Traditional Culture Encyclopedia - Traditional culture - Farm ground photovoltaic need what formalities
Farm ground photovoltaic need what formalities
Photovoltaic power generation built on arable land to apply for administrative approval procedures,
Mainly divided into three types of approval procedures: land approval procedures, planning approval procedures, construction approval procedures.
In a nutshell, these three types of approvals are mainly, on-site land siting and access. The land siting is divided into the photovoltaic area and the civil part of the booster station; access is divided into the electrical part of the booster station and the transmission line part.
- Previous article:202 1 inventory of where to play during the Spring Festival in Nanjing
- Next article:Talking about Ru Shi Tao
- Related articles
- What are the costumes, diets and customs of the Dai people?
- The traditional economy is a linear economic development model with one-way flow of "resource-product-pollution emission", while the circular economy is a linear economic development model with one-wa
- This paper discusses the main ways to legalize Confucianism in Han Dynasty.
- LOL what are all the good choices for assist in the current version?
- How to turn on the intelligent mode of air conditioner?
- How to change win7 into a traditional start menu?
- How can stinky tofu stink?
- My specialty 6th grade essay 5 (clay figure pinching)
- Four ability indexes of financial analysis
- Method for making horseshoe crisp