Traditional Culture Encyclopedia - Traditional culture - Software for calculating working hours aided by mechanical quotation
Software for calculating working hours aided by mechanical quotation
References:
/read.php? Tid = 48903No Equipment name, type, number, processing range, processing fee
(yuan/) 1 lathe c 616 φ 320× 750 ~10012 lathe c 6140 φ 400×1000 ~. +050 φ 460×1000 ~ 2000155 lathe c630 φ 630×1000 ~ 2000216 lathe c650 φ 800×1500 ~ 50000. 438+069 radial drilling machine Z 3080 φ 8020 10 vertical drilling machine z5140a φ 32 ~ φ 40121horizontal boring machine t681000x/kloc. 0030 13 vertical boring machine t 4163630×105614 horizontal boring machine t 611/kloc- ~10015160,000 energy cylindrical grinder m1432am9025× 500 ~100019170,000 energy cylindrical grinder m/kloc. +0331φ 315 ~ 320×1500 ~ 30002619 universal cylindrical grinder m1450 φ 500×1500 ~ 200026. 438+0432 φ12 ~ φ100×1322 surface grinder M7120200× 630 ~ 6501623 surface grinder M7. Rail grinder m 501001000× 60002826 spline grinder m 8612aφ120×18002827 thread grinder y 7520 wφ200×5002028 gear grinder y4628. Bed MW 6020 φ 200× 5001331universal tool grinder M9025 φ 200× 650 1632 universal tool grinder M6025h φ 250× 650 1633 universal tool grinder m6425 φ 250× 653. ×1500 ~17001635 gear hobbing machine YM 3 150E φ 500× 8m2236 bar rack ym5150b φ 500× 8m1837 vertical milling machine x500. +0250 1839 vertical milling machine xa 5032 φ 320×12501840 horizontal milling machine x63w φ 400×1600 2441ram milling machine XS5646/ 1 φ 425× 20002842 planer b 65650×80065438+46 planer B2016A900 ~1002847 planer B2020A2000~60005048 rod bed B5032200 ~ 320/KLOC. 3052 die fitter φ 200× 6503053 machining center φ 200× 6508054 wire cutting φ 200× 650955 welding tool φ200×6507 sofa die price calculation.
1. Empirical calculation method
Mold price = material fee+design fee+processing fee and profit+value-added tax+mold trial fee+packaging and transportation fee.
The ratio is usually:
Material cost: materials and standard parts account for15%-30% of the total mold cost;
Processing fee and profit: 30%-50%;
Design fee:10%-15% of the total mold cost;
Test mold: large and medium-sized molds can be controlled within 3%, and small precision molds can be controlled within 5%;
Packaging and transportation fee: it can be calculated according to the actual situation or 3%;
VAT: 17%
2. Material coefficient method
According to the mold size and material price, the mold material cost can be calculated.
Mold price =(6~ 10)* material cost
Forging die and plastic die =6* material cost
Die casting die = 10* material cost stamping die =3* material cost die quotation estimate 1 First of all, it depends on the customer's requirements, because the requirements determine the material selection and heat treatment process.
2. Choose good materials, draw a rough mold plan, calculate the mold weight (calculate the price of mold core material and mold base material) and heat treatment cost. (All weights are blank)
3. Processing cost. According to the complexity of the mold core, the processing cost is generally 1.5 ~ 3: mold core material 1, mold base 1.
4. The risk expense is 10% of the above total price.
5. tax
6. The design fee is 10% of the total mold price. Jiangsu heat treatment process coordination price
Remarks on Project Unit Price (Yuan)
First, annealing
High temperature annealing (> 900℃) kg 1.50
Medium temperature annealing (650-900℃) Kg 1.20
Low temperature annealing (< 650℃) kg 0.90 All spheroidization, diffusion and sealing require 30% pressurization.
Second, normalization.
Fuel furnace normalizing 0.70
Electric furnace normalizing 1.05
Salt furnace normalizing 1.20
Three, salt furnace quenching (including tempering)
Medium temperature quenching (< 900℃)
High temperature quenching (> 900℃)
Quenching of high speed steel
Roller quenching ≤φ≤φ 150mm
φ151-φ 250mm
> φ 250mm
2.50
4.50
1 1.00
3.20
4.00
4.80 The price of tools and dies will increase by 50%, and the price of solid solution treatment will increase by 10%.
Fourth, conditioning
Salt furnace tempering
Electric furnace tempering
kilogram
kilogram
2.60
2.30
1.> Tempering price at 900℃ is increased by 50%.
2. The tempering of fuel furnace is reduced by 50% according to the tempering of salt furnace.
Five, carburizing and carburizing quenching
Solid and liquid carburizing
Solid and liquid carburizing+quenching
Gas carburizing ≤0.8 mm
≤0.8 Direct quenching
≤1.2mm
≤ 1.2 direct quenching
kilogram
kilogram
kilogram
kilogram
kilogram
kilogram
1.40
3.90
3.60
4.30
4.00
4.80 Controlled protective atmosphere carburizing and quenching (carbon potential control) will increase the price by 30%.
Gas carburizing ≤1.6mm.
≤ 1.6 direct quenching
≤2mm
2 kg of direct quenching
kilogram
kilogram
4.50 kg
5.30
5.30
6.00
Gas carbonitriding (including quenching)
≤ 0.15mm
≤0.40 mm
> 0.40 mm
kilogram
kilogram
kilogram
5. 10
5.70
6.30
Six, flame and high intermediate frequency quenching
1. Axis type:
The shaft diameter is less than φ 30mm.
φ φ3 1-60/-60mm
Φ φ6 1-90/-90mm
φ 91-120mm
φ121-200mm
2. Aircraft class:
3. Gear:
Modulus m < 3 diameter
- Previous article:The main representative of the "Warring States Policy School". Brief introduction of Lin Tongji
- Next article:What brand is cowboy?
- Related articles
- How much does it usually cost to ask Shanghai moving company to move?
- The ancients read an Analects of Confucius.
- 5 minutes to read traditional articles
- How to make delicious food with clay
- What did the Year of the Tiger say about tigers?
- Find out what snacks are easy to sell and suitable for setting up stalls.
- How about dozens of sets of Ruyao tea sets?
- How much does it usually cost to buy a brand fishing rod with good quality and firmness?
- How does face changing work?
- How to fix face in silhouette