and measures, the construction process of the existence of problems that can affect the quality of the construction of a comprehensive analysis, the development of measures to deal with the construction of the plastering construction of the main body of the structure after the pouring of the headroom, the net high level of a comprehensive review and record, during the construction process, to supervise the work zone During the construction process, the construction personnel are urged to check in time, and the project department stipulates that every day in the morning and afternoon, the quality technicians of each building take the testing instruments and equipments to check the whole number of work surfaces with operators, and correct and solve the problems in time to ensure that the construction of the completed sub-items of the project can reach the requirements of the construction specifications, and for the problems of hollowing drums that appear in the late stage due to the reasons, the problems will be handled in accordance with the repair program. Processing, the final construction is completed, again on the room headroom, net height, yin and yang corners and other elements of the full number of inspections, and summary records, to prevent in the process of handing over the next year, the small owners of the phenomenon of pestering and claims.

Fifth, make the project completion acceptance work

At present, we have already entered the month of December, April next year, the date of handover has been very close, xx also moved house is a special project, next year, after the handover in addition to the need to go through the construction, supervision and acceptance of the unit, you also need to go through the acceptance of the households that is, the owners of the small property in order to complete, in order to ensure smooth completion acceptance next year, in order to ensure smooth completion acceptance next year. In order to ensure the smooth completion and acceptance next year, the site quality inspection and acceptance work should be strictly in accordance with the quality inspection plan approved by the units for control. The sub-projects must be in accordance with the quality inspection program to determine the level of inspection and control point requirements, one by one for closure.

Before the acceptance of the project, the organization of all relevant departments and personnel within the project pre-acceptance, will check out the list of problems, one by one must be responsible for the duties, personnel, measures, and rectification time, tracking and checking the results of rectification. Through the above measures in the construction and the completion of the acceptance of the project before the self-inspection measures to ensure the smooth acceptance of the completion of the project.

In the past year, through the project department of all members of the *** with the efforts of the xx project department successfully through the various inspections and reviews, the quality of work by the owners, supervisors and all parties involved in the unanimous praise. Acceptance of sub-projects a pass rate of 96%. We believe that as long as the quality management personnel at all levels of the project department make concerted efforts, the top and bottom of the heart, we must be able to complete the project in the quality of work, and constantly improve the level of quality management, the successful completion of the project construction tasks and quality objectives.