Traditional Culture Encyclopedia - Traditional culture - Installation steps of wallboard

Installation steps of wallboard

Start the installation from the corner.

The installation of wallboard should start from the corner. According to the board layout, transport the two boards in the corner to the installation site. According to the height of the plate beam and the type of angle iron for fixing the nylon bolt with mushroom head, drill holes at the corresponding elevation position in the middle of the plate width. When drilling, the electric drill should be perpendicular to the board surface, and the mushroom head nylon bolt should be placed on the hole. ...

Check the convex groove or groove of the wallboard.

After installing two wall panels in the corner, start to install the next wall panel along the corner. Before the installation of the next wallboard, two layers of white sealing paste should be coated in the convex groove or groove of the ground floor slab. ...

Fix with a hammer

First, use a hammer between two boards.